Intended Use Plan for the NYS Drinking Water State Revolving Fund
Multi-Year List for October 1, 2002 to September 30, 2003
Albany - Franklin
| Project | County | System Name/ Borrower |
Description | Pop. | Project Cost |
Score | Cumulative Total |
|---|---|---|---|---|---|---|---|
| ALBANY COUNTY | |||||||
| 17084 | Albany | COHOES CITY / Cohoes (C) | Phase 2 of #15772, Upgrade Water Treatment Plant | 16,825 | $1,469,000 | 2085 | $1,469,000 |
| 15661 | Albany | RENSSELAERVILLE WD / Rensselaerville (T) | New Ground Water Source, Upgrade Storage, Upgrade Distribution System | 114 | $1,118,973 | 190 | $2,587,973 |
| 15525 | Albany | WESTERLO COMMUNITY WATER DISTRICT / Westerlo (T) | New system to serve area with private contaminated wells, consolidate public water supply, eliminate public water supply with past E. Coli detection. , New Complete System (New System), System Consolidation | 280 | $1,700,000 | 190 | $4,287,973 |
| 15950 | Albany | GUILDERLAND TOWN WD / Guilderland (T) | Phase III Improvements, New Storage, Extend Distribution System, Upgrade Distribution System, New Inter-Connection | 30,000 | $11,464,980 | 75 | $15,752,953 |
| 17047 | Albany | LATHAM WATER DISTRICT / Colonie (T) | Upgrade Water Treatment Plant | 78,500 | $23,387,045 | 70 | $39,139,998 |
| 16670 | Albany | ALTAMONT RD. WATER DISTRICT / New Scotland (T) | Extension of Village of Voorheesville system into the Town of New Scotland, New Distribution System | 93 | $354,820 | 70 | $39,494,818 |
| 16245 | Albany | COHOES CITY / Cohoes (C) | Upgrade Distribution System | 16,825 | $2,157,961 | 50 | $41,652,779 |
| 16449 | Albany | GREEN ISLAND VILLAGE / Green Island (V) | Extend Distribution System | 3,800 | $430,643 | 50 | $42,083,422 |
| 15282 | Albany | LATHAM WATER DISTRICT / Colonie (T) | Upgrade Water Treatment Plant | 78,500 | $7,322,400 | 45 | $49,405,822 |
| 15705 | Albany | ALBANY CITY / Albany (C) | Pearl Street Reconstruction, Phase 1, Upgrade Distribution System | 101,082 | $2,260,000 | 45 | $51,665,822 |
| 15417 | Albany | KRUMKILL RD. WATER DISTRICT / New Scotland (T) | Extend Distribution System | 45 | $35,030 | 45 | $51,700,852 |
| 15698 | Albany | ALBANY CITY / Albany (C) | 1997 Capital Improvement Program, Upgrade Distribution System | 101,082 | $1,525,500 | 40 | $53,226,352 |
| 15747 | Albany | ALBANY CITY / Albany (C) | New Transmission | 101,082 | $11,300,000 | 40 | $64,526,352 |
| 16244 | Albany | COHOES CITY / Cohoes (C) | Upgrade Distribution System | 16,825 | $1,035,694 | 40 | $65,562,046 |
| 15129 | Albany | NORTHEAST WATER DISTRICT / New Scotland (T) | New Complete System (New System) | 370 | $953,613 | 40 | $66,515,659 |
| 15300 | Albany | NORTHEAST WATER DISTRICT / New Scotland (T) | Extend Distribution System | 45 | $301,710 | 40 | $66,817,369 |
| 15446 | Albany | NORMANSKILL RD, WORMER RD WATER SYS. / New Scotland (T) | Extend Distribution System | 30 | $424,880 | 40 | $67,242,249 |
| 15395 | Albany | WATERVLIET CITY / Watervliet (C) | New Storage | 11,300 | $1,749,240 | 35 | $68,991,489 |
| 15720 | Albany | ALBANY CITY / Albany (C) | Upgrade Water Treatment Plant | 101,082 | $1,084,800 | 35 | $70,076,289 |
| 15397 | Albany | WATERVLIET CITY / Watervliet (C) | Upgrade Transmission | 11,300 | $235,605 | 30 | $70,311,894 |
| 15743 | Albany | ALBANY CITY / Albany (C) | Upgrade Distribution System | 101,082 | $6,780,000 | 30 | $77,091,894 |
| 15392 | Albany | WATERVLIET CITY / Watervliet (C) | Replace undersized lines - 1998, Upgrade Distribution System | 11,300 | $898,350 | 25 | $77,990,244 |
| 15393 | Albany | WATERVLIET CITY / Watervliet (C) | Replace undersized water mains provided insufficient flow & pressure-1997, Upgrade Distribution System | 11,300 | $359,001 | 25 | $78,349,245 |
| 15755 | Albany | RAVENA VILLAGE / Ravena (V) | New Storage | 4,500 | $562,175 | 20 | $78,911,420 |
| 15247 | Albany | LATHAM WATER DISTRICT / Colonie (T) | New Storage | 78,500 | $1,457,700 | 15 | $80,369,120 |
| ALLEGANY COUNTY | |||||||
| 16746 | Allegany | CANASERAGA VILLAGE PUBLIC WATER / Canaseraga (V) | New Ground Water Source | 900 | $1,196,050 | 165 | $81,565,169 |
| 17188 | Allegany | BELFAST WATER DISTRICT / Belfast (T) | Upgrade Water Treatment Plant, New Ground Water Source | 750 | $932,250 | 90 | $82,497,419 |
| 15760 | Allegany | ANGELICA VILLAGE PUBLIC WATER / Angelica (V) | Upgrade Surface Water Source, Upgrade Transmission, Upgrade Storage, Upgrade Distribution System | 950 | $2,836,300 | 85 | $85,333,719 |
| 17056 | Allegany | ANDOVER VILLAGE PUBLIC WATER / Andover (V) | Upgrade Storage, Upgrade Distribution System | 1,130 | $2,400,000 | 85 | $87,733,719 |
| 15925 | Allegany | TOWN OF WELLSVILLE / Wellsville (T) | Extend system to serve area with private contaminated wells, Morningside Area, Extend Distribution System | 5,000 | $867,106 | 70 | $88,600,825 |
| 15502 | Allegany | WELLSVILLE VILLAGE PUBLIC WATER / Wellsville (V) | New Storage | 5,700 | $1,330,010 | 50 | $89,930,835 |
| 15005 | Allegany | BELFAST WATER DISTRICT / Belfast (T) | New Storage | 750 | $359,510 | 45 | $90,290,345 |
| 16655 | Allegany | GENESEE HEIGHTS MOBILE HOME PK / Mr. & Mrs. Anzivine | New Ground Water Source, Upgrade Distribution System | 65 | $77,970 | 45 | $90,368,315 |
| 15547 | Allegany | FRIENDSHIP TOWN WATER DISTRICT / Friendship (T) | Upgrade Ground Water Source, Upgrade Storage, Upgrade Distribution System | 1,380 | $1,163,900 | 45 | $91,532,215 |
| 16636 | Allegany | BOLIVAR VILLAGE PUBLIC WATER / Bolivar (V) | New Storage, Upgrade Distribution System | 1,040 | $891,005 | 45 | $92,423,220 |
| 16747 | Allegany | CANASERAGA VILLAGE PUBLIC WATER / Canaseraga (V) | Upgrade Distribution System | 900 | $2,305,104 | 45 | $94,728,324 |
| 15943 | Allegany | ANDOVER VILLAGE PUBLIC WATER / Andover (V) | Upgrade Surface Water Source | 1,130 | $3,727,870 | 45 | $98,456,194 |
| 15953 | Allegany | SCIO WATER DISTRICT / Scio (T) | New Ground Water Source, Upgrade Ground Water Source, Upgrade Distribution System | 1,039 | $550,649 | 35 | $99,006,843 |
| 16154 | Allegany | BELMONT VILLAGE PUBLIC WATER / Belmont (V) | Trianna St. & Milton St., Upgrade Distribution System | 1,325 | $558,731 | 30 | $99,565,574 |
| 16156 | Allegany | BELMONT VILLAGE PUBLIC WATER / Belmont (V) | Greenwich St. to Allegany County Office Complex., Upgrade Distribution System | 1,325 | $458,585 | 30 | $100,024,158 |
| 15983 | Allegany | ALMOND VILLAGE PUBLIC WATER / Almond (V) | Upgrade Distribution System | 600 | $290,975 | 20 | $100,315,133 |
