Final Intended Use Plan for the New York State Drinking Water State Revolving Fund
I. Project Readiness List
I.A. Project Readiness List Additions
| Project | County | System Name/ Borrower |
Description | Project Cost |
Score | Comments |
|---|---|---|---|---|---|---|
| 17423 | Greene | ANDES VILLAGE / | Phase 3 of project #15916., Upgrade Distribution System | $104,648 | 2,120 | Phase 3 of project# 15916 received after draft IUP printing. |
| 17376 | Ulster | KINGSTON (CITY) WATER DISTRICT / Kingston (C) | Phase 2 of Project #17231 (cost overrun), Upgrade Water Treatment Plant | $613,200 | 2,105 | Phase 2 of Project# 17231 received after draft IUP printing. |
| 17418 | Dutchess | POUGHKEEPSIE CITY/TOWN TREATMENT PLANT / Poughkeepsie(C)&(T) | Phase 3 of project 15654, Upgrade Water Treatment Plant | $1,200,000 | 2,100 | Phase 3 of project# 15654 received after draft IUP printing. |
| 17377 | Chautauqua | SILVER CREEK VILLAGE / Silver Creek (V) | Phase 2 of DWSRF# 15956., New Storage, Upgrade Distribution System | $100,000 | 2,090 | Phase 2 of project# 15956 received after draft IUP printing. |
| 16907 | Sullivan | YOUNGSVILLE WD / Callicoon (T) | New Ground Water Source, Upgrade Distribution System | $0 | 1,090 | Project closed with short term financing and was anticipated to close on a long term financing during previous IUP cycle and therefore was excluded from the draft IUP. Project did not close and therefore has been relisted. |
| 17390 | Franklin | NORTH BANGOR WS / Bangor (T) | Replace existing GWUDI source with new wells. Provide service for existing homes on contaminated wells., New Ground Water Source, New Storage, New Distribution System | $1,295,000 | 225 | New project with engineering report received after draft IUP printing. |
| 15953 | Allegany | SCIO WATER DISTRICT / Scio (T) | Upgrade existing treatment facility to include filtration for GWUDI springs, upgrade distribution system to correct inadequate distribution pressure violation., Upgrade Water Treatment Plant, Upgrade Ground Water Source, New Ground Water Source, Upgrade Distribution System | $1,463,280 | 190 | Engineering report received, project now ready. Previously on multi-year list only. Revised cost and score from 40 to 190 points based on new information. |
| 17367 | Steuben | TROUPSBURG WATER DISTRICT / Troupsburg (T) | New Surface Water Treatment Rule Compliance Facility, Upgrade Water Treatment Plant, Extend Distribution System | $246,500 | 185 | Engineering report received, project now ready. Previously only on multi-year list. |
| 17392 | Warren | PIONEER VILLAGE / Pioneer Village Imp. Assoc. | Serve private contaminated wells., New Surface Water Treatment Rule Compliance Facility, New Inter-Connection, New System Consolidation | $208,575 | 175 | New project with engineering report received after draft IUP printing. |
| 17385 | Onondaga | EAST SYRACUSE VILLAGE / East Syracuse (V) | Inter-connection to eliminate GWUDI source., New Transmission, New Inter-Connection | $535,600 | 145 | New project with engineering report received after draft IUP printing. |
| 17169 | Erie | ERIE COUNTY WATER AUTHORITY / Erie County Water Authority | Consolidation of the (C) Buffalo's system into ECWA,, New System Consolidation | $122,000,000 | 125 | Engineering report received, project now ready. Previously only on multi-year list. Revised cost based on new information. |
| 16093 | Tompkins | TRUMANSBURG VILLAGE / Trumansburg (V) | New Transmission, New Storage, New Pump Station | $2,501,000 | 115 | Engineering report received, project now ready. Previously only on multi year list. Revised cost based on new information. Revised score from 30 to 115 points based on new information. |
| 16169 | Greene | ASHLAND WD#1 / Ashland (T) | New Complete System (New System), New Inter-Connection | $2,873,620 | 105 | Engineering report received, project now ready. Previously only on multi-year list. Revised cost and revised project description based on new information. Revised score from 55 to 105 based on new information. |
| 17403 | Sullivan | WOODRIDGE VILLAGE / Woodridge (V) | New Ground Water Source | $450,000 | 100 | New project with engineering report received after draft IUP printing. |
