Final Intended Use Plan for the NYS Drinking Water State Revolving Fund
Multi-Year List for October 1, 2003 to September 30, 2004
Albany - Franklin
| Project | County | System Name/ Borrower |
Description | Pop. | Project Cost |
Score | Cumulative Total |
|---|---|---|---|---|---|---|---|
| ALBANY COUNTY | |||||||
| 17047 | Albany | LATHAM WATER DISTRICT / Colonie (T) | Upgrade Water Treatment Plant | 78500 | $13,797,666.00 | 1,070 | $13,797,666.00) |
| NOTE: Short-Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 15661 | Albany | RENSSELAERVILLE WD / Rensselaerville (T) | New Ground Water Source, Upgrade Storage, Upgrade Distribution System | 114 | $990,242.00 | 185 | $14,787,908.00) |
| 15525 | Albany | WESTERLO COMMUNITY WATER DISTRICT / Westerlo (T) | New system to serve area with private contaminated wells, consolidate public water supply, eliminate public water supply with past E. Coli detection. , New Complete System (New System), System Consolidation | 280 | $1,700,000.00 | 185 | $16,487,908.00) |
| 17295 | Albany | VOORHEESVILLE VILLAGE / Voorheesville (V) | New Storage, Extend Distribution System, Upgrade Distribution System | 3700 | $2,250,000.00 | 100 | $18,737,908.00) |
| 15950 | Albany | GUILDERLAND TOWN WD / Guilderland (T) | Phase III Improvements, New Storage, Extend Distribution System, Upgrade Distribution System, New Inter-Connection | 30000 | $10,146,000.00 | 75 | $28,883,908.00) |
| 16670 | Albany | ALTAMONT RD. WATER DISTRICT / New Scotland (T) | Extension of Village of Voorheesville system into the Town of New Scotland, New Distribution System | 93 | $314,000.00 | 70 | $29,197,908.00) |
| 17299 | Albany | RAVENA VILLAGE / Ravena (V) | Upgrade Water Treatment Plant, Upgrade Transmission, Upgrade Storage | 4500 | $3,090,000.00 | 50 | $32,287,908.00) |
| 16245 | Albany | COHOES CITY / Cohoes (C) | Upgrade Distribution System | 16825 | $1,909,700.00 | 50 | $34,197,608.00) |
| 15705 | Albany | ALBANY CITY / Albany (C) | Pearl Street Reconstruction, Phase 1, Upgrade Distribution System | 101082 | $2,000,000.00 | 50 | $36,197,608.00) |
| 16449 | Albany | GREEN ISLAND VILLAGE / Green Island (V) | Extend Distribution System | 3800 | $381,100.00 | 50 | $36,578,708.00) |
| 15698 | Albany | ALBANY CITY / Albany (C) | 1997 Capital Improvement Program, Upgrade Distribution System | 101082 | $1,350,000.00 | 45 | $37,928,708.00) |
| 15747 | Albany | ALBANY CITY / Albany (C) | New Transmission | 101082 | $10,000,000.00 | 45 | $47,928,708.00) |
| 15417 | Albany | KRUMKILL RD. WATER DISTRICT / New Scotland (T) | Extend Distribution System | 45 | $31,000.00 | 45 | $47,959,708.00) |
| 15395 | Albany | WATERVLIET CITY / Watervliet (C) | New Storage | 11300 | $1,548,000.00 | 40 | $49,507,708.00) |
| 15720 | Albany | ALBANY CITY / Albany (C) | Upgrade Water Treatment Plant | 101082 | $960,000.00 | 40 | $50,467,708.00) |
| 16244 | Albany | COHOES CITY / Cohoes (C) | Upgrade Distribution System | 16825 | $916,543.00 | 40 | $51,384,251.00) |
| 15129 | Albany | NORTHEAST WATER DISTRICT / New Scotland (T) | New Complete System (New System) | 370 | $843,905.00 | 40 | $52,228,156.00) |
| 15300 | Albany | NORTHEAST WATER DISTRICT / New Scotland (T) | Extend Distribution System | 45 | $267,000.00 | 40 | $52,495,156.00) |
| 15446 | Albany | NORMANSKILL RD, WORMER RD WATER SYS. / New Scotland (T) | Extend Distribution System | 30 | $376,000.00 | 40 | $52,871,156.00) |
| 15397 | Albany | WATERVLIET CITY / Watervliet (C) | Upgrade Transmission | 11300 | $208,500.00 | 35 | $53,079,656.00) |
| 15743 | Albany | ALBANY CITY / Albany (C) | Upgrade Distribution System | 101082 | $6,000,000.00 | 35 | $59,079,656.00) |
| 15392 | Albany | WATERVLIET CITY / Watervliet (C) | Replace undersized lines - 1998, Upgrade Distribution System | 11300 | $795,000.00 | 30 | $59,874,656.00) |
| 15393 | Albany | WATERVLIET CITY / Watervliet (C) | Replace undersized water mains provided insufficient flow & pressure-1997, Upgrade Distribution System | 11300 | $317,700.00 | 30 | $60,192,356.00) |
| 17341 | Albany | SOUTH ALBANY WATER DISTRICT / Bethlehem (T) | New Transmission | 100 | $146,775.00 | 25 | $60,339,131.00) |
| 15755 | Albany | RAVENA VILLAGE / Ravena (V) | New Storage | 4500 | $497,500.00 | 20 | $60,836,631.00) |
| 15247 | Albany | LATHAM WATER DISTRICT / Colonie (T) | New Storage | 78500 | $1,290,000.00 | 15 | $62,126,631.00) |
| ALLEGANY COUNTY | |||||||
| 17056 | Allegany | ANDOVER VILLAGE PUBLIC WATER / Andover (V) | Upgrade Storage, Upgrade Distribution System | 1130 | $4,000.00 | 1,080 | $62,130,631.00) |
| NOTE: Short-Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 16746 | Allegany | CANASERAGA VILLAGE PUBLIC WATER / Canaseraga (V) | New Ground Water Source | 900 | $1,058,451.00 | 155 | $63,189,082.00) |
| 17188 | Allegany | BELFAST WATER DISTRICT / Belfast (T) | Upgrade Water Treatment Plant, New Ground Water Source | 750 | $1,250,000.00 | 95 | $64,439,082.00) |
| 15760 | Allegany | ANGELICA VILLAGE PUBLIC WATER / Angelica (V) | Upgrade Surface Water Source, Upgrade Transmission, Upgrade Storage, Upgrade Distribution System | 950 | $1,179,000.00 | 80 | $65,618,082.00) |
| 15925 | Allegany | TOWN OF WELLSVILLE / Wellsville (T) | Extend system to serve area with private contaminated wells, Morningside Area, Extend Distribution System | 5000 | $867,106.00 | 75 | $66,485,188.00) |
| 15502 | Allegany | WELLSVILLE VILLAGE PUBLIC WATER / Wellsville (V) | New Storage | 5700 | $1,177,000.00 | 50 | $67,662,188.00) |
| 15547 | Allegany | FRIENDSHIP TOWN WATER DISTRICT / Friendship (T) | Upgrade Ground Water Source, Upgrade Storage, Upgrade Distribution System | 1380 | $1,030,000.00 | 45 | $68,692,188.00) |
| 16636 | Allegany | BOLIVAR VILLAGE PUBLIC WATER / Bolivar (V) | New Storage, Upgrade Distribution System | 1040 | $788,500.00 | 45 | $69,480,688.00) |
| 15953 | Allegany | SCIO WATER DISTRICT / Scio (T) | New Ground Water Source, Upgrade Ground Water Source, Upgrade Distribution System | 1039 | $487,300.00 | 40 | $69,967,988.00) |
| 15005 | Allegany | BELFAST WATER DISTRICT / Belfast (T) | New Storage | 750 | $318,150.00 | 40 | $70,286,138.00) |
| 16655 | Allegany | GENESEE HEIGHTS MOBILE HOME PK / Mr. & Mrs. Anzivine | New Ground Water Source, Upgrade Distribution System | 65 | $69,000.00 | 40 | $70,355,138.00) |
| 15943 | Allegany | ANDOVER VILLAGE PUBLIC WATER / Andover (V) | Upgrade Surface Water Source | 1130 | $3,299,000.00 | 40 | $73,654,138.00) |
| 16747 | Allegany | CANASERAGA VILLAGE PUBLIC WATER / Canaseraga (V) | Upgrade Distribution System | 900 | $2,039,915.00 | 35 | $75,694,053.00) |
| 16154 | Allegany | BELMONT VILLAGE PUBLIC WATER / Belmont (V) | Trianna St. & Milton St., Upgrade Distribution System | 1325 | $494,452.00 | 30 | $76,188,505.00) |
| 16156 | Allegany | BELMONT VILLAGE PUBLIC WATER / Belmont (V) | Greenwich St. to Allegany County Office Complex., Upgrade Distribution System | 1325 | $405,827.00 | 30 | $76,594,332.00) |