| BROOME COUNTY | |||||||
| 16160 | Broome | CHARLOTTE KENYON ELEMENTARY / Charlotte Kenyon School | New Water Treatment Plant, Upgrade Ground Water Source | 400 | $107,915 | 130 | $100,423,048 |
| 15567 | Broome | DEPOSIT VILLAGE / Deposit (V) | New Ground Water Source, New Transmission, New Storage, Upgrade Distribution System | 2,080 | $462,300 | 95 | $100,885,348 |
| 16262 | Broome | TOWN OF CONKLIN W.D. / Conklin (T) | Extend system to serve area with private contaminated wells, consolidate public water supply. , Inter-Connection, System Consolidation | 1,000 | $975,348 | 85 | $101,860,696 |
| 15231 | Broome | CHENANGO FORKS JR./SR. HS / Chenango (T) | System Consolidation | 1,300 | $128,255 | 70 | $101,988,951 |
| 16025 | Broome | PARK TERRACE WATER SYSTEM / Binghamton (T) | Extend system to serve area with private contaminated wells. , Extend Distribution System | 455 | $1,244,645 | 70 | $103,233,597 |
| 16175 | Broome | CONKLIN WD #1 / Conklin (T) | Upgrade Ground Water Source | 101 | $387,816 | 60 | $103,621,413 |
| 16804 | Broome | STILLWATER RD WD#6 / Conklin (T) | Extend Distribution System | 173 | $466,444 | 45 | $104,087,856 |
| 16801 | Broome | CHENANGO WD #8 / Chenango (T) | New Water District | 100 | $136,730 | 45 | $104,224,586 |
| 16802 | Broome | CHENANGO WD #4 / Chenango (T) | New Water District | 100 | $127,069 | 45 | $104,351,655 |
| 15969 | Broome | VESTAL CONSOLIDATED W.D. #1 / Vestal (T) | New Water Treatment Plant | 20,950 | $976,004 | 40 | $105,327,658 |
| 16541 | Broome | UNION TOWN WATER SYSTEM NO. 1 / Union (T) | Extend Distribution System | 21,000 | $7,232,254 | 40 | $112,559,913 |
| 16799 | Broome | CHENANGO WD #25 / Chenango (T) | New WD to serve private insufficient yielding wells area of Poplar Hill Road , New Complete System (New System) | 100 | $433,355 | 40 | $112,993,268 |
| 15764 | Broome | WINDSOR VILLAGE / Windsor (V) | Upgrade Pump Station, Upgrade Distribution System | 1,051 | $1,875,800 | 35 | $114,869,068 |
| 15489 | Broome | BINGHAMTON (C) / Binghamton (C) | South Side Water Storage Reservoir replacement,Hotchkins St., Upgrade Storage | 47,600 | $1,396,680 | 35 | $116,265,748 |
| 15215 | Broome | DICKINSON WD #2 / Dickinson (T) | Upgrade Pump Station, Upgrade Distribution System | 56 | $248,713 | 20 | $116,514,461 |
| 15973 | Broome | VESTAL CONSOLIDATED W.D. #1 / Vestal (T) | Upgrade Pump Station, Upgrade Distribution System | 20,950 | $361,391 | 10 | $116,875,851 |
| 15975 | Broome | VESTAL CONSOLIDATED W.D. #1 / Vestal (T) | Upgrade Pump Station | 20,950 | $212,121 | 10 | $117,087,973 |
| 15977 | Broome | VESTAL CONSOLIDATED W.D. #1 / Vestal (T) | New Storage | 20,950 | $1,885,518 | 10 | $118,973,491 |
| 15905 | Broome | CHENANGO CONSOLIDATED WD #1 / Chenango (T) | Upgrade Ground Water Source | 6,381 | $649,185 | 10 | $119,622,676 |
| 15971 | Broome | VESTAL CONSOLIDATED W.D. #1 / Vestal (T) | Upgrade Water Treatment Plant | 20,950 | $469,284 | 5 | $120,091,960 |
| CATTARAUGUS COUNTY | |||||||
| 17051 | Cattaraugus | MACHIAS TOWN WATER DISTRICT / Machias (T) | Phase 2 of DWRSF #15485., Upgrade Water Treatment Plant, New Ground Water Source, Upgrade Storage, Upgrade Distribution System | 700 | $150,000 | 2145 | $120,241,960 |
| 17040 | Cattaraugus | VERSAILLES WATER DISTRICT / Perrysburg (T) | New system to serve area with private contaminated wells, consolidate public water supply, eliminate public water supply with past E. Coli detection. , New Complete System (New System) | 145 | $1,200,000 | 175 | $121,441,960 |
| 17192 | Cattaraugus | CENTRAL WATER DISTRICT / Perrysburg (T) | Upgrade Water Treatment Plant, Upgrade Ground Water Source, New Transmission, Extend Distribution System | 400 | $2,700,700 | 135 | $124,142,660 |
| 16649 | Cattaraugus | SOUTH DAYTON VILLAGE / South Dayton (V) | New Water Treatment Plant, New Storage, Upgrade Distribution System | 661 | $289,461 | 100 | $124,432,121 |
| 15212 | Cattaraugus | OLEAN CITY / Olean (C) | Construct pre-stressed concrete tanks to replace uncovered finished water storage facilities., New Storage | 17,000 | $3,503,339 | 80 | $127,935,460 |
| 15000 | Cattaraugus | CATTARAUGUS VILLAGE / Cattaraugus (V) | Upgrade Water Treatment Plant, Upgrade Ground Water Source, New Storage, Upgrade Distribution System | 1,100 | $332,100 | 75 | $128,267,560 |
| 15768 | Cattaraugus | HINSDALE WATER DISTRICT / Hinsdale (T) | Upgrade Storage, Upgrade Distribution System | 350 | $483,100 | 70 | $128,750,660 |
| 16061 | Cattaraugus | GROVE STREET WATER SUPPLY / Yorkshire (T) | Extend system to serve area with private contaminated wells. , Extend Distribution System | 70 | $64,523 | 65 | $128,815,183 |
| 15211 | Cattaraugus | OLEAN CITY / Olean (C) | New Water Treatment Plant | 17,000 | $11,232,200 | 60 | $140,047,383 |
| 15756 | Cattaraugus | LIMESTONE VILLAGE / Limestone (V) | New Ground Water Source, New Storage, Upgrade Distribution System | 459 | $1,356,000 | 50 | $141,403,383 |
| 15017 | Cattaraugus | SALAMANCA CITY / Salamanca (C) | Upgrade Ground Water Source | 7,000 | $960,500 | 50 | $142,363,883 |
| 16247 | Cattaraugus | SALAMANCA CITY / Salamanca (C) | Upgrade Storage | 7,000 | $1,706,300 | 50 | $144,070,183 |
| 16563 | Cattaraugus | EAST RANDOLPH VILLAGE / East Randolph (V) | Upgrade Transmission | 629 | $319,949 | 35 | $144,390,132 |
| 15544 | Cattaraugus | PERRYSBURG (V) / Perrysburg (V) | New Transmission, Upgrade Distribution System | 404 | $372,900 | 35 | $144,763,032 |
| 15763 | Cattaraugus | PORTVILLE VILLAGE / Portville (V) | Upgrade Distribution System | 1,136 | $494,570 | 35 | $145,257,603 |
| CAYUGA COUNTY | |||||||
| 17054 | Cayuga | SPRINGPORT WATER DISTRICT NO. 2 / Springport (T) | Cayuga Lake Intercommunity Water Board - Towns of Springport and Fleming. Extend to serve private contaminated wells., New Storage, Extend Distribution System, New Inter-Connection | 1,500 | $9,993,000 | 115 | $155,250,603 |
| 15780 | Cayuga | AURORA VILLAGE / Aurora (V) | New Water Treatment Plant, New Surface Water Source | 526 | $974,576 | 110 | $156,225,179 |
| 15023 | Cayuga | AUBURN / Auburn (C) | Filter rehabilitation and clarifier renovations., Upgrade Water Treatment Plant | 29,788 | $4,370,445 | 85 | $160,595,624 |
| 15127 | Cayuga | FAIR HAVEN VILLAGE / Fair Haven (V) | Upgrade Ground Water Source, New Storage, Upgrade Distribution System | 1,000 | $1,055,985 | 85 | $161,651,609 |
| 15970 | Cayuga | LOCKE W D / Locke (T) | Upgrade Ground Water Source, Upgrade Distribution System | 600 | $565,735 | 80 | $162,217,343 |
