| Project | County | System Name/ Borrower |
Description | Pop. | Project Cost |
Score | Cumulative Total |
|---|---|---|---|---|---|---|---|
| 17287 | Erie | FARNHAM VILLAGE / FARNHAM (V) | Phase 2 of DWSRF#16271., Upgrade Transmission, New Storage, Upgrade Distribution System | 404 | $250,000 | H | $250,000 |
| 15848 | Essex | MORIAH WD / MORIAH (T) | New Surface Water Treatment Rule Compliance Facility, New Transmission, New Storage | 3,100 | $1,918,975 | H | $2,168,975 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 15773 | Columbia | STOCKPORT WD #2 (CONSOLIDATED) / STOCKPORT (T) | New Surface Water Treatment Rule Compliance Facility, New Transmission, New Storage | 3,100 | $0 | H | $2,168,975 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 15655 | Sullivan | LIBERTY VILLAGE / LIBERTY (V) | Upgrade Water Treatment Plant, Upgrade Transmission, New Storage, New Pump Station, New System Consolidation | 4,800 | $0 | H | $2,168,975 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 15844 | Essex | KEENE WD / KEENE (T) | New Ground Water Source, New Transmission, New Storage, Upgrade Distribution System | 300 | $1,210,942 | H | $3,379,917 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 16979 | Chemung | VILLAGE OF VAN ETTEN / VAN ETTEN (V) | New system to serve area with private contaminated wells, consolidate public water supply, eliminate public water supply with past E. Coli detection. , New Complete System (New System) | 560 | $0 | H | $3,379,917 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 15701 | Greene | ATHENS VILLAGE / ATHENS (V) | Upgrade Water Treatment Plant | 1,850 | $0 | H | $3,379,917 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 16431 | Oneida | REMSEN VILLAGE / REMSEN (V) | New Surface Water Treatment Rule Compliance Facility | 650 | $0 | H | $3,379,917 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 17053 | Essex | UPPER JAY WD / JAY (T) | New Surface Water Treatment Rule Compliance Facility, Upgrade Transmission, Upgrade Storage, Upgrade Distribution System | 234 | $1,906,561 | H | $5,286,478 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 17069 | Essex | WILLSBORO WD / WILLSBORO (T) | Extend to serve Willsboro Bay WD for SWTR compliance., Upgrade Distribution System, New System Consolidation | 1,571 | $0 | H | $5,286,478 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 15525 | Albany | WESTERLO COMMUNITY WATER DISTRICT / WESTERLO (T) | New system to serve area with private contaminated wells, consolidate public water supply, eliminate public water supply with past E. Coli detection. , New Complete System (New System), System Consolidation | 280 | $443,415 | H | $5,729,893 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 16730 | Steuben | PULTENEY WATER SUPPLY SYSTEM / PULTENEY (T) | New system to serve private contaminated wells, consolidate public water supplies, eliminate public water supplies with surface water treatment rule violations., New Complete System (New System) | 235 | $0 | H | $5,729,893 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 17029 | Washington | VILLAGE OF SALEM WATER SYSTEM / SALEM (V) | New system to serve area with private contaminated wells, consolidate public water supply, eliminate public water supply with past E. Coli detection. , New Complete System (New System) | 920 | $0 | H | $5,729,893 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 16696 | Ulster | PINE HILL WATER COMPANY / SHANDAKEN (T) | Upgrade Water Treatment Plant, Upgrade Ground Water Source, Upgrade Storage, Upgrade Distribution System | 477 | $1,846,849 | H | $7,576,742 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 16748 | Tompkins | NEWFIELD WD / NEWFIELD (T) | Establish Water District No. 2, New Complete System (New System) | 1,100 | $0 | H | $7,576,742 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 16645 | Steuben | URBANA WATER DISTRICT / URBANA (T) | Extend