| 17414 | Greene | CATSKILL VILLAGE / Catskill (V) | New Storage | $1,653,400 | 95 | New project with engineering report received after draft IUP printing. |
| 15288 | Dutchess | WAPPINGERS FALLS VILLAGE / Wappingers Falls (V) | New wells& Iron removal treatment., New Water Treatment Plant, Upgrade Ground Water Source | $2,559,700 | 90 | Engineering report received, project now ready. Previously only on multi-year list. Revised cost based on new information. |
| 17428 | Albany | FLAT ROCK ROAD W.D. / New Scotland (T) | $2,152,580 | 90 | New project with engineering report received after draft IUP printing. | |
| 17375 | St.Lawrence | (T) CANTON E. SIDE WD / Canton (T) | New Ground Water Source, New Storage, New Distribution System | $3,112,660 | 90 | New project with engineering report received after draft IUP printing. |
| 17422 | Herkimer | HERKIMER (T), WD #3, #4, #5 / Herkimer (T) | $299,112 | 85 | New project with engineering report received after draft IUP printing. | |
| 17413 | Orange | WALLKILL CONSOLIDATED WD / Wallkill (T) | Rykoski Lane Water Treatment Plant, Upgrade Water Treatment Plant, New Pump Station, New Pump Station | $5,500,000 | 75 | New project with engineering report received after draft IUP printing. |
| 17368 | Orange | GOSHEN VILLAGE / Goshen (V) | New Water Treatment Plant, New Ground Water Source, New Transmission | $5,311,500 | 70 | Engineering report received, project now ready. Previously only on multi-year list. |
| 17404 | Nassau | PLAINVIEW WD / Oyster Bay (T) | New air stripper at Plant 7, New Water Treatment Plant | $1,287,500 | 70 | New project with engineering report received after draft IUP printing. |
| 16144 | Orange | GOSHEN W.D. #1 (HAMBLETONIAN PARK) / Goshen (T) | New Ground Water Source, New Storage, Upgrade Distribution System | $2,605,900 | 65 | Engineering report received. Project now ready. Previously only on mulit-year list. Revised score from 50 to 65 points based on new information. |
| 17389 | Onondaga | EAST SYRACUSE VILLAGE / East Syracuse (V) | Replace lead service lines from the watermain to the property line to correct lead & copper exceedances., Upgrade Distribution System | $444,445 | 65 | New project with engineering report received after draft IUP printing. |
| 17427 | Albany | NEW SALEM WATER DISTRICT / New Scotland (T) | $5,240,756 | 60 | New project with engineering report received after draft IUP printing. | |
| 17393 | Monroe | MONROE COUNTY WATER AUTHORITY / Monroe County Water Authority | East Side Water Supply Project., New Water Treatment Plant, New Transmission, New Pump Station | $111,925,000 | 50 | New project with engineering report received after draft IUP printing. |
| 17378 | Ontario | GORHAM TOWN WD / Gorham (T) | Extension No. 9., Extend Distribution System | $732,000 | 50 | New project with engineering report received after draft IUP printing. |
| 17402 | Suffolk | WEST NECK WATER SUPPLY / Shelter Island (T) | New Well, New Ground Water Source | $2,000 | 45 | New project with engineering report received after draft IUP printing. |
| 17409 | Nassau | PLAINVIEW WD / Oyster Bay (T) | Air stripper at Plant 2, New Water Treatment Plant | $4,403,400 | 40 | New project with engineering report received after draft IUP printing. |
| 17397 | Erie | ERIE COUNTY WATER AUTHORITY / Erie County Water Authority | 36 inch transmission main on Sweet Home Road., New Transmission | $5,544,000 | 30 | New project with engineering report received after draft IUP printing. |
| 17380 | Cattaraugus | CATTARAUGUS VILLAGE / Cattaraugus (V) | Waverly Street., Upgrade Distribution System | $200,500 | 30 | New project with engineering report received after draft IUP printing. |
| 17400 | Orange | HIGHLAND FALLS VILLAGE / Highland Falls (V) | Water Treatment Plant Filter Upgrades, Upgrade Water Treatment Plant | $329,672 | 20 | New project with engineering report received after draft IUP printing. |
| 17383 | Genesee | OAKFIELD VILLAGE / Oakfield (T) | Upgrade Transmission | $1,661,600 | 20 | New project with engineering report received after draft IUP printing. |
| 17419 | Dutchess | WAPPINGERS FALLS VILLAGE / Wappinger Falls (V) | Upgrade Storage, New Storage, Upgrade Distribution System | $6,238,532 | 20 | New project with engineering report received after draft IUP printing. |
| Total # Projects: 34 | Total Cost: $294,795,680 | |||||