| 16337 | Cayuga | MONTEZUMA W D #1 / Montezuma (T) | Upgrade Distribution System, New Distribution System | 490 | $4,295,373 | 80 | $166,512,716 |
| 15751 | Cayuga | GENOA-KING FERRY WD / Genoa (T) | Upgrade Water Treatment Plant, Upgrade Storage, Upgrade Distribution System | 800 | $1,175,200 | 80 | $167,687,916 |
| 16762 | Cayuga | UNION SPRINGS VILLAGE / Union Springs (V) | New Water Treatment Plant | 2,000 | $186,450 | 70 | $167,874,366 |
| 16114 | Cayuga | CAYUGA VILLAGE / Cayuga (V) | Upgrade Water Treatment Plant, Upgrade Surface Water Source, Upgrade Distribution System | 600 | $870,100 | 65 | $168,744,466 |
| 16161 | Cayuga | PORT BYRON VILLAGE / Port Byron (V) | Upgrade Transmission | 1,400 | $1,610,250 | 65 | $170,354,716 |
| 17091 | Cayuga | BRUTUS WATER DISTRICT NO. 2 / Brutus (T) | New Complete System (New System) | 1,500 | $3,508,215 | 65 | $173,862,931 |
| 16163 | Cayuga | THROOP WD NO1 / Throop (T) | Extend Distribution System, Upgrade Distribution System | 400 | $2,214,960 | 60 | $176,077,892 |
| 15018 | Cayuga | FLEMING WD / Fleming (T) | New Storage, Upgrade Distribution System, Inter-Connection | 1,800 | $1,629,460 | 50 | $177,707,352 |
| 15026 | Cayuga | AUBURN / Auburn (C) | Upgrade Transmission, Upgrade Pump Station | 29,788 | $363,719 | 50 | $178,071,070 |
| 15904 | Cayuga | AURELIUS WD NO 1 / Aurelius (T) | Extend Distribution System | 440 | $2,421,240 | 50 | $180,492,310 |
| 15050 | Cayuga | AUBURN / Auburn (C) | Upgrade Surface Water Source | 29,788 | $731,686 | 45 | $181,223,996 |
| 15043 | Cayuga | AUBURN / Auburn (C) | Reservoir relining and leak repair., Upgrade Storage | 29,788 | $1,020,158 | 45 | $182,244,155 |
| 15949 | Cayuga | MORAVIA VILLAGE / Moravia (V) | Upgrade Distribution System | 1,600 | $892,248 | 40 | $183,136,403 |
| 15546 | Cayuga | AUBURN / Auburn (C) | Upgrade Distribution System | 29,788 | $1,241,299 | 40 | $184,377,702 |
| 16759 | Cayuga | CAYUGA COUNTY WATER & SEWER AUTHORITY / Cayuga Co. Water & Sewer Auth. | New Water Treatment Plant, New Storage, New Distribution System | 5,900 | $28,964,985 | 35 | $213,342,687 |
| 15634 | Cayuga | SENNETT WD #1 / Sennett (T) | Upgrade Distribution System | 200 | $531,483 | 25 | $213,874,170 |
| 15631 | Cayuga | SENNETT WD #3 / Sennett (T) | Upgrade Distribution System | 400 | $347,769 | 20 | $214,221,939 |
| CHAUTAUQUA COUNTY | |||||||
| 16775 | Chautauqua | TOWN OF PORTLAND WATER DISTRICT NO. 5 / Portland (T) | Extend to serve private contaminated wells, consolidate public water supplies, eliminate public water supply with past turbidity violations., Extend Distribution System | 400 | $227,100 | 155 | $214,449,039 |
| 15787 | Chautauqua | CLYMER WATER DISTRICT / Clymer (T) | New Ground Water Source | 650 | $226,000 | 100 | $214,675,039 |
| 17059 | Chautauqua | TOWN OF SHERIDAN ROUTE 5 WATERLINE / Sheridan (T) | Extend to serve private contaminated wells, consolidate public water supplies., Extend Distribution System | 280 | $1,600,000 | 90 | $216,275,039 |
| 15236 | Chautauqua | SHERMAN VILLAGE / Sherman (V) | Address total Coli violations., Upgrade Distribution System | 917 | $898,350 | 85 | $217,173,389 |
| 16818 | Chautauqua | HANOVER WD NO1 / Hanover (T) | New Storage, Upgrade Distribution System | 3,000 | $6,000,000 | 70 | $223,173,389 |
| 16012 | Chautauqua | WESTFIELD (V) / Westfield (V) | East Main St., Upgrade Distribution System | 3,450 | $675,088 | 70 | $223,848,477 |
| 15617 | Chautauqua | HANOVER WD NO1 / Hanover (T) | Extension #4., Extend Distribution System | 3,000 | $752,919 | 70 | $224,601,396 |
| 16559 | Chautauqua | HANOVER WD NO1 / Hanover (T) | Extend Distribution System | 3,000 | $1,454,875 | 65 | $226,056,271 |
| 16406 | Chautauqua | FORESTVILLE VILLAGE / Forestville (V) | Upgrade Distribution System | 804 | $226,000 | 60 | $226,282,271 |
| 15021 | Chautauqua | DUNKIRK CITY / Dunkirk (C) | Extension to (T) of Sheridan and (V) of Silver Creek., New Transmission, System Consolidation | 15,310 | $3,988,900 | 60 | $230,271,171 |
| 15124 | Chautauqua | DUNKIRK CITY / Dunkirk (C) | Extension to (T) of Portland and (V) of Brocton., New Transmission, New Pump Station, System Consolidation | 15,310 | $3,293,950 | 60 | $233,565,121 |
| 16014 | Chautauqua | WESTFIELD (V) / Westfield (T) | New Distribution System | 3,450 | $587,939 | 60 | $234,153,060 |
| 15189 | Chautauqua | BROCTON VILLAGE / Brocton (V) | Upgrade Water Treatment Plant | 4,000 | $3,220,500 | 55 | $237,373,560 |
| 16188 | Chautauqua | WESTFIELD (V) / Westfield (V) | Upgrade Water Treatment Plant | 3,450 | $2,019,780 | 50 | $239,393,340 |
| 16613 | Chautauqua | MAYVILLE VILLAGE / Mayville (V) | Upgrade Ground Water Source, Upgrade Transmission, Upgrade Storage, Upgrade Distribution System | 1,630 | $1,104,891 | 50 | $240,498,231 |
| 16908 | Chautauqua | TOWN OF BUSTI WATER DISTRICT #3 / Busti (T) | Extend Distribution System | 450 | $847,500 | 50 | $241,345,731 |
| 15022 | Chautauqua | DUNKIRK CITY / Dunkirk (C) | Upgrade Water Treatment Plant, Upgrade Distribution System | 15,310 | $3,080,380 | 40 | $244,426,111 |
| 16296 | Chautauqua | SINCLAIRVILLE VILLAGE / Sinclairville (V) | Upgrade Ground Water Source, Upgrade Pump Station | 772 | $56,500 | 40 | $244,482,611 |
| 15724 | Chautauqua | LAKEWOOD VILLAGE / Lakewood (V) | New Transmission, New Pump Station, Inter-Connection | 5,100 | $983,100 | 40 | $245,465,711 |
| 16183 | Chautauqua | WESTFIELD (V) / Westfield (V) | E. Main Street and Cass Street., Upgrade Distribution System | 3,450 | $290,643 | 35 | $245,756,354 |
| 16184 | Chautauqua | WESTFIELD (V) / Westfield (V) | Oak St., Upgrade Distribution System | 3,450 | $102,045 | 35 | $245,858,399 |
| 16022 | Chautauqua | FREDONIA VILLAGE / Fredonia (V) | New Transmission, Upgrade Distribution System, System Consolidation | 10,400 | $809,984 | 35 | $246,668,383 |
| 16609 | Chautauqua | HANOVER WD NO1 / Hanover (T) | Upgrade Distribution System | 3,000 | $347,136 | 35 | $247,015,519 |
| 16024 | Chautauqua | FREDONIA VILLAGE / Fredonia (V) | New Transmission, New Storage | 10,400 | $880,496 | 30 | $247,896,015 |
| 16181 | Chautauqua | WESTFIELD (V) / Westfield (V) | Clean & reconstruct waterlines., Upgrade Distribution System | 3,450 | $678,000 | 30 | $248,574,015 |
| 16665 | Chautauqua | WESTFIELD (V) / Westfield (V) | Upgrade Distribution System | 3,450 | $61,209 | 30 | $248,635,224 |
| 16294 | Chautauqua | SINCLAIRVILLE VILLAGE / Sinclairville (V) | Upgrade Distribution System | 772 | $50,850 | 30 | $248,686,074 |