| 15983 | Allegany | ALMOND VILLAGE PUBLIC WATER / Almond (V) | Upgrade Distribution System | 600 | $257,500.00 | 25 | $76,851,832.00) |
| BROOME COUNTY | |||||||
| 16160 | Broome | CHARLOTTE KENYON ELEMENTARY / Charlotte Kenyon School | New Water Treatment Plant, Upgrade Ground Water Source | 400 | $95,500.00 | 140 | $76,947,332.00) |
| 16262 | Broome | TOWN OF CONKLIN W.D. / Conklin (T) | Extend system to serve area with private contaminated wells, consolidate public water supply. , Inter-Connection, System Consolidation | 1000 | $863,140.00 | 90 | $77,810,472.00) |
| 15231 | Broome | CHENANGO FORKS JR./SR. HS / Chenango (T) | System Consolidation | 1300 | $113,500.00 | 70 | $77,923,972.00) |
| 16175 | Broome | CONKLIN WD #1 / Conklin (T) | Upgrade Ground Water Source | 101 | $343,200.00 | 65 | $78,267,172.00) |
| 16025 | Broome | PARK TERRACE WATER SYSTEM / Binghamton (T) | Extend system to serve area with private contaminated wells. , Extend Distribution System | 455 | $1,101,456.00 | 55 | $79,368,628.00) |
| 16804 | Broome | STILLWATER RD WD#6 / Conklin (T) | Extend Distribution System | 173 | $412,782.00 | 55 | $79,781,410.00) |
| 16541 | Broome | UNION TOWN WATER SYSTEM NO. 1 / Union (T) | Extend Distribution System | 21000 | $6,400,225.00 | 45 | $86,181,635.00) |
| 16801 | Broome | CHENANGO WD #8 / Chenango (T) | New Water District | 100 | $121,000.00 | 45 | $86,302,635.00) |
| 16802 | Broome | CHENANGO WD #4 / Chenango (T) | New Water District | 100 | $112,450.00 | 45 | $86,415,085.00) |
| 15969 | Broome | VESTAL CONSOLIDATED W.D. #1 / Vestal (T) | New Water Treatment Plant | 20950 | $863,720.00 | 40 | $87,278,805.00) |
| 16799 | Broome | CHENANGO WD #25 / Chenango (T) | New WD to serve private insufficient yielding wells area of Poplar Hill Road , New Complete System (New System) | 100 | $383,500.00 | 40 | $87,662,305.00) |
| 15215 | Broome | DICKINSON WD #2 / Dickinson (T) | Upgrade Pump Station, Upgrade Distribution System | 56 | $220,100.00 | 35 | $87,882,405.00) |
| 15489 | Broome | BINGHAMTON (C) / Binghamton (C) | South Side Water Storage Reservoir replacement,Hotchkins St., Upgrade Storage | 47600 | $1,236,000.00 | 35 | $89,118,405.00) |
| 15764 | Broome | WINDSOR VILLAGE / Windsor (V) | Upgrade Pump Station, Upgrade Distribution System | 1051 | $1,660,000.00 | 30 | $90,778,405.00) |
| 15973 | Broome | VESTAL CONSOLIDATED W.D. #1 / Vestal (T) | Upgrade Pump Station, Upgrade Distribution System | 20950 | $319,815.00 | 10 | $91,098,220.00) |
| 15975 | Broome | VESTAL CONSOLIDATED W.D. #1 / Vestal (T) | Upgrade Pump Station | 20950 | $187,718.00 | 10 | $91,285,938.00) |
| 15977 | Broome | VESTAL CONSOLIDATED W.D. #1 / Vestal (T) | New Storage | 20950 | $1,668,600.00 | 10 | $92,954,538.00) |
| 15905 | Broome | CHENANGO CONSOLIDATED WD #1 / Chenango (T) | Upgrade Ground Water Source | 6381 | $574,500.00 | 10 | $93,529,038.00) |
| 15971 | Broome | VESTAL CONSOLIDATED W.D. #1 / Vestal (T) | Upgrade Water Treatment Plant | 20950 | $415,296.00 | 5 | $93,944,334.00) |
| CATTARAUGUS COUNTY | |||||||
| 17051 | Cattaraugus | MACHIAS TOWN WATER DISTRICT / Machias (T) | Phase 2 of DWRSF #15485., Upgrade Water Treatment Plant, New Ground Water Source, Upgrade Storage, Upgrade Distribution System | 700 | $150,000.00 | 2,145 | $94,094,334.00) |
| 17040 | Cattaraugus | VERSAILLES WATER DISTRICT / Perrysburg (T) | New system to serve area with private contaminated wells, consolidate public water supply, eliminate public water supply with past E. Coli detection. , New Complete System (New System) | 145 | $524,700.00 | 175 | $94,619,034.00) |
| 17192 | Cattaraugus | CENTRAL WATER DISTRICT / Perrysburg (T) | Upgrade Water Treatment Plant, Upgrade Ground Water Source, New Transmission, Extend Distribution System | 400 | $988,500.00 | 135 | $95,607,534.00) |
| 16649 | Cattaraugus | SOUTH DAYTON VILLAGE / South Dayton (V) | New Water Treatment Plant, New Storage, Upgrade Distribution System | 661 | $300,000.00 | 105 | $95,907,534.00) |
| 17332 | Cattaraugus | PROSPECT STREET WATER DISTRICT / Perrysburg (T) | Extend Distribution System, Upgrade Distribution System, System Consolidation | 83 | $309,000.00 | 90 | $96,216,534.00) |
| 15000 | Cattaraugus | CATTARAUGUS VILLAGE / Cattaraugus (V) | Upgrade Water Treatment Plant, Upgrade Ground Water Source, New Storage, Upgrade Distribution System | 1100 | $332,100.00 | 70 | $96,548,634.00) |
| 15768 | Cattaraugus | HINSDALE WATER DISTRICT / Hinsdale (T) | Upgrade Storage, Upgrade Distribution System | 350 | $483,100.00 | 70 | $97,031,734.00) |
| 16061 | Cattaraugus | GROVE STREET WATER SUPPLY / Yorkshire (T) | Extend system to serve area with private contaminated wells. , Extend Distribution System | 70 | $57,100.00 | 65 | $97,088,834.00) |
| 15756 | Cattaraugus | LIMESTONE VILLAGE / Limestone (V) | New Ground Water Source, New Storage, Upgrade Distribution System | 459 | $1,200,000.00 | 55 | $98,288,834.00) |
| 15017 | Cattaraugus | SALAMANCA CITY / Salamanca (C) | Upgrade Ground Water Source | 7000 | $850,000.00 | 50 | $99,138,834.00) |
| 16247 | Cattaraugus | SALAMANCA CITY / Salamanca (C) | Upgrade Storage | 7000 | $1,510,000.00 | 50 | $100,648,834.00) |
| 15763 | Cattaraugus | PORTVILLE VILLAGE / Portville (V) | Upgrade Distribution System | 1136 | $437,673.00 | 35 | $101,086,507.00) |
| 15544 | Cattaraugus | PERRYSBURG (V) / Perrysburg (V) | New Transmission, Upgrade Distribution System | 404 | $330,000.00 | 30 | $101,416,507.00) |
| 16563 | Cattaraugus | EAST RANDOLPH VILLAGE / East Randolph (V) | Upgrade Transmission | 629 | $283,141.00 | 25 | $101,699,648.00) |
| CAYUGA COUNTY | |||||||
| 17054 | Cayuga | SPRINGPORT WATER DISTRICT NO. 2 / Springport (T) | Cayuga Lake Intercommunity Water Board - Towns of Springport and Fleming. Extend to serve private contaminated wells., New Storage, Extend Distribution System, New Inter-Connection | 1500 | $9,993,000.00 | 120 | $111,692,648.00) |
| 15780 | Cayuga | AURORA VILLAGE / Aurora (V) | New Water Treatment Plant, New Surface Water Source | 526 | $862,457.00 | 110 | $112,555,105.00) |
| 15970 | Cayuga | LOCKE W D / Locke (T) | Upgrade Ground Water Source, Upgrade Distribution System | 600 | $500,650.00 | 80 | $113,055,755.00) |
| 15127 | Cayuga | FAIR HAVEN VILLAGE / Fair Haven (V) | Upgrade Ground Water Source, New Storage, Upgrade Distribution System | 1000 | $934,500.00 | 80 | $113,990,255.00) |
| 16337 | Cayuga | MONTEZUMA W D #1 / Montezuma (T) | Upgrade Distribution System, New Distribution System | 490 | $3,801,215.00 | 80 | $117,791,470.00) |
| 15751 | Cayuga | GENOA-KING FERRY WD / Genoa (T) | Upgrade Water Treatment Plant, Upgrade Storage, Upgrade Distribution System | 800 | $1,040,000.00 | 75 | $118,831,470.00) |
| 16114 | Cayuga | CAYUGA VILLAGE / Cayuga (V) | Upgrade Water Treatment Plant, Upgrade Surface Water Source, Upgrade Distribution System | 600 | $770,000.00 | 70 | $119,601,470.00) |