to serve private contaminated wells, consolidate public water supplies, eliminate public water supply with past E. Coli detection., Extend Distribution System | 90 | $0 | H | $7,576,742 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 17040 | Cattaraugus | VERSAILLES WATER DISTRICT / PERRYSBURG (T) | New system to serve area with private contaminated wells, consolidate public water supply, eliminate public water supply with past E. Coli detection. , New Complete System (New System) | 145 | $0 | H | $7,576,742 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 15096 | Schoharie | MIDDLEBURGH VILLAGE / MIDDLEBURGH (V) | Upgrade Ground Water Source, Upgrade Storage, Upgrade Distribution System | 1,398 | $0 | H | $7,576,742 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 16716 | Jefferson | GLEN PARK UPPER UTILITIES (V) / GLEN PARK (V) | New system to serve area with private contaminated wells. , New Storage, Extend Distribution System | 50 | $0 | H | $7,576,742 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 16754 | Orange | NEWBURGH CITY / NEWBURGH (C) | Upgrade Water Treatment Plant, Upgrade Transmission | 28,000 | $0 | H | $7,576,742 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 16732 | Greene | VILLAGE OF HUNTER / HUNTER (V) | Consolidate public water supply, , New Surface Water Treatment Rule Compliance Facility | 429 | $0 | H | $7,576,742 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 15908 | Jefferson | TOWN OF BROWNVILLE WATER DISTRICT NO. 1 / BROWNVILLE (T) | Extend system to serve area with private contaminated wells, consolidate public water supply, eliminate public water supply with past E. Coli detection. , Extend Distribution System, System Consolidation | 150 | $0 | H | $7,576,742 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 16770 | St.Lawrence | WANAKENA WATER COMPANY / WANAKENA WATER COMPANY | Reconstruction of the Hamlet of Wanakena's existing water distribution system to eliminate E. Coli detections. , Upgrade Distribution System | 400 | $0 | H | $7,576,742 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 16910 | Jefferson | PIERREPONT MANOR WATER DISTRICT / ELLISBURG (T) | New system to serve area with private contaminated wells. , New Complete System (New System) | 250 | $0 | H | $7,576,742 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 16752 | Orange | KIRYAS JOEL VILLAGE / KIRYAS JOEL (V) | Water supply expansion and improvements (new wells and well fields). Consolidation with Police Barracks WS, New Ground Water Source, New System Consolidation | 16,442 | $3,306,300 | H | $10,883,042 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 16259 | Chemung | WELLSBURG VILLAGE / WELLSBURG (V) | New Transmission, New Pump Station, New Inter-Connection | 650 | $0 | H | $10,883,042 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 17201 | Jefferson | VILLAGE OF ELLISBURG / ELLISBURG (V) | Extend system to serve area with private contaminated wells, consolidate public water supply, eliminate public water supply with past total coliform detection. , Extend Distribution System, New System Consolidation | 269 | $0 | H | $10,883,042 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 15055 | Herkimer | LITTLE FALLS CITY / LITTLE FALLS (C) | New Surface Water Treatment Rule Compliance Facility | 5,800 | $0 | H | $10,883,042 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 17054 | Cayuga | SPRINGPORT WATER DISTRICT NO. 2 / SPRINGPORT (T) | Cayuga Lake Intercommunity Water Board - Towns of Springport and Fleming. Extend to serve private contaminated wells., New Storage, Extend Distribution System, New Inter-Connection | 1,500 | $0 | H | $10,883,042 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 15680 | Erie | TOWN OF COLDEN WATER DISTRICT #1 / COLDEN (T) | Extend to serve private contaminated wells, consolidate public water supplies, eliminate public water supply with past