| 15725 | Chautauqua | LAKEWOOD VILLAGE / Lakewood (V) | New Storage | 5,100 | $632,348 | 10 | $249,318,422 |
| CHEMUNG COUNTY | |||||||
| 16979 | Chemung | VILLAGE OF VAN ETTEN / Van Etten (V) | New system to serve area with private contaminated wells, consolidate public water supply, eliminate public water supply with past E. Coli detection. , New Complete System (New System) | 560 | $4,066,006 | 185 | $253,384,428 |
| 16259 | Chemung | WELLSBURG VILLAGE / Wellsburg (V) | New Water Treatment Plant, New Ground Water Source, New Inter-Connection | 650 | $1,287,000 | 150 | $254,671,428 |
| 17144 | Chemung | TOWN OF CHEMUNG WATER SYSTEM / Chemung (T) | New Complete System (New System) | 280 | $5,773,170 | 125 | $260,444,598 |
| 16576 | Chemung | WESTOVER HILLS MHC / Leading Edge Properties | water softener system and, Upgrade Distribution System | 400 | $105,218 | 60 | $260,549,815 |
| 16577 | Chemung | BELLAIR MOBILE HOME PARK / Leading Edge Properties | Upgrade Distribution System | 225 | $186,450 | 50 | $260,736,265 |
| 16560 | Chemung | ELMIRA WATER BOARD / Elmira Water Board | Upgrade Distribution System | 70,000 | $1,745,850 | 45 | $262,482,115 |
| 16260 | Chemung | MILLPORT VILLAGE WATER SUPPLY / Millport (V) | Upgrade Ground Water Source | 440 | $141,250 | 45 | $262,623,365 |
| 16723 | Chemung | WELLSBURG VILLAGE / Wellsburg (V) | Upgrade Distribution System | 650 | $728,511 | 35 | $263,351,876 |
| 16427 | Chemung | ROLLING ACRES MOBILE HOME PARK / Ashford Management Group, Inc. | Upgrade Distribution System | 270 | $157,070 | 35 | $263,508,946 |
| CHENANGO COUNTY | |||||||
| 16991 | Chenango | OXFORD WATER DISTRICT #1 / Oxford (T) | Surface Water Treatment Rule Compliance Facility, New Transmission | 50 | $411,182 | 150 | $263,920,128 |
| 16912 | Chenango | TOWN OF NO. NORWICH WD #1 / North Norwich (T) | New system to serve area with private contaminated wells, consolidate public water supply, eliminate public water supply with past total coliform detection. , New Distribution System | 100 | $920,300 | 130 | $264,840,428 |
| 15237 | Chenango | SHERBURNE VILLAGE / Sherburne (V) | New Ground Water Source, New Transmission, Upgrade Storage, Upgrade Distribution System | 1,531 | $2,000,000 | 120 | $266,840,428 |
| 16626 | Chenango | NORWICH CITY / Norwich (C) | Upgrade Water Treatment Plant, New Transmission | 8,000 | $776,667 | 110 | $267,617,095 |
| 16668 | Chenango | NORWICH CITY / Norwich (C) | To provide adequate pressure and eliminate asthetic contamination, Upgrade Distribution System | 8,000 | $3,348,165 | 90 | $270,965,260 |
| 16687 | Chenango | NORWICH TOWN WATER DISTRICT #2 / Norwich (T) | Extend Distribution System | 200 | $441,700 | 45 | $271,406,960 |
| 15944 | Chenango | OXFORD VILLAGE / Oxford (V) | New Ground Water Source, Upgrade Distribution System | 1,738 | $460,362 | 30 | $271,867,322 |
| CLINTON COUNTY | |||||||
| 15569 | Clinton | TOWN OF ELLENBURG / Ellenburg (T) | Extend Distribution System | 1,000 | $3,773,594 | 200 | $275,640,917 |
| 16502 | Clinton | ROUSES POINT VILLAGE / Rouses Point (V) | Filter Plant Replacement, Upgrade Water Treatment Plant, Upgrade Transmission, New Storage, Upgrade Distribution System | 2,500 | $8,731,289 | 120 | $284,372,205 |
| 16249 | Clinton | COBBLESTONE COVE / Pray's Beach & Motel | New Ground Water Source | 75 | $118,082 | 115 | $284,490,287 |
| 15337 | Clinton | MORRISONVILLE WATER DISTRICT / Schuyler Falls (T) | New Ground Water Source, New Distribution System | 1,300 | $3,587,392 | 115 | $288,077,679 |
| 17179 | Clinton | SOUTH PLATTSBURGH WATER DISTRICT / Plattsburgh (T) | New Pump Station, New Distribution System, New System Consolidation | 2,000 | $6,186,750 | 100 | $294,264,429 |
| 16498 | Clinton | TOWN OF CHAMPLAIN / Champlain (T) | Develop Source for Town Districts (4), New Ground Water Source, Upgrade Transmission, Upgrade Storage, Upgrade Distribution System | 1,350 | $2,131,740 | 90 | $296,396,169 |
| 16725 | Clinton | AUSABLE HEIGHTS WATER SYSTEM / Ausable (T) | New Ground Water Source, Upgrade Distribution System | 25 | $207,800 | 85 | $296,603,969 |
| 17148 | Clinton | ROUTR 9/SPELLMAN ROAD / Beekmantown (T) | New Distribution System, New System Consolidation | 500 | $1,795,570 | 80 | $298,399,539 |
| 16371 | Clinton | CHAMPLAIN VILLAGE / Champlain (V) | Distribution Loops, Upgrade Distribution System | 1,300 | $600,793 | 65 | $299,000,332 |
| 16373 | Clinton | CHAMPLAIN VILLAGE / Champlain (V) | Main replacement, Upgrade Distribution System | 1,300 | $225,305 | 65 | $299,225,637 |
| 15660 | Clinton | TOWN OF MOOERS PROPOSED WD#1 / Mooers (T) | Extend Distribution System | 1,250 | $7,019,843 | 60 | $306,245,479 |
| 16374 | Clinton | CHAMPLAIN VILLAGE / Champlain (V) | Upgrade Storage | 1,300 | $375,488 | 40 | $306,620,967 |
| 16372 | Clinton | CHAMPLAIN VILLAGE / Champlain (V) | Computerization of metering and billing, Other Expenses, Other (OT) | 1,300 | $39,437 | 30 | $306,660,404 |
| 16227 | Clinton | MORRISONVILLE W D N0 1 & 2 / Schuyler Falls (T) | Upgrade Pump Station | 1,825 | $160,460 | 25 | $306,820,864 |
| 16230 | Clinton | MORRISONVILLE W D N0 1 & 2 / Schuyler Falls (T) | New Storage | 1,825 | $638,450 | 25 | $307,459,314 |
| 16494 | Clinton | TOWN OF CHAMPLAIN / Champlain (T) | System Acquisition-"Benefit Area #1", New Ground Water Source, New Distribution System | 50 | $561,836 | 25 | $308,021,150 |
| 15401 | Clinton | PERU WD / Peru (T) | Upgrade Surface Water Source, New Transmission | 2,500 | $700,600 | 15 | $308,721,750 |
| COLUMBIA COUNTY | |||||||
| 15773 | Columbia | STOCKPORT WD #2 (CONSOLIDATED) / Stockport (T) | New Surface Water Treatment Rule Compliance Facility, New Transmission, New Storage | 3,100 | $5,894,979 | 210 | $314,616,729 |
| 16251 | Columbia | HUDSON CITY / Hudson (C) | New Surface Water Treatment Rule Compliance Facility, New Storage | 7,986 | $8,800,000 | 205 | $323,416,729 |
| 17175 | Columbia | TOWN OF CLAVERACK WD #1 / Claverack (T) | New system to serve users previously on (C) Hudson raw water main, New Surface Water Treatment Rule Compliance Facility, New Complete System (New System), New Inter-Connection, New System Consolidation | 1,200 | $6,563,266 | 185 | $329,979,995 |
| 16394 | Columbia | MAPLE LANE ASSOCIATES / Maple Lane Associates | New Ground Water Source, New Transmission, New Distribution System | 147 | $263,623 | 165 | $330,243,619 |
| 16495 | Columbia | PHILMONT VILLAGE / Philmont (V) | Upgrade Ground Water Source, Upgrade Distribution System | 1,702 | $436,022 | 140 | $330,679,640 |