| 16762 | Cayuga | UNION SPRINGS VILLAGE / Union Springs (V) | New Water Treatment Plant | 2000 | $165,000.00 | 65 | $119,766,470.00) |
| 16161 | Cayuga | PORT BYRON VILLAGE / Port Byron (V) | Upgrade Transmission | 1400 | $1,425,000.00 | 65 | $121,191,470.00) |
| 17091 | Cayuga | BRUTUS WATER DISTRICT NO. 2 / Brutus (T) | New Complete System (New System) | 1500 | $3,104,615.00 | 65 | $124,296,085.00) |
| 16163 | Cayuga | THROOP WD NO1 / Throop (T) | Extend Distribution System, Upgrade Distribution System | 400 | $1,960,142.00 | 60 | $126,256,227.00) |
| 17220 | Cayuga | TOWN OF VICTORY WD #2 / Victory (T) | Extend Distribution System | 612 | $3,389,601.00 | 55 | $129,645,828.00) |
| 17315 | Cayuga | TOWN OF MORAVIA WATER DISTRICT NO. 1 / Moravia (T) | New Pump Station, Extend Distribution System | 162 | $663,320.00 | 55 | $130,309,148.00) |
| 15018 | Cayuga | FLEMING WD / Fleming (T) | New Storage, Upgrade Distribution System, Inter-Connection | 1800 | $1,442,000.00 | 50 | $131,751,148.00) |
| 15026 | Cayuga | AUBURN / Auburn (C) | Upgrade Transmission, Upgrade Pump Station | 29788 | $321,875.00 | 50 | $132,073,023.00) |
| 15904 | Cayuga | AURELIUS WD NO 1 / Aurelius (T) | Extend Distribution System | 440 | $2,142,690.00 | 50 | $134,215,713.00) |
| 17223 | Cayuga | WEST GENESEE STREET WATER DISTRICT / Aurelius (T) | Extend Distribution System | 175 | $1,198,000.00 | 50 | $135,413,713.00) |
| 15050 | Cayuga | AUBURN / Auburn (C) | Upgrade Surface Water Source | 29788 | $647,510.00 | 45 | $136,061,223.00) |
| 16759 | Cayuga | CAYUGA COUNTY WATER & SEWER AUTHORITY / Cayuga Co. Water & Sewer Auth. | New Water Treatment Plant, New Storage, New Distribution System | 5900 | $25,632,730.00 | 45 | $161,693,953.00) |
| 15043 | Cayuga | AUBURN / Auburn (C) | Reservoir relining and leak repair., Upgrade Storage | 29788 | $902,795.00 | 45 | $162,596,748.00) |
| 15546 | Cayuga | AUBURN / Auburn (C) | Upgrade Distribution System | 29788 | $1,098,495.00 | 40 | $163,695,243.00) |
| 17329 | Cayuga | OWASCO WATER DISTRICT / Owasco (T) | Upgrade Water Treatment Plant, New Storage, Upgrade Distribution System | 3000 | $6,180,000.00 | 30 | $169,875,243.00) |
| 15949 | Cayuga | MORAVIA VILLAGE / Moravia (V) | Upgrade Distribution System | 1600 | $789,600.00 | 30 | $170,664,843.00) |
| 15634 | Cayuga | SENNETT WD #1 / Sennett (T) | Upgrade Distribution System | 200 | $470,339.00 | 25 | $171,135,182.00) |
| 15631 | Cayuga | SENNETT WD #3 / Sennett (T) | Upgrade Distribution System | 400 | $307,760.00 | 20 | $171,442,942.00) |
| CHAUTAUQUA COUNTY | |||||||
| 16775 | Chautauqua | TOWN OF PORTLAND WATER DISTRICT NO. 5 / Portland (T) | Extend to serve private contaminated wells, consolidate public water supplies, eliminate public water supply with past turbidity violations., Extend Distribution System | 400 | $227,100.00 | 155 | $171,670,042.00) |
| 15787 | Chautauqua | CLYMER WATER DISTRICT / Clymer (T) | New Ground Water Source | 650 | $200,000.00 | 95 | $171,870,042.00) |
| 16613 | Chautauqua | MAYVILLE VILLAGE / Mayville (V) | Upgrade Ground Water Source, Upgrade Transmission, Upgrade Storage, Upgrade Distribution System | 1630 | $977,780.00 | 90 | $172,847,822.00) |
| 17279 | Chautauqua | SHOREHAVEN WATER DISTRICT / Westfield (T) | Extend Distribution System, System Consolidation | 120 | $206,000.00 | 90 | $173,053,822.00) |
| 17059 | Chautauqua | TOWN OF SHERIDAN ROUTE 5 WATERLINE / Sheridan (T) | Extend to serve private contaminated wells, consolidate public water supplies., Extend Distribution System | 280 | $1,600,000.00 | 85 | $174,653,822.00) |
| 15236 | Chautauqua | SHERMAN VILLAGE / Sherman (V) | Address total Coli violations., Upgrade Distribution System | 917 | $795,000.00 | 80 | $175,448,822.00) |
| 17217 | Chautauqua | TOWN OF PORTLAND WATER DISTRICT NO. 5 / Portland (T) | Water District No. 5, Phase II - West Side, extend to serve private contaminated wells,, Extend Distribution System | 183 | $1,565,600.00 | 75 | $177,014,422.00) |
| 16012 | Chautauqua | WESTFIELD (V) / Westfield (V) | East Main St., Upgrade Distribution System | 3450 | $597,423.00 | 70 | $177,611,845.00) |
| 15617 | Chautauqua | HANOVER WD NO1 / Hanover (T) | Extension #4., Extend Distribution System | 3000 | $666,300.00 | 70 | $178,278,145.00) |
| 17218 | Chautauqua | FREDONIA VILLAGE / Fredonia (V) | Upgrade Water Treatment Plant | 10400 | $1,287,500.00 | 65 | $179,565,645.00) |
| 16406 | Chautauqua | FORESTVILLE VILLAGE / Forestville (V) | Upgrade Distribution System | 804 | $200,000.00 | 60 | $179,765,645.00) |
| 15021 | Chautauqua | DUNKIRK CITY / Dunkirk (C) | Extension to (T) of Sheridan and (V) of Silver Creek., New Transmission, System Consolidation | 15310 | $3,530,000.00 | 60 | $183,295,645.00) |
| 15124 | Chautauqua | DUNKIRK CITY / Dunkirk (C) | Extension to (T) of Portland and (V) of Brocton., New Transmission, New Pump Station, System Consolidation | 15310 | $2,915,000.00 | 60 | $186,210,645.00) |
| 16014 | Chautauqua | WESTFIELD (V) / Westfield (T) | New Distribution System | 3450 | $520,300.00 | 60 | $186,730,945.00) |
| 16818 | Chautauqua | HANOVER WD NO1 / Hanover (T) | New Storage, Upgrade Distribution System | 3000 | $6,000,000.00 | 55 | $192,730,945.00) |
| 15189 | Chautauqua | BROCTON VILLAGE / Brocton (V) | Upgrade Water Treatment Plant | 4000 | $2,850,000.00 | 55 | $195,580,945.00) |
| 16188 | Chautauqua | WESTFIELD (V) / Westfield (V) | Upgrade Water Treatment Plant | 3450 | $1,787,416.00 | 50 | $197,368,361.00) |
| 16559 | Chautauqua | HANOVER WD NO1 / Hanover (T) | Extend Distribution System | 3000 | $1,287,500.00 | 50 | $198,655,861.00) |
| 16908 | Chautauqua | TOWN OF BUSTI WATER DISTRICT #3 / Busti (T) | Extend Distribution System | 450 | $750,000.00 | 50 | $199,405,861.00) |
| 15724 | Chautauqua | LAKEWOOD VILLAGE / Lakewood (V) | New Transmission, New Pump Station, Inter-Connection | 5100 | $870,000.00 | 45 | $200,275,861.00) |
| 15022 | Chautauqua | DUNKIRK CITY / Dunkirk (C) | Upgrade Water Treatment Plant, Upgrade Distribution System | 15310 | $2,726,000.00 | 40 | $203,001,861.00) |
| 16296 | Chautauqua | SINCLAIRVILLE VILLAGE / Sinclairville (V) | Upgrade Ground Water Source, Upgrade Pump Station | 772 | $50,000.00 | 40 | $203,051,861.00) |
| 16183 | Chautauqua | WESTFIELD (V) / Westfield (V) | E. Main Street and Cass Street., Upgrade Distribution System | 3450 | $257,206.00 | 35 | $203,309,067.00) |
| 16184 | Chautauqua | WESTFIELD (V) / Westfield (V) | Oak St., Upgrade Distribution System | 3450 | $90,305.00 | 35 | $203,399,372.00) |
| 16022 | Chautauqua | FREDONIA VILLAGE / Fredonia (V) | New Transmission, Upgrade Distribution System, System Consolidation | 10400 | $716,800.00 | 35 | $204,116,172.00) |
| 16024 | Chautauqua | FREDONIA VILLAGE / Fredonia (V) | New Transmission, New Storage | 10400 | $779,200.00 | 30 | $204,895,372.00) |
| 16181 | Chautauqua | WESTFIELD (V) / Westfield (V) | Clean & reconstruct waterlines., Upgrade Distribution System | 3450 | $600,000.00 | 30 | $205,495,372.00) |
