NYS Drinking Water State Revolving Fund
Multi-Year List for October 1, 2005 to September 30, 2006
Albany - Franklin
Project | County | System Name/ Borrower |
Description | Pop. | Project Cost |
Score | Cumulative Total |
---|---|---|---|---|---|---|---|
Albany | |||||||
15525 | Albany | WESTERLO COMMUNITY WATER DISTRICT / WESTERLO (T) | New system to serve area with private contaminated wells, consolidate public water supply, eliminate public water supply with past E. Coli detection. , New Complete System (New System), System Consolidation | 280 | $443,415 | 1,185 | $443,415 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
15661 | Albany | RENSSELAERVILLE WD / RENSSELAERVILLE (T) | New Ground Water Source, Upgrade Storage, Upgrade Distribution System | 200 | $990,242 | 185 | $1,433,657 |
17428 | Albany | FLAT ROCK ROAD W.D. / NEW SCOTLAND (T) | 149 | $2,152,580 | 90 | $3,586,237 | |
15950 | Albany | GUILDERLAND TOWN WD / GUILDERLAND (T) | Phase III Improvements, New Storage, Extend Distribution System, Upgrade Distribution System, New Inter-Connection | 25,100 | $10,146,000 | 75 | $13,732,237 |
17443 | Albany | ALTAMONT VILLAGE / ALTAMONT (V) | Develop New Groundwater Source, Disinfection, and Transmission Main, New Ground Water Source | 2,000 | $1,394,550 | 70 | $15,126,787 |
16670 | Albany | ALTAMONT RD. WATER DISTRICT / NEW SCOTLAND (T) | Extension of Village of Voorheesville system into the Town of New Scotland, New Distribution System | 93 | $314,000 | 70 | $15,440,787 |
17427 | Albany | NEW SALEM WATER DISTRICT / NEW SCOTLAND (T) | 486 | $5,240,756 | 60 | $20,681,543 | |
17299 | Albany | RAVENA VILLAGE / RAVENA (V) | Upgrade Water Treatment Plant, Upgrade Transmission, Upgrade Storage | 4,500 | $3,090,000 | 50 | $23,771,543 |
16245 | Albany | COHOES CITY / COHOES (C) | Upgrade Distribution System | 15,550 | $1,909,700 | 50 | $25,681,243 |
15705 | Albany | ALBANY CITY / ALBANY (C) | Pearl Street Reconstruction, Phase 1, Upgrade Distribution System | 101,082 | $2,000,000 | 50 | $27,681,243 |
16449 | Albany | GREEN ISLAND VILLAGE / GREEN ISLAND (V) | Extend Distribution System | 3,800 | $381,100 | 50 | $28,062,343 |
15698 | Albany | ALBANY CITY / ALBANY (C) | 1997 Capital Improvement Program, Upgrade Distribution System | 101,082 | $1,350,000 | 45 | $29,412,343 |
15747 | Albany | ALBANY CITY / ALBANY (C) | New Transmission | 101,082 | $10,000,000 | 45 | $39,412,343 |
15417 | Albany | KRUMKILL RD. WATER DISTRICT / NEW SCOTLAND (T) | Extend Distribution System | 45 | $31,000 | 45 | $39,443,343 |
15395 | Albany | WATERVLIET CITY / WATERVLIET (C) | New Storage | 10,400 | $1,548,000 | 40 | $40,991,343 |
15720 | Albany | ALBANY CITY / ALBANY (C) | Upgrade Water Treatment Plant | 101,082 | $960,000 | 40 | $41,951,343 |
16244 | Albany | COHOES CITY / COHOES (C) | Upgrade Distribution System | 15,550 | $916,543 | 40 | $42,867,886 |
15129 | Albany | NORTHEAST WATER DISTRICT / NEW SCOTLAND (T) | New Complete System (New System) | 370 | $843,905 | 40 | $43,711,791 |
15300 | Albany | NORTHEAST WATER DISTRICT / NEW SCOTLAND (T) | Extend Distribution System | 45 | $267,000 | 40 | $43,978,791 |
15446 | Albany | NORMANSKILL RD, WORMER RD WATER SYS. / NEW SCOTLAND (T) | Extend Distribution System | 30 | $376,000 | 40 | $44,354,791 |
15397 | Albany | WATERVLIET CITY / WATERVLIET (C) | Upgrade Transmission | 10,400 | $208,500 | 35 | $44,563,291 |
15743 | Albany | ALBANY CITY / ALBANY (C) | Upgrade Distribution System | 101,082 | $6,000,000 | 35 | $50,563,291 |
15392 | Albany | WATERVLIET CITY / WATERVLIET (C) | Replace undersized lines - 1998, Upgrade Distribution System | 10,400 | $795,000 | 30 | $51,358,291 |
15393 | Albany | WATERVLIET CITY / WATERVLIET (C) | Replace undersized water mains provided insufficient flow & pressure-1997, Upgrade Distribution System | 10,400 | $317,700 | 30 | $51,675,991 |
17341 | Albany | SOUTH ALBANY WATER DISTRICT / BETHLEHEM (T) | 80 | $146,775 | 25 | $51,822,766 | |
15755 | Albany | RAVENA VILLAGE / RAVENA (V) | New Storage | 4,500 | $497,500 | 20 | $52,320,266 |
15247 | Albany | LATHAM WATER DISTRICT / COLONIE (T) | New Storage | 78,500 | $1,290,000 | 15 | $53,610,266 |
Allegany | |||||||