| 15532 | Columbia | CHATHAM VILLAGE / Chatham (V) | Upgrade Ground Water Source, Upgrade Storage | 3,250 | $819,024 | 90 | $331,498,664 |
| 16444 | Columbia | DARROW SCHOOL / The Darrow School | New Ground Water Source, New Storage | 150 | $192,044 | 85 | $331,690,708 |
| 15765 | Columbia | GREENPORT WD NO1 / Greenport (T) | Charles St., Janis St., Greenport Pkwy., and Rte. 9, Upgrade Distribution System | 4,050 | $736,167 | 50 | $332,426,875 |
| 15769 | Columbia | GREENPORT WD NO1 / Greenport (T) | Upgrade Pump Station | 4,050 | $720,164 | 45 | $333,147,038 |
| 16920 | Columbia | HAMLET OF EAST CHATHAM / Chatham (T) | New Complete System (New System) | 65 | $1,141,012 | 45 | $334,288,050 |
| 16489 | Columbia | H H D CORP NORTH SHORE / HHD Development Corporation | Upgrade Distribution System | 25 | $254,250 | 40 | $334,542,300 |
| 15535 | Columbia | CHATHAM VILLAGE / Chatham (V) | Upgrade Ground Water Source, Upgrade Distribution System | 3,250 | $1,401,200 | 40 | $335,943,500 |
| 15761 | Columbia | GREENPORT WD NO1 / Greenport (T) | Control System Improvements, Upgrade Distribution System | 4,050 | $400,091 | 40 | $336,343,591 |
| 15757 | Columbia | GREENPORT WD NO1 / Greenport (T) | Upgrade Storage | 4,050 | $90,901 | 35 | $336,434,492 |
| 15775 | Columbia | STOCKPORT WD #2 (CONSOLIDATED) / Stockport (T) | Upgrade Distribution System | 3,100 | $1,017,523 | 30 | $337,452,015 |
| 15117 | Columbia | HUNT HOMESTEAD / Hunt's Homestead MHP | Upgrade Storage | 51 | $46,556 | 15 | $337,498,571 |
| CORTLAND COUNTY | |||||||
| 15586 | Cortland | MARATHON VILLAGE / Marathon (V) | New Ground Water Source, Upgrade Storage, Upgrade Distribution System | 1,107 | $678,000 | 135 | $338,176,571 |
| 15294 | Cortland | HOMER VILLAGE-NEWTON WATER WORKS / Homer (V) | New Transmission, New Pump Station | 4,368 | $367,250 | 95 | $338,543,821 |
| 15287 | Cortland | TOWN OF VIRGIL / Virgil (T) | Upgrade Ground Water Source, New Storage, Extend Distribution System, System Consolidation | 345 | $2,512,254 | 50 | $341,056,076 |
| 17190 | Cortland | CINCINNATUS WATER DISTRICT / Cincinnatus (T) | Upgrade Ground Water Source, Upgrade Transmission | 650 | $142,945 | 45 | $341,199,021 |
| 15297 | Cortland | HOMER VILLAGE-NEWTON WATER WORKS / Homer (V) | Upgrade Distribution System | 4,368 | $497,200 | 45 | $341,696,221 |
| 15302 | Cortland | CORTLAND WATER BOARD / Cortland (C) | New Transmission, New Storage | 20,094 | $2,928,960 | 35 | $344,625,181 |
| 15298 | Cortland | HOMER VILLAGE-NEWTON WATER WORKS / Homer (V) | New Transmission, New Storage | 4,368 | $597,488 | 20 | $345,222,668 |
| DELAWARE COUNTY | |||||||
| 16797 | Delaware | STAMFORD VILLAGE / Stamford (V) | Phase 2 of Project 15027, New Water Treatment Plant | 1,240 | $36,715 | 2155 | $345,259,383 |
| 15024 | Delaware | HALCOTTSVILLE WATER DISTRICT NO. 1 / Middletown(T) | New Ground Water Source, Upgrade Transmission, Upgrade Storage | 43 | $359,000 | 205 | $345,618,383 |
| 16606 | Delaware | DELHI VILLAGE / Delhi (V) | New Ground Water Source, Upgrade Distribution System | 3,833 | $1,283,115 | 185 | $346,901,498 |
| 17046 | Delaware | ANDES VILLAGE / Andes (V) | Extend Distribution System, New System Consolidation | 300 | $206,056 | 170 | $347,107,554 |
| 16587 | Delaware | DAVENPORT WATER CO / Davenport Water Co. | New Ground Water Source, Upgrade Storage, Upgrade Distribution System | 104 | $132,731 | 165 | $347,240,285 |
| 16744 | Delaware | FLEISCHMANNS VILLAGE / Fleischmanns (V) | New Ground Water Source, New Storage, Upgrade Distribution System | 625 | $1,050,000 | 105 | $348,290,285 |
| 15996 | Delaware | FRANKLIN VILLAGE / Franklin (V) | New Ground Water Source, New Storage, Upgrade Distribution System | 480 | $1,253,582 | 105 | $349,543,867 |
| 16653 | Delaware | WALTON VILLAGE / Walton (V) | New Other Expenses, Upgrade Storage, Upgrade Distribution System, Extend Distribution System, New Other (OT) | 3,231 | $2,183,959 | 100 | $351,727,826 |
| 15006 | Delaware | HOBART VILLAGE / Hobart (V) | New Water Treatment Plant, New Ground Water Source, New Transmission | 380 | $857,000 | 90 | $352,584,826 |
| 15843 | Delaware | MARGARETVILLE VILLAGE / Margaretville (V) | Upgrade Storage, Upgrade Distribution System | 660 | $833,827 | 75 | $353,418,653 |
| 15619 | Delaware | ROXBURY WATER DISTRICT / Roxbury (T) | Upgrade Storage, Upgrade Distribution System | 750 | $464,430 | 65 | $353,883,083 |
| 15316 | Delaware | ARKVILLE WATER DISTRICT / Middletown (T) | Upgrade Ground Water Source | 250 | $558,672 | 40 | $354,441,755 |
| 15836 | Delaware | MARGARETVILLE VILLAGE / Margaretville (V) | Upgrade Distribution System | 660 | $1,142,430 | 35 | $355,584,185 |
| DUTCHESS COUNTY | |||||||
| 16947 | Dutchess | GREENBUSH AREA WATER DISTRICT / Hyde Park (T) | Consolidation of systems, extension to serve private contiminated wells., New Distribution System | 700 | $2,771,050 | 1120 | $358,355,236 |
| NOTE: Short-Term Loan Closed | |||||||
| 15292 | Dutchess | WAPPINGER PARK HOMES / Wappinger (T) | Central Wappinger Water Improvement Area, Ardmore Hills Water Impr. Area, N. Wappinger Water Impr. Area, Cranberry Hills Water Impr. Area, & Meadowood and Cedar Ridge Subdiv., New Storage, System Consolidation | 400 | $16,584,558 | 155 | $374,939,794 |
| 16876 | Dutchess | BRETTVIEW ACRES WATER CO / Brettview Water Co. Inc. | New Surface Water Treatment Rule Compliance Facility | 920 | $46,104 | 115 | $374,985,898 |
| 16741 | Dutchess | PAWLING VILLAGE / Pawling (V) | New Ground Water Source | 2,181 | $1,286,844 | 105 | $376,272,742 |
| 15301 | Dutchess | TIVOLI VILLAGE / Tivoli (V) | Construct 2 supply wells, treatment, storage, interconnect Village with (T) Redhook & Rokeby Estates, New Ground Water Source, New Storage, New Inter-Connection | 1,303 | $3,523,790 | 100 | $379,796,532 |
| 17021 | Dutchess | ROKEBY HOMES,INC. / Dutchess Co Water & Waste Aut | Upgrade Ground Water Source, Upgrade Distribution System, New System Consolidation | 160 | $388,400 | 100 | $380,184,932 |
| 16534 | Dutchess | WAPPINGER PARK HOMES / Wappinger (T) | Consolidation of Wappinger Park, Tall Trees, and Oakwood Water Districts, New Transmission, New Inter-Connection | 400 | $8,643,556 | 95 | $388,828,488 |
| 16766 | Dutchess | ARBORS CONDOMINIUMS / Hyde Park (T) | Extend system to consolidate public water supply, eliminate public water supply with past totalColi detection. , New System Consolidation | 450 | $243,515 | 90 | $389,072,003 |