| 16665 | Chautauqua | WESTFIELD (V) / Westfield (V) | Upgrade Distribution System | 3450 | $54,167.00 | 30 | $205,549,539.00) |
| 16294 | Chautauqua | SINCLAIRVILLE VILLAGE / Sinclairville (V) | Upgrade Distribution System | 772 | $45,000.00 | 30 | $205,594,539.00) |
| 16609 | Chautauqua | HANOVER WD NO1 / Hanover (T) | Upgrade Distribution System | 3000 | $307,200.00 | 20 | $205,901,739.00) |
| 15725 | Chautauqua | LAKEWOOD VILLAGE / Lakewood (V) | New Storage | 5100 | $559,600.00 | 15 | $206,461,339.00) |
| CHEMUNG COUNTY | |||||||
| 16979 | Chemung | VILLAGE OF VAN ETTEN / Van Etten (V) | New system to serve area with private contaminated wells, consolidate public water supply, eliminate public water supply with past E. Coli detection. , New Complete System (New System) | 560 | $4,066,006.00 | 195 | $210,527,345.00) |
| 16259 | Chemung | WELLSBURG VILLAGE / Wellsburg (V) | New Transmission, New Pump Station, New Inter-Connection | 650 | $1,567,845.00 | 150 | $212,095,190.00) |
| 17144 | Chemung | TOWN OF CHEMUNG WATER SYSTEM / Chemung (T) | New Complete System (New System) | 280 | $5,109,000.00 | 125 | $217,204,190.00) |
| 16576 | Chemung | WESTOVER HILLS MHC / Leading Edge Properties | water softener system and, Upgrade Distribution System | 400 | $93,113.00 | 60 | $217,297,303.00) |
| 16560 | Chemung | ELMIRA WATER BOARD / Elmira Water Board | Upgrade Distribution System | 70000 | $1,545,000.00 | 45 | $218,842,303.00) |
| 16260 | Chemung | MILLPORT VILLAGE WATER SUPPLY / Millport (V) | Upgrade Ground Water Source | 440 | $125,000.00 | 40 | $218,967,303.00) |
| 16577 | Chemung | BELLAIR MOBILE HOME PARK / Elmira LLC | Upgrade Distribution System | 225 | $131,250.00 | 35 | $219,098,553.00) |
| 16723 | Chemung | WELLSBURG VILLAGE / Wellsburg (V) | Upgrade Distribution System | 650 | $644,700.00 | 35 | $219,743,253.00) |
| 16427 | Chemung | ROLLING ACRES MOBILE HOME PARK / Ashford Management Group, Inc. | Upgrade Distribution System | 270 | $139,000.00 | 10 | $219,882,253.00) |
| CHENANGO COUNTY | |||||||
| 15237 | Chenango | SHERBURNE VILLAGE / Sherburne (V) | New Ground Water Source, New Transmission, Upgrade Storage, Upgrade Distribution System | 1531 | $4,000,000.00 | 185 | $223,882,253.00) |
| 16991 | Chenango | OXFORD WATER DISTRICT #1 / Oxford (T) | Surface Water Treatment Rule Compliance Facility, New Transmission | 50 | $122,500.00 | 160 | $224,004,753.00) |
| 16912 | Chenango | TOWN OF NO. NORWICH WD #1 / North Norwich (T) | New system to serve area with private contaminated wells, consolidate public water supply, eliminate public water supply with past total coliform detection. , New Distribution System | 100 | $920,300.00 | 130 | $224,925,053.00) |
| 16687 | Chenango | NORWICH TOWN WATER DISTRICT #2 / Norwich (T) | Extend Distribution System | 200 | $390,885.00 | 45 | $225,315,938.00) |
| 15944 | Chenango | OXFORD VILLAGE / Oxford (V) | New Ground Water Source, Upgrade Distribution System | 1738 | $154,039.00 | 40 | $225,469,977.00) |
| CLINTON COUNTY | |||||||
| 15569 | Clinton | TOWN OF ELLENBURG / Ellenburg (T) | Extend Distribution System | 1000 | $3,339,464.00 | 200 | $228,809,441.00) |
| 16249 | Clinton | COBBLESTONE COVE / Pray's Beach & Motel | New Ground Water Source | 75 | $104,497.00 | 125 | $228,913,938.00) |
| 15337 | Clinton | MORRISONVILLE WATER DISTRICT / Schuyler Falls (T) | New Ground Water Source, New Distribution System | 1300 | $3,587,392.00 | 120 | $232,501,330.00) |
| 16502 | Clinton | ROUSES POINT VILLAGE / Rouses Point (V) | Filter Plant Replacement, Upgrade Water Treatment Plant, Upgrade Transmission, New Storage, Upgrade Distribution System | 2500 | $3,000,000.00 | 115 | $235,501,330.00) |
| 17179 | Clinton | SOUTH PLATTSBURGH WATER DISTRICT / Plattsburgh (T) | New Pump Station, New Distribution System, New System Consolidation | 2000 | $4,575,000.00 | 90 | $240,076,330.00) |
| 17148 | Clinton | ROUTE 9/SPELLMAN ROAD / Beekmantown (T) | New Distribution System, New System Consolidation | 500 | $1,589,000.00 | 90 | $241,665,330.00) |
| 16498 | Clinton | TOWN OF CHAMPLAIN / Champlain (T) | Develop Source for Town Districts (4), New Ground Water Source, Upgrade Transmission, Upgrade Storage, Upgrade Distribution System | 1350 | $2,131,740.00 | 85 | $243,797,070.00) |
| 16725 | Clinton | AUSABLE HEIGHTS WATER SYSTEM / Ausable (T) | New Ground Water Source, Upgrade Distribution System | 25 | $207,800.00 | 80 | $244,004,870.00) |
| 17323 | Clinton | PLEASANT RIDGE WD / Plattsburgh (T) | New Distribution System, New System Consolidation | 980 | $1,120,500.00 | 75 | $245,125,370.00) |
| 16371 | Clinton | CHAMPLAIN VILLAGE / Champlain (V) | Distribution Loops, Upgrade Distribution System | 1300 | $531,675.00 | 65 | $245,657,045.00) |
| 16373 | Clinton | CHAMPLAIN VILLAGE / Champlain (V) | Main replacement, Upgrade Distribution System | 1300 | $199,385.00 | 60 | $245,856,430.00) |
| 17227 | Clinton | WATER DISTRICT EXTENSION NO. 1 / Chazy (T) | Extend Distribution System | 40 | $265,000.00 | 55 | $246,121,430.00) |
| 15660 | Clinton | TOWN OF MOOERS PROPOSED WD#1 / Mooers (T) | Extend Distribution System | 1250 | $6,212,250.00 | 50 | $252,333,680.00) |
| 16374 | Clinton | CHAMPLAIN VILLAGE / Champlain (V) | Upgrade Storage | 1300 | $332,290.00 | 40 | $252,665,970.00) |
| 17309 | Clinton | PLEASANT RIDGE TRAILER PARK / Pleasant Ridge MHP | New Storage | 50 | $8,096.00 | 40 | $252,674,066.00) |
| 15401 | Clinton | PERU WD / Peru (T) | Upgrade Surface Water Source, New Transmission | 2500 | $620,000.00 | 25 | $253,294,066.00) |
| 17340 | Clinton | MORRISONVILLE W D N0 1 & 2 / Plattsburgh (T) | New Other Expenses, New Other (OT) | 1825 | $541,000.00 | 25 | $253,835,066.00) |
| 16372 | Clinton | CHAMPLAIN VILLAGE / Champlain (V) | Computerization of metering and billing, Other Expenses, Other (OT) | 1300 | $34,900.00 | 25 | $253,869,966.00) |
| 16227 | Clinton | MORRISONVILLE W D N0 1 & 2 / Schuyler Falls (T) | Upgrade Pump Station | 1825 | $142,000.00 | 20 | $254,011,966.00) |
| 16230 | Clinton | MORRISONVILLE W D N0 1 & 2 / Schuyler Falls (T) | New Storage | 1825 | $565,000.00 | 20 | $254,576,966.00) |
| 16494 | Clinton | TOWN OF CHAMPLAIN / Champlain (T) | System Acquisition-"Benefit Area #1", New Ground Water Source, New Distribution System | 50 | $497,200.00 | 20 | $255,074,166.00) |
| COLUMBIA COUNTY | |||||||
| 17288 | Columbia | HUDSON CITY / Hudson (C) | Phase 2 of #16251, New Surface Water Treatment Rule Compliance Facility, New Storage | 7986 | $1,000,000.00 | 2,205 | $256,074,166.00) |
| 15773 | Columbia | STOCKPORT WD #2 (CONSOLIDATED) / Stockport (T) | New Surface Water Treatment Rule Compliance Facility, New Transmission, New Storage | 3100 | $5,446,313.00 | 210 | $261,520,479.00) |
| 17175 | Columbia | TOWN OF CLAVERACK WD #1 / Claverack (T) | New system to serve users previously on (C) Hudson raw water main, New Surface Water Treatment Rule Compliance Facility, New Complete System (New System), New Inter-Connection, New System Consolidation | 1200 | $4,067,000.00 | 180 | $265,587,479.00) |