coliform detections., Extend Distribution System | 450 | $0 | H | $10,883,042 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 15574 | Steuben | COHOCTON VILLAGE / COHOCTON (V) | New Ground Water Source | 854 | $0 | H | $10,883,042 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 17022 | Jefferson | SACKETS HARBOR VILLAGE / SACKETS HARBOR (V) | Extension to serve area with private contaminated wells. , Extend Distribution System | 1,300 | $629,630 | H | $11,512,672 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 15147 | Schoharie | WARNERVILLE W.D. - (T)RICHMONDVILLE / RICHMONDVILLE (T) | New system to serve area with private contaminated wells, consolidate public water supply. , New Distribution System | 550 | $405,000 | H | $11,917,672 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 16907 | Sullivan | YOUNGSVILLE WD / CALLICOON (T) | New Ground Water Source, Upgrade Distribution System | 400 | $0 | H | $11,917,672 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 15284 | Saratoga | MECHANICVILLE CITY / MECHANICVILLE (C) | New Water Treatment Plant | 8,000 | $0 | H | $11,917,672 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 16889 | Oneida | KIRKLAND (T) ROUTE 5 WATER DISTRICT / KIRKLAND (T) | New system to serve area with private contaminated wells, consolidate public water supply. , New Complete System (New System) | 300 | $0 | H | $11,917,672 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 16057 | Steuben | HORNELL CITY / HORNELL (C) | New Storage, New Pump Station, Upgrade Distribution System | 9,019 | $0 | H | $11,917,672 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 17059 | Chautauqua | TOWN OF SHERIDAN ROUTE 5 WATERLINE / SHERIDAN (T) | Extend to serve private contaminated wells, consolidate public water supplies., Extend Distribution System | 280 | $0 | H | $11,917,672 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 17056 | Allegany | ANDOVER VILLAGE PUBLIC WATER / ANDOVER (V) | Upgrade Storage, Upgrade Distribution System | 1,130 | $0 | H | $11,917,672 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 15576 | Steuben | COHOCTON VILLAGE / COHOCTON (V) | Water System Pressure Deficiency Remediation: replace 4" mains & loop dead end connections, install additional valves., Upgrade Distribution System | 854 | $0 | H | $11,917,672 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 16818 | Chautauqua | HANOVER WATER DISTRICT #1 / HANOVER (T) | New Storage, Upgrade Distribution System | 2,173 | $0 | H | $11,917,672 |
| Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
| 16044 | Essex | ELIZABETHTOWN WD / ELIZABETHTOWN (T) | New Ground Water Source, New Storage, Upgrade Distribution System | 800 | $6,158,500 | H | $18,076,172 |
| 17281 | Yates | HIMROD/PLUM POINT WATER DISTRICT / MILO (T) | Extend Distribution System, System Consolidation | 750 | $2,850,000 | H | $20,926,172 |
| 15873 | Essex | WESTPORT WD / WESTPORT (T) | New Ground Water Source, Upgrade Distribution System | 800 | $6,460,838 | H | $27,387,010 |
| 17085 | Franklin | MALONE V / MALONE (V) | New Surface Water Treatment Rule Compliance Facility, New Storage | 13,000 | $4,655,600 | H | $32,042,610 |
| 17202 | Jefferson | BELLVILLE WD#2 / ELLISBURG (T) | Consolidation of Belleville-Henderson Central School which has E-coli and Nitrate MCL violations., Extend Distribution System, New System Consolidation | 355 | $4,286,900 | H | $36,329,510 |
| 17272 | Delaware | TOWN OF DAVENPORT WD / DAVENPORT (T) | Acquisition and improvement of private water company by (T) Davenport. New wells to replace GWUDI springs, New Ground Water Source, New Storage, New Water District | 104 | $823,000 | H | $37,152,510 |
| 15057 | Jefferson | ANTWERP VILLAGE / ANTWERP (V) | Upgrade Water Treatment Plant, Upgrade Ground Water Source, Upgrade Transmission, Upgrade Pump Station | 900 | $3,652,800 | H | $40,805,310 |