| 17071 | Dutchess | BIRCH HILL MANOR / Birch Hill Water Supply Corp. | Upgrade Water Treatment Plant, New Ground Water Source | 180 | $452,000 | 85 | $389,524,003 |
| 16111 | Dutchess | BARD COLLEGE / Bard College | Upgrade Water Treatment Plant, New Storage | 1,400 | $1,601,775 | 85 | $391,125,778 |
| 15288 | Dutchess | WAPPINGERS FALLS VILLAGE / Wappingers Falls (V) | Upgrade Ground Water Source | 6,000 | $282,500 | 80 | $391,408,278 |
| 16737 | Dutchess | DOVER RIDGE ESTATES / Beekman (T) | Upgrade Ground Water Source | 250 | $301,145 | 65 | $391,709,423 |
| 16235 | Dutchess | RED HOOK VILLAGE / Red Hook (V) | New Ground Water Source | 2,214 | $489,290 | 55 | $392,198,713 |
| 15740 | Dutchess | AMENIA WATER DISTRICT NO 1 / Amenia (T) | New Storage, Upgrade Distribution System | 1,000 | $1,672,400 | 50 | $393,871,113 |
| 16461 | Dutchess | STONEY CREEK FARMS (TOWN HOMES / Stoney Creek Farms Homeowners | New Water Treatment Plant | 28 | $20,340 | 50 | $393,891,453 |
| 16618 | Dutchess | SHOREHAVEN CIVIC ASSOC / Shore Haven Civic Assoc. | Upgrade Water Treatment Plant | 300 | $33,900 | 45 | $393,925,353 |
| 16583 | Dutchess | LAKE LODGES APARTMENTS / Lake Lodge Apts. | New Ground Water Source, Upgrade Pump Station, Upgrade Distribution System | 30 | $96,050 | 45 | $394,021,403 |
| 15295 | Dutchess | BEEKMAN (T) / Beekman (T) | New Complete System (New System), New Distribution System | 80 | $654,810 | 45 | $394,676,213 |
| 16803 | Dutchess | LAGRANGE/MANCHESTER / LaGrange (T) | New Water District | 2,500 | $8,828,690 | 40 | $403,504,903 |
| 16246 | Dutchess | LITTLE SWITZERLAND / East Fishkill (T) | Upgrade Distribution System, System Consolidation | 600 | $484,657 | 35 | $403,989,560 |
| 15938 | Dutchess | TACONIC ESTATES WATER DISTRICT / East Fishkill (T) | New Ground Water Source, System Consolidation | 185 | $167,240 | 35 | $404,156,800 |
| 15645 | Dutchess | POUGHKEEPSIE TOWNWIDE WD / Poughkeepsie (T) | System Consolidation | 27,000 | $7,514,500 | 35 | $411,671,300 |
| 16297 | Dutchess | WINGDALE VILLAGE PARK / Wingdale Village Park | Upgrade Water Treatment Plant, New Ground Water Source | 150 | $83,620 | 30 | $411,754,920 |
| 16384 | Dutchess | TOWN OF NORTHEAST WD / Northeast (T) | Upgrade Distribution System, New Water District | 411 | $113,000 | 25 | $411,867,920 |
| 16845 | Dutchess | VICTORY LAKE NURSING HOME / Victory Lake Nursing Center | Upgrade Storage, Upgrade Distribution System | 270 | $414,814 | 20 | $412,282,734 |
| 16514 | Dutchess | DUTCHESS CO WATER AUTH - VALLEYDALE / Dutchess Co Water & Waste Aut | New Ground Water Source, Upgrade Distribution System | 500 | $346,192 | 15 | $412,628,927 |
| 15595 | Dutchess | RED HOOK VILLAGE / Red Hook (V) | Upgrade Ground Water Source | 2,214 | $160,460 | 15 | $412,789,387 |
| 16236 | Dutchess | RED HOOK VILLAGE / Red Hook (V) | New Storage | 2,214 | $814,730 | 15 | $413,604,117 |
| 15879 | Dutchess | GREENFIELD WATER DISTRICT / Hyde Park (T) | New Water Treatment Plant, New Storage | 1,050 | $858,260 | 15 | $414,462,377 |
| 15930 | Dutchess | RHINEBECK VILLAGE WATER / Rhinebeck (V) | Remediate backwash "Sludge Pond", Upgrade Water Treatment Plant | 4,300 | $251,990 | 10 | $414,714,367 |
| 15644 | Dutchess | POUGHKEEPSIE TOWNWIDE WD / Poughkeepsie (T) | Upgrade Distribution System | 27,000 | $463,300 | 10 | $415,177,667 |
| 15927 | Dutchess | RHINEBECK VILLAGE WATER / Rhinebeck (V) | Upgrade Distribution System | 4,300 | $1,772,970 | 10 | $416,950,637 |
| 15662 | Dutchess | PINE PLAINS WATER IMPROVEMENT / Pine Plains (T) | Upgrade Distribution System | 860 | $1,827,531 | 10 | $418,778,168 |
| 16540 | Dutchess | CHARLOTTE GROVE MOBILE HOME CT / Charlette Grove Mobil Home Cou | Upgrade Distribution System | 112 | $342,187 | 10 | $419,120,354 |
| ERIE COUNTY | |||||||
| 16890 | Erie | EVANS, TOWN WATER DEPARTMENT / Evans (T) | Remediate inadequate pressures, New Storage, Upgrade Distribution System | 14,329 | $847,500 | 1050 | $419,967,854 |
| NOTE: Short-Term Loan Closed | |||||||
| 17081 | Erie | ERIE COUNTY WATER AUTHORITY / Erie County Water Authority | Consolidation of the (C) Tonawanda's system into ECWA., New System Consolidation | 402,180 | $10,701,100 | 135 | $430,668,954 |
| 17169 | Erie | ERIE COUNTY WATER AUTHORITY / Erie County Water Authority | Consolidation of the (C) Buffalo's system into ECWA,, New System Consolidation | 402,180 | $172,325,000 | 125 | $602,993,954 |
| 16888 | Erie | AURORA WATER DISTRICT 18 / Aurora (T) | Extend system to serve area with private contaminated wells, consolidate public water supply, eliminate public water supply with past totalColiform detection. , Extend Distribution System | 1,000 | $2,949,300 | 120 | $605,943,254 |
| 15680 | Erie | TOWN OF COLDEN WATER DISTRICT #1 / Colden (T) | Extend to serve private contaminated wells, consolidate public water supplies, eliminate public water supply with past coliform detections., Extend Distribution System | 450 | $2,391,100 | 120 | $608,334,354 |
| 17151 | Erie | AURORA WATER DISTRICT 18 / Aurora (T) | Extend system to serve area with private contaminated wells, consolidate public water supply, eliminate public water supply with past total coliform detection. WD 18, Section B., Extend Distribution System | 1,288 | $7,739,935 | 115 | $616,074,289 |
| 15922 | Erie | ALDEN VILLAGE / Alden (V) | Upgrade Ground Water Source | 2,666 | $723,203 | 110 | $616,797,492 |
| 17180 | Erie | BUFFALO WATER AUTHORITY / Buffalo City Water Board | Upgrade Water Treatment Plant | 345,974 | $8,147,300 | 100 | $624,944,792 |
| 15602 | Erie | EVANS WD #5 / Evans (T) | Extend system to serve area with private contaminated wells, remediate existing pressure problems. , Extend Distribution System | 3,136 | $1,110,790 | 100 | $626,055,582 |
| 17090 | Erie | SPRINGVILLE VILLAGE / Springville (V) | Upgrade Water Treatment Plant, New Storage, Upgrade Distribution System | 4,310 | $5,163,060 | 95 | $631,218,643 |
| 16087 | Erie | TOWN OF NEWSTEAD / Newstead (T) | New Storage, Extend Distribution System, System Consolidation | 5,000 | $7,096,400 | 95 | $638,315,043 |
| 16914 | Erie | TOWN OF NEWSTEAD WD#5 / Newstead (T) | Extension to serve area with private contaminated wells, consolidate public water supply. , Extend Distribution System | 438 | $3,147,757 | 90 | $641,462,800 |
| 15736 | Erie | COLLINS WD #3 / Collins (T) | Upgrade Transmission, New Storage, Upgrade Distribution System | 760 | $706,250 | 80 | $642,169,050 |