| 16394 | Columbia | MAPLE LANE ASSOCIATES / Maple Lane Associates | New Ground Water Source, New Transmission, New Distribution System | 147 | $233,295.00 | 165 | $265,820,774.00) |
| 16495 | Columbia | PHILMONT VILLAGE / Philmont (V) | Upgrade Ground Water Source, Upgrade Distribution System | 1702 | $492,022.00 | 140 | $266,312,796.00) |
| 15532 | Columbia | CHATHAM VILLAGE / Chatham (V) | Upgrade Ground Water Source, Upgrade Storage | 3250 | $724,800.00 | 85 | $267,037,596.00) |
| 16444 | Columbia | DARROW SCHOOL / The Darrow School | New Ground Water Source, New Storage | 150 | $169,950.00 | 75 | $267,207,546.00) |
| 16920 | Columbia | HAMLET OF EAST CHATHAM / Chatham (T) | New Complete System (New System) | 65 | $1,009,745.00 | 45 | $268,217,291.00) |
| 15765 | Columbia | GREENPORT WD NO1 / Greenport (T) | Charles St., Janis St., Greenport Pkwy., and Rte. 9, Upgrade Distribution System | 4050 | $651,475.00 | 40 | $268,868,766.00) |
| 16489 | Columbia | H H D CORP NORTH SHORE / HHD Development Corporation | Upgrade Distribution System | 25 | $225,000.00 | 35 | $269,093,766.00) |
| 15769 | Columbia | GREENPORT WD NO1 / Greenport (T) | Upgrade Pump Station | 4050 | $637,313.00 | 35 | $269,731,079.00) |
| 15535 | Columbia | CHATHAM VILLAGE / Chatham (V) | Upgrade Ground Water Source, Upgrade Distribution System | 3250 | $1,240,000.00 | 35 | $270,971,079.00) |
| 15775 | Columbia | STOCKPORT WD #2 (CONSOLIDATED) / Stockport (T) | Upgrade Distribution System | 3100 | $900,463.00 | 30 | $271,871,542.00) |
| 15761 | Columbia | GREENPORT WD NO1 / Greenport (T) | Control System Improvements, Upgrade Distribution System | 4050 | $354,063.00 | 30 | $272,225,605.00) |
| 15757 | Columbia | GREENPORT WD NO1 / Greenport (T) | Upgrade Storage | 4050 | $80,443.00 | 25 | $272,306,048.00) |
| 15117 | Columbia | HUNT HOMESTEAD / Hunt's Homestead MHP | Upgrade Storage | 51 | $41,200.00 | 15 | $272,347,248.00) |
| CORTLAND COUNTY | |||||||
| 15586 | Cortland | MARATHON VILLAGE / Marathon (V) | New Ground Water Source, New Transmission, Upgrade Distribution System | 1107 | $930,000.00 | 145 | $273,277,248.00) |
| 15294 | Cortland | HOMER VILLAGE-NEWTON WATER WORKS / Homer (V) | New Transmission, New Pump Station | 4368 | $325,000.00 | 100 | $273,602,248.00) |
| 15287 | Cortland | TOWN OF VIRGIL / Virgil (T) | Upgrade Ground Water Source, New Storage, Extend Distribution System, System Consolidation | 345 | $2,223,234.00 | 50 | $275,825,482.00) |
| 15297 | Cortland | HOMER VILLAGE-NEWTON WATER WORKS / Homer (V) | Upgrade Distribution System | 4368 | $440,000.00 | 50 | $276,265,482.00) |
| 15302 | Cortland | CORTLAND WATER BOARD / Cortland (C) | New Transmission, New Storage | 20094 | $2,592,000.00 | 35 | $278,857,482.00) |
| 17190 | Cortland | CINCINNATUS WATER DISTRICT / Cincinnatus (T) | Upgrade Ground Water Source, Upgrade Transmission | 650 | $126,500.00 | 30 | $278,983,982.00) |
| 15298 | Cortland | HOMER VILLAGE-NEWTON WATER WORKS / Homer (V) | New Transmission, New Storage | 4368 | $528,750.00 | 25 | $279,512,732.00) |
| DELAWARE COUNTY | |||||||
| 16797 | Delaware | STAMFORD VILLAGE / Stamford (V) | Phase 2 of Project 15027, New Water Treatment Plant | 1240 | $46,735.00 | 2,150 | $279,559,467.00) |
| 17228 | Delaware | GRAND GORGE WATER DISTRICT / Roxbury (T) | Phase 2 (cost overrun) of project 15624, New Water Treatment Plant, New Ground Water Source | 380 | $150,000.00 | 2,140 | $279,709,467.00) |
| 16587 | Delaware | DAVENPORT WATER CO / Davenport Water Co. | New wells to replace GWUDI springs, New Transmission, New Transmission, New Storage | 104 | $775,000.00 | 220 | $280,484,467.00) |
| 17272 | Delaware | TOWN OF DAVENPORT WD / Davenport (T) | Acquisition and improvement of private water company by (T) Davenport. New wells to replace GWUDI springs, New Ground Water Source, New Storage, New Water District | 104 | $823,500.00 | 220 | $281,307,967.00) |
| 15024 | Delaware | HALCOTTSVILLE WATER DISTRICT NO. 1 / Middletown(T) | New Ground Water Source, Upgrade Transmission, Upgrade Storage | 43 | $359,000.00 | 200 | $281,666,967.00) |
| 16606 | Delaware | DELHI VILLAGE / Delhi (V) | New Ground Water Source, Upgrade Distribution System | 3833 | $1,135,500.00 | 185 | $282,802,467.00) |
| 17046 | Delaware | ANDES VILLAGE / Andes (V) | Extend Distribution System, New System Consolidation | 300 | $182,350.00 | 170 | $282,984,817.00) |
| 15996 | Delaware | FRANKLIN VILLAGE / Franklin (V) | New Ground Water Source, New Storage, Upgrade Distribution System | 480 | $1,109,365.00 | 110 | $284,094,182.00) |
| 16744 | Delaware | FLEISCHMANNS VILLAGE / Fleischmanns (V) | New Ground Water Source, New Storage, Upgrade Distribution System | 625 | $1,050,000.00 | 105 | $285,144,182.00) |
| 16653 | Delaware | WALTON VILLAGE / Walton (V) | New Other Expenses, Upgrade Storage, Upgrade Distribution System, Extend Distribution System, New Other (OT) | 3231 | $2,183,959.00 | 100 | $287,328,141.00) |
| 15006 | Delaware | HOBART VILLAGE / Hobart (V) | New Water Treatment Plant, New Ground Water Source, New Transmission | 380 | $857,000.00 | 80 | $288,185,141.00) |
| 15843 | Delaware | MARGARETVILLE VILLAGE / Margaretville (V) | Upgrade Storage, Upgrade Distribution System | 660 | $737,900.00 | 75 | $288,923,041.00) |
| 15619 | Delaware | ROXBURY WATER DISTRICT / Roxbury (T) | Upgrade Storage, Upgrade Distribution System | 750 | $411,000.00 | 65 | $289,334,041.00) |
| 15316 | Delaware | ARKVILLE WATER DISTRICT / Middletown (T) | Upgrade Ground Water Source | 250 | $494,400.00 | 35 | $289,828,441.00) |
| 15836 | Delaware | MARGARETVILLE VILLAGE / Margaretville (V) | Upgrade Distribution System | 660 | $1,011,000.00 | 35 | $290,839,441.00) |
| DUTCHESS COUNTY | |||||||
| 16947 | Dutchess | GREENBUSH AREA WATER DISTRICT / Hyde Park (T) | Consolidation of systems, extension to serve private contiminated wells., New Distribution System | 700 | $3,174,257.00 | 1,120 | $294,013,698.00) |
| NOTE: Short-Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 15292 | Dutchess | WAPPINGER PARK HOMES / Wappinger (T) | Central Wappinger Water Improvement Area, Ardmore Hills Water Impr. Area, N. Wappinger Water Impr. Area, Cranberry Hills Water Impr. Area, & Meadowood and Cedar Ridge Subdiv., New Storage, System Consolidation | 400 | $14,676,600.00 | 155 | $308,690,298.00) |
| 16876 | Dutchess | BRETTVIEW ACRES WATER CO / Brettview Water Co. Inc. | New Surface Water Treatment Rule Compliance Facility | 920 | $40,800.00 | 115 | $308,731,098.00) |
| 17071 | Dutchess | BIRCH HILL MANOR / Birch Hill Water Supply Corp. | To address an inadequate source capacity, Iron, Lead and Copper violations., Upgrade Water Treatment Plant, New Ground Water Source | 180 | $400,000.00 | 115 | $309,131,098.00) |
| 16741 | Dutchess | PAWLING VILLAGE / Pawling (V) | New Ground Water Source | 2181 | $1,138,800.00 | 105 | $310,269,898.00) |