| 15839 | Essex | LEWIS WD / LEWIS (T) | New Ground Water Source, Upgrade Distribution System | 428 | $1,330,013 | H | $42,135,323 |
| 15813 | Hamilton | RAQUETTE LAKE WD / LONG LAKE (T) | New Surface Water Treatment Rule Compliance Facility, New Storage, Upgrade Distribution System | 85 | $717,551 | H | $42,852,874 |
| 16010 | Oswego | RICHLAND (T) W.D. NO. 1 / RICHLAND (T) | New (T) Richland Water District #1 and consolidation of Brennan Beach Campground, New Complete System (New System), Extend Distribution System | 250 | $7,015,000 | H | $49,867,874 |
| 17045 | Jefferson | REDWOOD WATER DISTRICT / ALEXANDRIA (T) | New system to serve area with private contaminated wells, consolidate public water supply. , New Complete System (New System) | 500 | $7,235,436 | H | $57,103,310 |
| 15980 | Saratoga | TOWN OF MOREAU / MOREAU (T) | Extension to serve properties in WD #5 & WD #6, and consolidate several exisitng public water systems, New Storage, Extend Distribution System, New System Consolidation | 2,100 | $5,400,000 | H | $62,503,310 |
| 16744 | Delaware | FLEISCHMANNS VILLAGE / FLEISCHMANNS (V) | New Ground Water Source, New Storage, Upgrade Distribution System | 625 | $3,000,000 | H | $65,503,310 |
| 17333 | Steuben | SPAULDING DR/LAKE SALUBRIA WATER DISTR. / BATH (T) | Consolidation of 18 public water systems, eliminate PWS with organic exceedance., Extend Distribution System, Upgrade Distribution System, System Consolidation | 1,195 | $5,460,087 | H | $70,963,397 |
| 16278 | Hamilton | LONG LAKE WD / LONG LAKE (T) | New Ground Water Source, New Storage, Upgrade Distribution System | 800 | $1,929,190 | H | $72,892,587 |
| 17094 | Oswego | SCRIBA WD (OSWEGO) / SCRIBA (T) | New system to serve area with private contaminated wells, consolidate public water supply, eliminate public water supply with past E. Coli detection. , New Distribution System, New System Consolidation | 3,700 | $6,332,000 | H | $79,224,587 |
| 15590 | Steuben | VILLAGE OF SAVONA / SAVONA (V) | New system to serve area with private contaminated wells, consolidate public water supplies, eliminate public water supplies with past total coliform and nitrate detection., New Complete System (New System), System Consolidation | 974 | $5,060,946 | H | $84,285,533 |
| 17103 | Jefferson | MANNSVILLE VILLAGE / MANNSVILLE (V) | New Surface Water Treatment Rule Compliance Facility, New Storage, New Distribution System | 500 | $2,657,000 | H | $86,942,533 |
| 15562 | Oneida | FORESTPORT / FORESTPORT (T) | New Ground Water Source, Upgrade Distribution System | 850 | $2,670,000 | H | $89,612,533 |
| 17052 | Essex | WILMINGTON WD / WILMINGTON (T) | Upgrade Transmission, New Storage, Upgrade Distribution System | 980 | $6,147,290 | H | $95,759,823 |
| 15237 | Chenango | SHERBURNE VILLAGE / SHERBURNE (V) | New Ground Water Source, New Transmission, Upgrade Storage, Upgrade Distribution System | 1,531 | $3,967,000 | H | $99,726,823 |
| 15085 | Saratoga | SCHUYLERVILLE-VICTORY JWC / SCHUYLERVILLE (V) | New Surface Water Treatment Rule Compliance Facility, New Ground Water Source, Upgrade Distribution System | 1,900 | $3,300,000 | H | $103,026,823 |
| 17175 | Columbia | TOWN OF CLAVERACK WD #1 / CLAVERACK (T) | New system to serve users previously on (C) Hudson raw water main, New Surface Water Treatment Rule Compliance Facility, New Complete System (New System), New Inter-Connection, New System Consolidation | 1,200 | $4,492,000 | H | $107,518,823 |
| 17331 | Rensselaer | TOWN OF POESTENKILL WD #1 / POESTENKILL (T) | New Complete System (New System), New System Consolidation | 2,300 | $5,382,102 | H | $112,900,925 |
| 17195 | Essex | KEENE VALLEY WD / KEENE (T) | New Ground Water Source, New Storage, Upgrade Distribution System | 450 | $4,701,374 | H | $117,602,299 |
| 16991 | Chenango | OXFORD WATER DISTRICT #1 / OXFORD (T) | 50 | $122,500 | H | $117,724,799 | |