| 17079 | Erie | ERIE COUNTY WATER AUTHORITY / Erie County Water Authority | Lancaster Pump Station., New Pump Station | 402,180 | $2,313,506 | 80 | $644,482,555 |
| 15982 | Erie | TOWN OF EDEN PROPOSED WATER DISTRICT / Eden (T) | Extend Distribution System | 300 | $819,250 | 70 | $645,301,805 |
| 15981 | Erie | AKRON VILLAGE / Akron (V) | Upgrade Water Treatment Plant | 2,971 | $2,689,400 | 65 | $647,991,205 |
| 17080 | Erie | ERIE COUNTY WATER AUTHORITY / Erie County Water Authority | Harris Hill Pump Station and Transmission Main., New Transmission, New Pump Station | 402,180 | $5,109,860 | 60 | $653,101,065 |
| 15880 | Erie | EVANS, TOWN WATER DEPARTMENT / Evans (T) | Angola Service Area of the NYS Thruway Authority., Extend Distribution System | 14,329 | $254,250 | 55 | $653,355,315 |
| 16851 | Erie | TOWN OF AURORA WATER IMP. AREA NO. 5 / Aurora (T) | Extend Distribution System | 210 | $693,255 | 55 | $654,048,570 |
| 16557 | Erie | TOWN OF NEWSTEAD WD#7 / Newstead (T) | Fletcher Road, Extend Distribution System | 30 | $143,849 | 55 | $654,192,419 |
| 15508 | Erie | TOWN OF MARILLA WATER DISTRICT #3 / Marilla (T) | Extend Distribution System | 1,530 | $2,735,165 | 50 | $656,927,584 |
| 15497 | Erie | TOWN OF MARILLA WATER DISTRICT NO. 4 / Marilla (T) | Extend Distribution System | 760 | $2,542,325 | 50 | $659,469,909 |
| 15738 | Erie | COLLINS WD'S #1 AND #2 / Collins (T) | New Transmission, New Storage, Upgrade Distribution System | 1,300 | $640,145 | 45 | $660,110,054 |
| 15439 | Erie | ANGOLA VILLAGE / Angola (V) | New Storage, Upgrade Distribution System | 3,200 | $4,621,700 | 45 | $664,731,754 |
| 15339 | Erie | EAST HILL WATER DISTRICT NO. 3 / Boston (T) | New Storage, New Pump Station, Extend Distribution System | 800 | $2,779,800 | 40 | $667,511,554 |
| 16413 | Erie | EAST HILL WATER DISTRICT #3 / Boston (T) | New Distribution System | 600 | $2,265,650 | 40 | $669,777,204 |
| 15004 | Erie | BOSTON WD #2 / Boston (T) | New Storage, New Pump Station, Extend Distribution System | 25 | $1,389,900 | 40 | $671,167,104 |
| 15606 | Erie | EVANS WD #3 / Evans (T) | Extend Distribution System | 704 | $350,300 | 35 | $671,517,404 |
| 15961 | Erie | ELMA WATER DISTRICT NO. 1 / Elma (T) | Upgrade Distribution System | 10,287 | $164,189 | 30 | $671,681,593 |
| 15133 | Erie | HOLLAND WATER DISTRICT / Holland (T) | Upgrade Water Treatment Plant, New Ground Water Source | 1,680 | $226,000 | 30 | $671,907,593 |
| 15534 | Erie | COLLINS WD #4 / Collins (T) | New Pump Station | 73 | $265,550 | 30 | $672,173,143 |
| 15898 | Erie | GOWANDA VILLAGE / Gowanda (V) | New Transmission | 2,800 | $1,000,333 | 30 | $673,173,476 |
| 16556 | Erie | WILLIAMSVILLE (V) / Williamsville (V) | Mill Street, Upgrade Distribution System | 6,017 | $159,330 | 30 | $673,332,806 |
| 16016 | Erie | DEPEW VILLAGE / Depew (V) | Extend Distribution System | 7,500 | $127,125 | 25 | $673,459,931 |
| 16501 | Erie | BLASDELL VILLAGE / Blasdell (V) | Phase 1, see project #16624 for phase 2., Upgrade Distribution System | 3,288 | $972,365 | 25 | $674,432,296 |
| 16624 | Erie | BLASDELL VILLAGE / Blasdell (V) | Phase 2, see project #16501 for phase 1., Upgrade Distribution System | 3,288 | $736,308 | 25 | $675,168,604 |
| 16167 | Erie | GRAND ISLAND WD #1 / Grand Island (T) | Upgrade Water Treatment Plant | 205 | $1,649,093 | 20 | $676,817,696 |
| 15477 | Erie | ERIE COUNTY WATER AUTHORITY / ECWA/ Amherst (T) | Town of Amherst WD 15C - Country Parkway., Upgrade Distribution System | 402,180 | $310,750 | 20 | $677,128,446 |
| 15479 | Erie | ERIE COUNTY WATER AUTHORITY / ECWA/ Amherst (T) | Town of Amherst-Sheridan Dr. to Klein Rd., Upgrade Distribution System | 402,180 | $621,500 | 20 | $677,749,946 |
| 15484 | Erie | ERIE COUNTY WATER AUTHORITY / ECWA/ Amherst (T) | Town of Amherst WD 15C - Niagara Falls Blvd., Upgrade Distribution System | 402,180 | $339,000 | 20 | $678,088,946 |
| 15486 | Erie | ERIE COUNTY WATER AUTHORITY / ECWA/ Amherst (T) | Town of Amherst WD 15C - Casey Rd., Upgrade Distribution System | 402,180 | $282,500 | 20 | $678,371,446 |
| 16042 | Erie | EAST AURORA VILLAGE / East Aurora (V) | Upgrade Distribution System | 7,200 | $1,929,984 | 20 | $680,301,430 |
| 16578 | Erie | SPRINGVILLE MOBILE VILLAGE / Parss Properties | New Ground Water Source | 90 | $54,918 | 20 | $680,356,348 |
| 16758 | Erie | WEST SENECA WD NO3 / West Seneca (T) | Orchard Park Road Watermain, Upgrade Distribution System | 25 | $519,800 | 20 | $680,876,148 |
| 16815 | Erie | LANCASTER VILLAGE / Lancaster (V) | Upgrade Distribution System | 13,056 | $1,887,613 | 20 | $682,763,761 |
| 15444 | Erie | WILLIAMSVILLE (V) / Williamsville (V) | Northeast quadrant transmission system improvements., Upgrade Distribution System | 6,017 | $913,487 | 15 | $683,677,248 |
| 15469 | Erie | WILLIAMSVILLE (V) / Williamsville (V) | Los Robles Street water reconstruction project., Upgrade Distribution System | 6,017 | $461,545 | 15 | $684,138,793 |
| 16187 | Erie | GRAND ISLAND TOWN WATER DEPT. / Grand Island (T) | Upgrade Water Treatment Plant | 19,000 | $384,200 | 10 | $684,522,993 |
| 16396 | Erie | ORCHARD PARK VILLAGE / Orchard Park (V) | Upgrade Distribution System | 3,100 | $56,500 | 10 | $684,579,493 |
| 16740 | Erie | ORCHARD PARK WD#1 / Orchard Park (T) | 2000 water system improvements., Upgrade Distribution System | 612 | $8,001,530 | 10 | $692,581,023 |
| 16178 | Erie | GRAND ISLAND TOWN WATER DEPT. / Grand Island (T) | Ransom Road waterline improvements., Upgrade Distribution System | 19,000 | $125,942 | 5 | $692,706,965 |
| 16182 | Erie | GRAND ISLAND TOWN WATER DEPT. / Grand Island (T) | Bush Road waterline improvements., Upgrade Distribution System | 19,000 | $257,768 | 5 | $692,964,733 |
| 16185 | Erie | GRAND ISLAND TOWN WATER DEPT. / Grand Island (T) | Sandy Beach waterline improvements., Upgrade Distribution System | 19,000 | $1,114,354 | 5 | $694,079,087 |
| 15118 | Erie | CLARENCE, TOWN WATER DEPT. / Clarence (T) | Sheridan Drive watermain replacement., Upgrade Distribution System | 15,000 | $1,805,401 | 5 | $695,884,488 |
| 15119 | Erie | CLARENCE, TOWN WATER DEPT. / Clarence (T) | Main Street watermain replacement., Upgrade Distribution System | 15,000 | $2,994,500 | 5 | $698,878,988 |
| 15120 | Erie | CLARENCE, TOWN WATER DEPT. / Clarence (T) | Goodrich Road Watermain Extension., Extend Distribution System | 15,000 | $186,450 | 5 | $699,065,438 |
| 15121 | Erie | CLARENCE, TOWN WATER DEPT. / Clarence (T) | Harris Hill Road & Arondale Drive watermain replacements., Upgrade Distribution System | 15,000 | $820,606 | 5 | $699,886,044 |