| 15301 | Dutchess | TIVOLI VILLAGE / Tivoli (V) | Construct 2 supply wells, treatment, storage, interconnect Village with (T) Redhook & Rokeby Estates, New Ground Water Source, New Storage, New Inter-Connection | 1303 | $3,523,790.00 | 105 | $313,793,688.00) |
| 17021 | Dutchess | ROKEBY HOMES,INC. / Dutchess Co Water & Waste Aut | Upgrade Ground Water Source, Upgrade Distribution System, New System Consolidation | 160 | $343,717.00 | 100 | $314,137,405.00) |
| 16618 | Dutchess | SHOREHAVEN CIVIC ASSOC / Shore Haven Civic Assoc. | Upgrade Water Treatment Plant, New Ground Water Source | 300 | $600,000.00 | 95 | $314,737,405.00) |
| 16534 | Dutchess | WAPPINGER PARK HOMES / Wappinger (T) | Consolidation of Wappinger Park, Tall Trees, and Oakwood Water Districts, New Transmission, New Inter-Connection | 400 | $7,649,165.00 | 95 | $322,386,570.00) |
| 15288 | Dutchess | WAPPINGERS FALLS VILLAGE / Wappingers Falls (V) | Upgrade Ground Water Source | 6000 | $250,000.00 | 90 | $322,636,570.00) |
| 16766 | Dutchess | ARBORS CONDOMINIUMS / Hyde Park (T) | Extend system to consolidate public water supply, eliminate public water supply with past totalColi detection. , New System Consolidation | 450 | $215,500.00 | 90 | $322,852,070.00) |
| 16111 | Dutchess | BARD COLLEGE / Bard College | Upgrade Water Treatment Plant, New Storage | 1400 | $1,417,500.00 | 85 | $324,269,570.00) |
| 16737 | Dutchess | DOVER RIDGE ESTATES / Beekman (T) | Upgrade Ground Water Source | 250 | $266,500.00 | 65 | $324,536,070.00) |
| 17282 | Dutchess | RHINEBECK VILLAGE WATER / Rhinebeck (V) | Upgrade Water Treatment Plant | 4300 | $365,200.00 | 65 | $324,901,270.00) |
| 16235 | Dutchess | RED HOOK VILLAGE / Red Hook (V) | New Ground Water Source | 2214 | $433,000.00 | 60 | $325,334,270.00) |
| 17338 | Dutchess | DUTCHESS ESTATES INC / Dutchess Estates Water Company | Upgrade Pump Station | 500 | $455,388.00 | 55 | $325,789,658.00) |
| 15740 | Dutchess | AMENIA WATER DISTRICT NO 1 / Amenia (T) | New Storage, Upgrade Distribution System | 1000 | $1,480,000.00 | 55 | $327,269,658.00) |
| 15295 | Dutchess | BEEKMAN (T) / Beekman (T) | New Complete System (New System), New Distribution System | 80 | $579,478.00 | 45 | $327,849,136.00) |
| 16803 | Dutchess | LAGRANGE/MANCHESTER / LaGrange (T) | New Water District | 2500 | $7,813,000.00 | 40 | $335,662,136.00) |
| 16583 | Dutchess | LAKE LODGES APARTMENTS / Lake Lodge Apts. | New Ground Water Source, Upgrade Pump Station, Upgrade Distribution System | 30 | $85,000.00 | 35 | $335,747,136.00) |
| 16246 | Dutchess | LITTLE SWITZERLAND / East Fishkill (T) | Upgrade Distribution System, System Consolidation | 600 | $428,900.00 | 35 | $336,176,036.00) |
| 15938 | Dutchess | TACONIC ESTATES WATER DISTRICT / East Fishkill (T) | New Ground Water Source, System Consolidation | 185 | $148,000.00 | 35 | $336,324,036.00) |
| 15645 | Dutchess | POUGHKEEPSIE TOWNWIDE WD / Poughkeepsie (T) | System Consolidation | 27000 | $6,650,000.00 | 35 | $342,974,036.00) |
| 16297 | Dutchess | WINGDALE VILLAGE PARK / Wingdale Village Park | Upgrade Water Treatment Plant, New Ground Water Source | 150 | $74,000.00 | 30 | $343,048,036.00) |
| 16461 | Dutchess | STONEY CREEK FARMS (TOWN HOMES / Stoney Creek Farms Homeowners | New Water Treatment Plant | 28 | $18,000.00 | 30 | $343,066,036.00) |
| 16845 | Dutchess | VICTORY LAKE NURSING HOME / Victory Lake Nursing Center | Upgrade Storage, Upgrade Distribution System | 270 | $367,092.00 | 20 | $343,433,128.00) |
| 15595 | Dutchess | RED HOOK VILLAGE / Red Hook (V) | Upgrade Ground Water Source | 2214 | $142,000.00 | 20 | $343,575,128.00) |
| 16236 | Dutchess | RED HOOK VILLAGE / Red Hook (V) | New Storage | 2214 | $721,000.00 | 20 | $344,296,128.00) |
| 16384 | Dutchess | TOWN OF NORTHEAST WD / Northeast (T) | Upgrade Distribution System, New Water District | 411 | $100,000.00 | 20 | $344,396,128.00) |
| 16514 | Dutchess | DUTCHESS CO WATER AUTH - VALLEYDALE / Dutchess Co Water & Waste Aut | New Ground Water Source, Upgrade Distribution System | 500 | $306,365.00 | 15 | $344,702,493.00) |
| 15930 | Dutchess | RHINEBECK VILLAGE WATER / Rhinebeck (V) | Remediate backwash "Sludge Pond", Upgrade Water Treatment Plant | 4300 | $223,000.00 | 15 | $344,925,493.00) |
| 15879 | Dutchess | GREENFIELD WATER DISTRICT / Hyde Park (T) | New Water Treatment Plant, New Storage | 1050 | $759,522.00 | 15 | $345,685,015.00) |
| 15927 | Dutchess | RHINEBECK VILLAGE WATER / Rhinebeck (V) | Upgrade Distribution System | 4300 | $1,569,000.00 | 15 | $347,254,015.00) |
| 15662 | Dutchess | PINE PLAINS WATER IMPROVEMENT / Pine Plains (T) | Upgrade Distribution System | 860 | $1,617,284.00 | 15 | $348,871,299.00) |
| 15644 | Dutchess | POUGHKEEPSIE TOWNWIDE WD / Poughkeepsie (T) | Upgrade Distribution System | 27000 | $410,000.00 | 10 | $349,281,299.00) |
| 16540 | Dutchess | CHARLOTTE GROVE MOBILE HOME CT / Charlette Grove Mobil Home Cou | Upgrade Distribution System | 112 | $302,820.00 | 10 | $349,584,119.00) |
| ERIE COUNTY | |||||||
| 17287 | Erie | FARNHAM VILLAGE / Farnham (V) | Phase 2 of DWSRF#16271., Upgrade Transmission, New Storage, Upgrade Distribution System | 404 | $250,000.00 | 2,110 | $349,834,119.00) |
| 16888 | Erie | AURORA WATER DISTRICT 18 / Aurora (T) | Extend system to serve area with private contaminated wells, consolidate public water supply, eliminate public water supply with past total Coliform detection. , Extend Distribution System | 1000 | $1,528,102.00 | 1,120 | $351,362,221.00) |
| NOTE: Short-Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 17180 | Erie | BUFFALO WATER AUTHORITY / Buffalo City Water Board | Upgrade Water Treatment Plant | 345974 | $12,339,234.00 | 1,100 | $363,701,455.00) |
| NOTE: Short-Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 17337 | Erie | HUNTERS CREEK MOBILE HOME PARK / Myron Robbins | Address total coliform detections and organic exceedances, Upgrade Water Treatment Plant, New Storage, New Pump Station, Upgrade Distribution System | 150 | $175,100.00 | 185 | $363,876,555.00) |
| 17339 | Erie | WALES WATER DISTRICT NO. 1 / Wales (T) | Extend Distribution System, System Consolidation | 2950 | $9,790,000.00 | 135 | $373,666,555.00) |
| 17169 | Erie | ERIE COUNTY WATER AUTHORITY / Erie County Water Authority | Consolidation of the (C) Buffalo's system into ECWA,, New System Consolidation | 402180 | $152,500,000.00 | 125 | $526,166,555.00) |
| 15680 | Erie | TOWN OF COLDEN WATER DISTRICT #1 / Colden (T) | Extend to serve private contaminated wells, consolidate public water supplies, eliminate public water supply with past coliform detections., Extend Distribution System | 450 | $2,391,100.00 | 120 | $528,557,655.00) |
| 17151 | Erie | AURORA WATER DISTRICT 18 / Aurora (T) | Extend system to serve area with private contaminated wells, consolidate public water supply, eliminate public water supply with past total coliform detection. WD 18, Section B., Extend Distribution System | 1288 | $6,849,500.00 | 115 | $535,407,155.00) |