| 16953 | Lewis | CONSOLIDATED W D#1 (T) LOWVVILLE / LOWVILLE (T) | Upgrade Storage, Upgrade Distribution System, Extend Distribution System, New System Consolidation | 280 | $766,400 | H | $118,491,199 |
| 15586 | Cortland | MARATHON VILLAGE / MARATHON (V) | New Ground Water Source, New Transmission, Upgrade Distribution System | 1,107 | $930,000 | H | $119,421,199 |
| 17105 | St.Lawrence | HAMLET OF HELENA / BRASHER (T) | New system to serve area with private contaminated wells, consolidate public water supply. , New Complete System (New System) | 150 | $1,447,000 | H | $120,868,199 |
| 16106 | Greene | TANNERSVILLE VILLAGE / TANNERSVILLE (V) | New Ground Water Source, Upgrade Transmission, Upgrade Distribution System | 448 | $869,200 | H | $121,737,399 |
| 17192 | Cattaraugus | CENTRAL WATER DISTRICT / PERRYSBURG (T) | Upgrade Water Treatment Plant, Upgrade Ground Water Source, New Transmission, Extend Distribution System | 400 | $2,480,000 | H | $124,217,399 |
| 16146 | Otsego | MILFORD VILLAGE / MILFORD (V) | New Ground Water Source, Upgrade Distribution System | 510 | $1,128,000 | H | $125,345,399 |
| 17144 | Chemung | TOWN OF CHEMUNG WATER SYSTEM / CHEMUNG (T) | New Complete System (New System) | 280 | $5,109,000 | H | $130,454,399 |
| 16530 | Oswego | PULASKI VILLAGE / PULASKI (V) | New Storage, New Pump Station | 2,398 | $1,268,651 | H | $131,723,050 |
| 17188 | Allegany | BELFAST WATER DISTRICT / BELFAST (T) | Upgrade Water Treatment Plant, New Ground Water Source | 750 | $1,250,000 | H | $132,973,050 |
| 17178 | Herkimer | MOHAWK VILLAGE / MOHAWK (V) | New Storage, Extend Distribution System, Upgrade Distribution System, New System Consolidation | 2,985 | $3,814,000 | H | $136,787,050 |
| 16510 | Schenectady | DELANSON VILLAGE WATER WORKS / DELANSON (V) | Improve inadequate system pressure, New Transmission, Upgrade Distribution System | 400 | $1,222,100 | H | $138,009,150 |
| 15829 | Essex | MINERVA WD / MINERVA (T) | New Ground Water Source, Upgrade Distribution System, New System Consolidation | 800 | $1,438,869 | H | $139,448,019 |
| 17163 | Essex | TICONDEROGA WD / TICONDEROGA (T) | New Transmission, New Storage | 5,000 | $8,883,467 | H | $148,331,486 |
| 16087 | Erie | TOWN OF NEWSTEAD / NEWSTEAD (T) | New Storage, Extend Distribution System, System Consolidation | 5,000 | $6,574,000 | H | $154,905,486 |
| 17099 | Oswego | VOLNEY AIRPORT WATER SYSTEM / VOLNEY (T) | New system to serve area with private contaminated wells, consolidate public water supply. , New Complete System (New System) | 921 | $3,330,000 | H | $158,235,486 |
| 17140 | St.Lawrence | LOUISVILLE WATER DISTRICT #2 / LOUISVILLE (T) | 1,000 | $5,968,000 | H | $164,203,486 | |
| 17088 | Oneida | HIGBY ROAD WATER DISTRICT / NEW HARTFORD (T) | New Storage, New Pump Station, Extend Distribution System | 700 | $3,982,000 | H | $168,185,486 |
| 17181 | Oswego | ROUTE 11 NORTH/FULLER RD. WD / HASTINGS (T) | New Storage, New Distribution System, New System Consolidation | 3,000 | $9,990,000 | H | $178,175,486 |
| 15684 | Greene | TOWN OF NEW BALTIMORE NEW SYSTEM / NEW BALTIMORE (T) | Extend system to serve area with private contaminated wells, consolidate public water supply. , Extend Distribution System, New System Consolidation | 1,300 | $5,000,000 | H | $183,175,486 |
| 16922 | Herkimer | GRAHM, NEWPORT & BROWN RD WD / SCHUYLER (T) | New system to serve area with private contaminated wells. , New Complete System (New System) | 260 | $2,200,000 | H | $185,375,486 |
| 16807 | Franklin | TUPPER LAKE (T) WD #17, LITTLE WOLF WD / TUPPER LAKE (T) | New system to serve area with private contaminated wells, consolidate public water supply. , New Complete System (New System) | 250 | $540,000 | H | $185,915,486 |
| 15760 | Allegany | ANGELICA VILLAGE PUBLIC WATER / ANGELICA (V) | Upgrade Surface Water Source, Upgrade Transmission, Upgrade Storage, Upgrade Distribution System | 950 | $1,179,000 | H | $187,094,486 |
| Total # Projects: 89 | Total Cost: $187,094,486 | ||||||