| 15627 | Erie | HAMBURG WD #1 / Hamburg (T) | New Distribution System | 25 | $1,521,799 | 5 | $701,407,843 |
| ESSEX COUNTY | |||||||
| 17031 | Essex | CROWN POINT WD / Crown Point (T) | Phase 2 of DWSRF Project #15889, New Ground Water Source, New Storage, New Pump Station, Upgrade Distribution System | 995 | $1,582,000 | 2125 | $702,989,843 |
| 17023 | Essex | RAY BROOK WD / North Elba (T) | Phase 2 of DWSRF #15809. , New Ground Water Source, Upgrade Storage, Upgrade Distribution System | 400 | $499,404 | 2100 | $703,489,247 |
| 16044 | Essex | ELIZABETHTOWN WD / Elizabethtown (T) | New Ground Water Source, New Storage, Upgrade Distribution System | 800 | $6,158,500 | 265 | $709,647,747 |
| 15848 | Essex | MORIAH WD / Moriah (T) | New Surface Water Treatment Rule Compliance Facility, New Transmission, New Storage | 3,100 | $5,786,025 | 245 | $715,433,772 |
| 15873 | Essex | WESTPORT WD / Westport (T) | New Ground Water Source, Upgrade Distribution System | 800 | $6,460,838 | 240 | $721,894,610 |
| 15839 | Essex | LEWIS WD / Lewis (T) | New Ground Water Source, Upgrade Distribution System | 428 | $1,180,013 | 215 | $723,074,623 |
| 15844 | Essex | KEENE WD / Keene (T) | New Ground Water Source, New Transmission, New Storage, Upgrade Distribution System | 450 | $2,475,353 | 210 | $725,549,976 |
| 17053 | Essex | UPPER JAY WD / Jay (T) | New Surface Water Treatment Rule Compliance Facility, Upgrade Transmission, Upgrade Storage, Upgrade Distribution System | 234 | $2,624,135 | 190 | $728,174,111 |
| 17069 | Essex | WILLSBORO WD / Willsboro (T) | Extend to serve Willsboro Bay WD for SWTR compliance., Upgrade Distribution System, New System Consolidation | 1,571 | $3,265,821 | 190 | $731,439,932 |
| 17052 | Essex | WILMINGTON WD / Wilmington (T) | Upgrade Transmission, New Storage, Upgrade Distribution System | 980 | $6,547,290 | 185 | $737,987,222 |
| 17195 | Essex | KEENE VALLEY WD / Keene (T) | New Ground Water Source, New Storage, Upgrade Distribution System | 300 | $3,457,603 | 175 | $741,444,826 |
| 17164 | Essex | TICONDEROGA WD / Ticonderoga (T) | Extention of Town system to serve International Paper Mill, Shore Airport Road and the Claymore residential development., New Distribution System, New System Consolidation | 5,000 | $6,334,117 | 130 | $747,778,942 |
| 15919 | Essex | ESSEX WD / Essex (T) | Refinancing of DE filtration plant installation to comply with SWTR., New Water Treatment Plant | 300 | $169,115 | 125 | $747,948,057 |
| 15976 | Essex | WILLSBORO WD / Willsboro (T) | New Storage, Extend Distribution System, Upgrade Distribution System, New System Consolidation | 1,571 | $3,486,050 | 120 | $751,434,107 |
| 15881 | Essex | WADHAMS WD / Westport (T) | New Ground Water Source, Upgrade Distribution System | 140 | $217,067 | 105 | $751,651,174 |
| 15829 | Essex | MINERVA WD / Minerva (T) | New Ground Water Source, Upgrade Distribution System, New System Consolidation | 900 | $1,346,787 | 105 | $752,997,962 |
| 17163 | Essex | TICONDEROGA WD / Ticonderoga (T) | New Transmission, New Storage | 5,000 | $8,883,467 | 105 | $761,881,428 |
| 15876 | Essex | WESTPORT WD / Westport (T) | Upgrade Transmission, Upgrade Distribution System | 800 | $198,096 | 100 | $762,079,524 |
| 17049 | Essex | KEENE VALLEY WD / Keene (T) | New Ground Water Source, Upgrade Transmission, New Storage, Upgrade Distribution System | 300 | $2,190,578 | 90 | $764,270,102 |
| 15827 | Essex | MINERVA WD / Minerva (T) | New Storage, Upgrade Distribution System | 900 | $197,750 | 75 | $764,467,852 |
| 16589 | Essex | MORIAH WD / Moriah (T) | Upgrade Distribution System | 3,100 | $270,579 | 70 | $764,738,431 |
| 15797 | Essex | PORT HENRY V / Port Henry (V) | Upgrade Transmission, Upgrade Distribution System | 1,831 | $578,458 | 65 | $765,316,889 |
| 16659 | Essex | PORT HENRY V / Port Henry (V) | Upgrade Distribution System | 1,831 | $4,876,117 | 65 | $770,193,006 |
| 15846 | Essex | MORIAH WD / Moriah (T) | Upgrade Distribution System | 3,100 | $685,770 | 65 | $770,878,776 |
| 15849 | Essex | MORIAH WD / Moriah (T) | New Other Expenses, Upgrade Distribution System, New Other (OT) | 3,100 | $1,778,318 | 65 | $772,657,094 |
| 15841 | Essex | LEWIS WD / Lewis (T) | Upgrade Distribution System | 428 | $895,046 | 55 | $773,552,140 |
| 16045 | Essex | NEW RUSSIA WD / Elizabethtown (T) | Upgrade Water Treatment Plant, New Storage, Upgrade Distribution System | 60 | $152,550 | 45 | $773,704,690 |
| 16897 | Essex | CROWN POINT WD / Crown Point (T) | Upgrade Distribution System | 995 | $452,000 | 45 | $774,156,690 |
| 16378 | Essex | WILMINGTON WD / Willmington (T) | Upgrade Surface Water Source, Upgrade Transmission | 980 | $33,900 | 40 | $774,190,590 |
| 17193 | Essex | AUSABLE FORKS WD / Jay (T) | New Storage | 900 | $1,224,539 | 40 | $775,415,129 |
| 15806 | Essex | WINEBROOK HILLS WD / Newcomb (T) | Upgrade Storage | 100 | $368,666 | 20 | $775,783,795 |
| FRANKLIN COUNTY | |||||||
| 17085 | Franklin | MALONE V / Malone (V) | New Surface Water Treatment Rule Compliance Facility, New Storage | 13,000 | $4,655,600 | 230 | $780,439,395 |
| 16861 | Franklin | TUPPER LAKE V / Tupper Lake (V) | New Storage, Upgrade Distribution System | 6,000 | $633,104 | 110 | $781,072,499 |
| 15246 | Franklin | ST REGIS MOHAWK WATER SYSTEM / St. Regis Mohawk Tribe | Upgrade Water Treatment Plant, New Pump Station | 1,500 | $4,404,684 | 95 | $785,477,183 |
| 16866 | Franklin | TUPPER LAKE V / Tupper Lake (V) | Upgrade Water Treatment Plant, Upgrade Transmission | 6,000 | $596,295 | 95 | $786,073,478 |
| 16807 | Franklin | ALTAMONT (T) WD #17, LITTLE WOLF WD / Altamont (T) | New system to serve area with private contaminated wells, consolidate public water supply. , New Complete System (New System) | 250 | $540,000 | 90 | $786,613,478 |
| 16571 | Franklin | TOWN OF HARRIETSTOWN / Harrietstown (T) | Upgrade Distribution System | 5,621 | $803,204 | 60 | $787,416,682 |
| 16957 | Franklin | CHATEAUGAY V / Chateaugay (V) | Upgrade Distribution System | 1,100 | $2,147,000 | 55 | $789,563,682 |
| 15712 | Franklin | SARANAC LAKE V / Saranac Lake (V) | Upgrade Storage, Upgrade Pump Station | 5,800 | $658,112 | 45 | $790,221,794 |
| 16896 | Franklin | SARANAC LAKE V / Saranac Lake (V) | Upgrade Distribution System | 5,800 | $203,683 | 45 | $790,425,476 |
| 17184 | Franklin | BURKE V / Village of Burke | New Other Expenses, New Other (OT) | 273 | $282,500 | 30 | $790,707,976 |