| 15922 | Erie | ALDEN VILLAGE / Alden (V) | Upgrade Ground Water Source | 2666 | $640,003.00 | 105 | $536,047,158.00) |
| 16087 | Erie | TOWN OF NEWSTEAD / Newstead (T) | New Storage, Extend Distribution System, System Consolidation | 5000 | $6,280,000.00 | 105 | $542,327,158.00) |
| 15602 | Erie | EVANS WD #5 / Evans (T) | Extend system to serve area with private contaminated wells, remediate existing pressure problems. , Extend Distribution System | 3136 | $983,000.00 | 100 | $543,310,158.00) |
| 17090 | Erie | SPRINGVILLE VILLAGE / Springville (V) | Upgrade Water Treatment Plant, New Storage, Upgrade Distribution System | 4310 | $4,569,080.00 | 95 | $547,879,238.00) |
| 15736 | Erie | COLLINS WD #3 / Collins (T) | Upgrade Transmission, New Storage, Upgrade Distribution System | 760 | $625,000.00 | 80 | $548,504,238.00) |
| 15982 | Erie | TOWN OF EDEN PROPOSED WATER DISTRICT / Eden (T) | Extend Distribution System | 300 | $725,000.00 | 70 | $549,229,238.00) |
| 15981 | Erie | AKRON VILLAGE / Akron (V) | Upgrade Water Treatment Plant | 2971 | $2,380,000.00 | 65 | $551,609,238.00) |
| 15880 | Erie | EVANS, TOWN WATER DEPARTMENT / Evans (T) | Angola Service Area of the NYS Thruway Authority., Extend Distribution System | 14329 | $225,000.00 | 60 | $551,834,238.00) |
| 15339 | Erie | EAST HILL WATER DISTRICT NO. 3 / Boston (T) | New Storage, New Pump Station, Extend Distribution System | 800 | $3,708,000.00 | 55 | $555,542,238.00) |
| 16851 | Erie | TOWN OF AURORA WATER IMP. AREA NO. 5 / Aurora (T) | Extend Distribution System | 210 | $613,500.00 | 55 | $556,155,738.00) |
| 15508 | Erie | TOWN OF MARILLA WATER DISTRICT #3 / Marilla (T) | Extend Distribution System | 1530 | $2,420,500.00 | 50 | $558,576,238.00) |
| 15497 | Erie | TOWN OF MARILLA WATER DISTRICT NO. 4 / Marilla (T) | Extend Distribution System | 760 | $2,249,845.00 | 50 | $560,826,083.00) |
| 16557 | Erie | TOWN OF NEWSTEAD WD#7 / Newstead (T) | Fletcher Road, Extend Distribution System | 30 | $127,300.00 | 50 | $560,953,383.00) |
| 15738 | Erie | COLLINS WD'S #1 AND #2 / Collins (T) | New Transmission, New Storage, Upgrade Distribution System | 1300 | $566,500.00 | 45 | $561,519,883.00) |
| 15439 | Erie | ANGOLA VILLAGE / Angola (V) | New Storage, Upgrade Distribution System | 3200 | $4,090,000.00 | 45 | $565,609,883.00) |
| 15004 | Erie | BOSTON WD #2 / Boston (T) | New Storage, New Pump Station, Extend Distribution System | 25 | $1,230,000.00 | 40 | $566,839,883.00) |
| 15606 | Erie | EVANS WD #3 / Evans (T) | Extend Distribution System | 704 | $310,000.00 | 35 | $567,149,883.00) |
| 15898 | Erie | GOWANDA VILLAGE / Gowanda (V) | New Transmission | 2800 | $885,250.00 | 35 | $568,035,133.00) |
| 15961 | Erie | ELMA WATER DISTRICT NO. 1 / Elma (T) | Upgrade Distribution System | 10287 | $145,300.00 | 30 | $568,180,433.00) |
| 15534 | Erie | COLLINS WD #4 / Collins (T) | New Pump Station | 73 | $235,000.00 | 30 | $568,415,433.00) |
| 15133 | Erie | HOLLAND WATER DISTRICT / Holland (T) | Upgrade Water Treatment Plant, New Ground Water Source | 1680 | $200,000.00 | 25 | $568,615,433.00) |
| 16016 | Erie | DEPEW VILLAGE / Depew (V) | Extend Distribution System | 7500 | $112,500.00 | 25 | $568,727,933.00) |
| 16167 | Erie | GRAND ISLAND WD #1 / Grand Island (T) | Upgrade Water Treatment Plant | 205 | $1,459,374.00 | 20 | $570,187,307.00) |
| 15477 | Erie | ERIE COUNTY WATER AUTHORITY / ECWA/ Amherst (T) | Town of Amherst WD 15C - Country Parkway., Upgrade Distribution System | 402180 | $275,000.00 | 20 | $570,462,307.00) |
| 15479 | Erie | ERIE COUNTY WATER AUTHORITY / ECWA/ Amherst (T) | Town of Amherst-Sheridan Dr. to Klein Rd., Upgrade Distribution System | 402180 | $550,000.00 | 20 | $571,012,307.00) |
| 15484 | Erie | ERIE COUNTY WATER AUTHORITY / ECWA/ Amherst (T) | Town of Amherst WD 15C - Niagara Falls Blvd., Upgrade Distribution System | 402180 | $300,000.00 | 20 | $571,312,307.00) |
| 15486 | Erie | ERIE COUNTY WATER AUTHORITY / ECWA/ Amherst (T) | Town of Amherst WD 15C - Casey Rd., Upgrade Distribution System | 402180 | $250,000.00 | 20 | $571,562,307.00) |
| 16042 | Erie | EAST AURORA VILLAGE / East Aurora (V) | Upgrade Distribution System | 7200 | $1,707,950.00 | 20 | $573,270,257.00) |
| 16578 | Erie | SPRINGVILLE MOBILE VILLAGE / Parss Properties | New Ground Water Source | 90 | $48,600.00 | 20 | $573,318,857.00) |
| 16758 | Erie | WEST SENECA WD NO3 / West Seneca (T) | Orchard Park Road Watermain, Upgrade Distribution System | 25 | $460,000.00 | 20 | $573,778,857.00) |
| 16501 | Erie | BLASDELL VILLAGE / Blasdell (V) | Phase 1, see project #16624 for phase 2., Upgrade Distribution System | 3288 | $860,500.00 | 20 | $574,639,357.00) |
| 16624 | Erie | BLASDELL VILLAGE / Blasdell (V) | Phase 2, see project #16501 for phase 1., Upgrade Distribution System | 3288 | $651,600.00 | 20 | $575,290,957.00) |
| 15444 | Erie | WILLIAMSVILLE (V) / Williamsville (V) | Northeast quadrant transmission system improvements., Upgrade Distribution System | 6017 | $808,396.00 | 15 | $576,099,353.00) |
| 15469 | Erie | WILLIAMSVILLE (V) / Williamsville (V) | Los Robles Street water reconstruction project., Upgrade Distribution System | 6017 | $408,447.00 | 15 | $576,507,800.00) |
| 16815 | Erie | LANCASTER VILLAGE / Lancaster (V) | Upgrade Distribution System | 13056 | $1,670,454.00 | 15 | $578,178,254.00) |
| 16187 | Erie | GRAND ISLAND TOWN WATER DEPT. / Grand Island (T) | Upgrade Water Treatment Plant | 19000 | $340,000.00 | 10 | $578,518,254.00) |
| 17335 | Erie | WILLIAMSVILLE (V) / Williamsville (V) | Upgrade Distribution System | 6017 | $2,700,000.00 | 10 | $581,218,254.00) |
| 16396 | Erie | ORCHARD PARK VILLAGE / Orchard Park (V) | Upgrade Distribution System | 3100 | $50,000.00 | 10 | $581,268,254.00) |
| 16740 | Erie | ORCHARD PARK WD#1 / Orchard Park (T) | 2000 water system improvements., Upgrade Distribution System | 612 | $7,081,000.00 | 10 | $588,349,254.00) |
| 16178 | Erie | GRAND ISLAND TOWN WATER DEPT. / Grand Island (T) | Ransom Road waterline improvements., Upgrade Distribution System | 19000 | $111,453.00 | 5 | $588,460,707.00) |
| 16182 | Erie | GRAND ISLAND TOWN WATER DEPT. / Grand Island (T) | Bush Road waterline improvements., Upgrade Distribution System | 19000 | $228,113.00 | 5 | $588,688,820.00) |
| 16185 | Erie | GRAND ISLAND TOWN WATER DEPT. / Grand Island (T) | Sandy Beach waterline improvements., Upgrade Distribution System | 19000 | $986,154.00 | 5 | $589,674,974.00) |
| 15118 | Erie | CLARENCE, TOWN WATER DEPT. / Clarence (T) | Sheridan Drive watermain replacement., Upgrade Distribution System | 15000 | $1,597,700.00 | 5 | $591,272,674.00) |
| 15119 | Erie | CLARENCE, TOWN WATER DEPT. / Clarence (T) | Main Street watermain replacement., Upgrade Distribution System | 15000 | $2,650,000.00 | 5 | $593,922,674.00) |
| 15120 | Erie | CLARENCE, TOWN WATER DEPT. / Clarence (T) | Goodrich Road Watermain Extension., Extend Distribution System | 15000 | $165,000.00 | 5 | $594,087,674.00) |
| 15121 | Erie | CLARENCE, TOWN WATER DEPT. / Clarence (T) | Harris Hill Road & Arondale Drive watermain replacements., Upgrade Distribution System | 15000 | $726,200.00 | 5 | $594,813,874.00) |
| 16556 | Erie | WILLIAMSVILLE (V) / Williamsville (V) | Mill Street, Upgrade Distribution System | 6017 | $141,000.00 | 5 | $594,954,874.00) |
| 15627 | Erie | HAMBURG WD #1 / Hamburg (T) | New Distribution System | 25 | $1,346,725.00 | 5 | $596,301,599.00) |
| ESSEX COUNTY | |||||||
| 17031 | Essex | CROWN POINT WD / Crown Point (T) | Phase 2 of DWSRF Project #15889, New Ground Water Source, New Storage, New Pump Station, Upgrade Distribution System | 995 | $1,582,000.00 | 2,115 | $597,883,599.00) |
| 17023 | Essex | RAY BROOK WD / North Elba (T) | Phase 2 of DWSRF #15809. , New Ground Water Source, Upgrade Storage, Upgrade Distribution System | 400 | $499,404.00 | 2,100 | $598,383,003.00) |
| 15848 | Essex | MORIAH WD / Moriah (T) | New Surface Water Treatment Rule Compliance Facility, New Transmission, New Storage | 3100 | $0.00 | 1,240 | $598,383,003.00) |
| NOTE: Short-Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 16044 | Essex | ELIZABETHTOWN WD / Elizabethtown (T) | New Ground Water Source, New Storage, Upgrade Distribution System | 800 | $6,158,500.00 | 265 | $604,541,503.00) |
| 15873 | Essex | WESTPORT WD / Westport (T) | New Ground Water Source, Upgrade Distribution System | 800 | $6,460,838.00 | 235 | $611,002,341.00) |
| 15839 | Essex | LEWIS WD / Lewis (T) | New Ground Water Source, Upgrade Distribution System | 428 | $1,180,013.00 | 215 | $612,182,354.00) |
| 15844 | Essex | KEENE WD / Keene (T) | New Ground Water Source, New Transmission, New Storage, Upgrade Distribution System | 450 | $2,475,353.00 | 200 | $614,657,707.00) |
| 17053 | Essex | UPPER JAY WD / Jay (T) | New Surface Water Treatment Rule Compliance Facility, Upgrade Transmission, Upgrade Storage, Upgrade Distribution System | 234 | $2,624,135.00 | 185 | $617,281,842.00) |
| 17069 | Essex | WILLSBORO WD / Willsboro (T) | Extend to serve Willsboro Bay WD for SWTR compliance., Upgrade Distribution System, New System Consolidation | 1571 | $3,265,821.00 | 185 | $620,547,663.00) |
| 17052 | Essex | WILMINGTON WD / Wilmington (T) | Upgrade Transmission, New Storage, Upgrade Distribution System | 980 | $6,147,290.00 | 185 | $626,694,953.00) |
| 17195 | Essex | KEENE VALLEY WD / Keene (T) | New Ground Water Source, New Storage, Upgrade Distribution System | 300 | $3,059,826.00 | 165 | $629,754,779.00) |
| 17164 | Essex | TICONDEROGA WD / Ticonderoga (T) | Extention of Town system to serve Shore Airport Road and the International Paper Mill., New Storage, New Distribution System, New System Consolidation | 5000 | $2,063,553.00 | 130 | $631,818,332.00) |
| 15829 | Essex | MINERVA WD / Minerva (T) | New Ground Water Source, Upgrade Distribution System, New System Consolidation | 900 | $1,346,787.00 | 105 | $633,165,119.00) |
| 17163 | Essex | TICONDEROGA WD / Ticonderoga (T) | New Transmission, New Storage | 5000 | $8,883,467.00 | 105 | $642,048,586.00) |
| 15881 | Essex | WADHAMS WD / Westport (T) | New Ground Water Source, Upgrade Distribution System | 140 | $192,095.00 | 100 | $642,240,681.00) |
| 15876 | Essex | WESTPORT WD / Westport (T) | Upgrade Transmission, Upgrade Distribution System | 800 | $175,306.00 | 95 | $642,415,987.00) |
| 15827 | Essex | MINERVA WD / Minerva (T) | New Storage, Upgrade Distribution System | 900 | $175,000.00 | 75 | $642,590,987.00) |
| 16589 | Essex | MORIAH WD / Moriah (T) | Upgrade Distribution System | 3100 | $239,450.00 | 65 | $642,830,437.00) |
| 15797 | Essex | PORT HENRY V / Port Henry (V) | Upgrade Transmission, Upgrade Distribution System | 1831 | $511,910.00 | 65 | $643,342,347.00) |
| 16659 | Essex | PORT HENRY V / Port Henry (V) | Upgrade Distribution System | 1831 | $4,315,148.00 | 65 | $647,657,495.00) |
| 15846 | Essex | MORIAH WD / Moriah (T) | Upgrade Distribution System | 3100 | $606,876.00 | 60 | $648,264,371.00) |
| 15849 | Essex | MORIAH WD / Moriah (T) | New Other Expenses, Upgrade Distribution System, New Other (OT) | 3100 | $1,573,733.00 | 60 | $649,838,104.00) |
| 15841 | Essex | LEWIS WD / Lewis (T) | Upgrade Distribution System | 428 | $792,076.00 | 55 | $650,630,180.00) |
| 16045 | Essex | NEW RUSSIA WD / Elizabethtown (T) | Upgrade Water Treatment Plant, New Storage, Upgrade Distribution System | 60 | $135,000.00 | 45 | $650,765,180.00) |
| 16897 | Essex | CROWN POINT WD / Crown Point (T) | Upgrade Distribution System | 995 | $400,000.00 | 35 | $651,165,180.00) |
| 17193 | Essex | AUSABLE FORKS WD / Jay (T) | New Storage | 900 | $1,083,663.00 | 35 | $652,248,843.00) |
| 16378 | Essex | WILMINGTON WD / Willmington (T) | Upgrade Surface Water Source, Upgrade Transmission | 980 | $30,000.00 | 30 | $652,278,843.00) |
| 15806 | Essex | WINEBROOK HILLS WD / Newcomb (T) | Upgrade Storage | 100 | $326,253.00 | 30 | $652,605,096.00) |
| FRANKLIN COUNTY | |||||||
| 17085 | Franklin | MALONE V / Malone (V) | New Surface Water Treatment Rule Compliance Facility, New Storage | 13000 | $4,655,600.00 | 230 | $657,260,696.00) |
| 16861 | Franklin | TUPPER LAKE V / Tupper Lake (V) | New Storage, Upgrade Distribution System | 6000 | $633,104.00 | 115 | $657,893,800.00) |
| 15246 | Franklin | ST REGIS MOHAWK WATER SYSTEM / St. Regis Mohawk Tribe | Upgrade Water Treatment Plant, New Pump Station | 1500 | $3,897,950.00 | 95 | $661,791,750.00) |
| 16866 | Franklin | TUPPER LAKE V / Tupper Lake (V) | Upgrade Water Treatment Plant, Upgrade Transmission | 6000 | $596,295.00 | 90 | $662,388,045.00) |
| 16807 | Franklin | ALTAMONT (T) WD #17, LITTLE WOLF WD / Altamont (T) | New system to serve area with private contaminated wells, consolidate public water supply. , New Complete System (New System) | 250 | $540,000.00 | 85 | $662,928,045.00) |
| 16571 | Franklin | TOWN OF HARRIETSTOWN / Harrietstown (T) | Upgrade Distribution System | 5621 | $710,800.00 | 55 | $663,638,845.00) |
| 16957 | Franklin | CHATEAUGAY V / Chateaugay (V) | Upgrade Distribution System | 1100 | $2,300,000.00 | 55 | $665,938,845.00) |
| 15712 | Franklin | SARANAC LAKE V / Saranac Lake (V) | Upgrade Storage, Upgrade Pump Station | 5800 | $582,400.00 | 45 | $666,521,245.00) |
| 17226 | Franklin | (T) CHATEAUGAY WD#1 / Chateaugay (T) | New Water District | 100 | $114,075.00 | 45 | $666,635,320.00) |
| 16896 | Franklin | SARANAC LAKE V / Saranac Lake (V) | Upgrade Distribution System | 5800 | $180,250.00 | 45 | $666,815,570.00) |
| 17284 | Franklin | MALONE V / Malone (V) | New Transmission | 13000 | $498,963.00 | 40 | $667,314,533.00) |
| 17304 | Franklin | FORT COVINGTON WD / Fort Covington (T) | Upgrade Distribution System | 900 | $413,545.00 | 30 | $667,728,078.00) |
| 17184 | Franklin | BURKE V / Village of Burke | New Other Expenses, New Other (OT) | 273 | $250,000.00 | 20 | $667,978,078.00) |