17188 | Allegany | BELFAST WATER DISTRICT / BELFAST (T) | Upgrade Water Treatment Plant, New Ground Water Source | 750 | $825,000 | 1,120 | $54,435,266 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
17056 | Allegany | ANDOVER VILLAGE PUBLIC WATER / ANDOVER (V) | Upgrade Storage, Upgrade Distribution System | 1,130 | $0 | 1,080 | $54,435,266 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
15953 | Allegany | SCIO WATER DISTRICT / SCIO (T) | Upgrade existing treatment facility to include filtration for GWUDI springs, upgrade distribution system to correct inadequate distribution pressure violation., Upgrade Water Treatment Plant, Upgrade Ground Water Source, New Ground Water Source, Upgrade Distribution System | 1,039 | $1,463,280 | 190 | $55,898,546 |
17382 | Allegany | HOUGHTON WATER DISTRICT / CANEADEA (T) | Upgrade Water Treatment Plant, New Ground Water Source, New Transmission, Upgrade Distribution System | 2,000 | $6,535,600 | 175 | $62,434,146 |
16746 | Allegany | CANASERAGA VILLAGE PUBLIC WATER / CANASERAGA (V) | New Ground Water Source | 900 | $1,058,451 | 155 | $63,492,597 |
15925 | Allegany | TOWN OF WELLSVILLE / WELLSVILLE (T) | Extend system to serve area with private contaminated wells, Morningside Area, Extend Distribution System | 5,000 | $867,106 | 75 | $64,359,703 |
15502 | Allegany | WELLSVILLE VILLAGE PUBLIC WATER / WELLSVILLE (V) | New Storage | 5,700 | $1,177,000 | 50 | $65,536,703 |
15547 | Allegany | FRIENDSHIP TOWN WATER DISTRICT / FRIENDSHIP (T) | Upgrade Ground Water Source, Upgrade Storage, Upgrade Distribution System | 1,380 | $1,030,000 | 45 | $66,566,703 |
16636 | Allegany | BOLIVAR VILLAGE PUBLIC WATER / BOLIVAR (V) | New Storage, Upgrade Distribution System | 1,040 | $788,500 | 45 | $67,355,203 |
15005 | Allegany | BELFAST WATER DISTRICT / BELFAST (T) | New Storage | 750 | $318,150 | 40 | $67,673,353 |
16655 | Allegany | GENESEE HEIGHTS MOBILE HOME PK / MR. & MRS. ANZIVINE | New Ground Water Source, Upgrade Distribution System | 65 | $69,000 | 40 | $67,742,353 |
15943 | Allegany | ANDOVER VILLAGE PUBLIC WATER / ANDOVER (V) | Upgrade Surface Water Source | 1,130 | $3,299,000 | 40 | $71,041,353 |
16747 | Allegany | CANASERAGA VILLAGE PUBLIC WATER / CANASERAGA (V) | Upgrade Distribution System | 900 | $2,039,915 | 35 | $73,081,268 |
16154 | Allegany | BELMONT VILLAGE PUBLIC WATER / BELMONT (V) | Trianna St. & Milton St., Upgrade Distribution System | 1,325 | $494,452 | 30 | $73,575,720 |
16156 | Allegany | BELMONT VILLAGE PUBLIC WATER / BELMONT (V) | Greenwich St. to Allegany County Office Complex., Upgrade Distribution System | 1,325 | $405,827 | 30 | $73,981,547 |
15983 | Allegany | ALMOND VILLAGE PUBLIC WATER / ALMOND (V) | Upgrade Distribution System | 600 | $257,500 | 25 | $74,239,047 |
Broome | |||||||
16262 | Broome | TOWN OF CONKLIN W.D. / CONKLIN (T) | Extend system to serve area with private contaminated wells, consolidate public water supply. , Inter-Connection, System Consolidation | 1,000 | $863,140 | 90 | $75,102,187 |
16175 | Broome | CONKLIN WD #1 / CONKLIN (T) | Upgrade Ground Water Source | 101 | $343,200 | 65 | $75,445,387 |
16025 | Broome | PARK TERRACE WATER SYSTEM / BINGHAMTON (T) | Extend system to serve area with private contaminated wells. , Extend Distribution System | 455 | $1,101,456 | 55 | $76,546,843 |
16804 | Broome | STILLWATER RD WD#6 / CONKLIN (T) | Extend Distribution System | 173 | $412,782 | 55 | $76,959,625 |
17453 | Broome | LILIAN DRIVE WD / BINGHAMTON (T) | 120 | $281,000 | 45 | $77,240,625 | |
16541 | Broome | UNION TOWN WATER SYSTEM NO. 1 / UNION (T) | Extend Distribution System | 5,000 | $6,400,225 | 45 | $83,640,850 |
16801 | Broome | CHENANGO WD #8 / CHENANGO (T) | New Water District | 100 | $121,000 | 45 | $83,761,850 |
16802 | Broome | CHENANGO WD #4 / CHENANGO (T) | New Water District | 100 | $112,450 | 45 | $83,874,300 |
15969 | Broome | VESTAL CONSOLIDATED W.D. #1 / VESTAL (T) | New Water Treatment Plant | 20,950 | $863,720 | 40 | $84,738,020 |
16799 | Broome | CHENANGO WD #25 / CHENANGO (T) | New WD to serve private insufficient yielding wells area of Poplar Hill Road , New Complete System (New System) | 100 | $383,500 | 40 | $85,121,520 |
15215 | Broome | DICKINSON WD #2 / DICKINSON (T) | Upgrade Pump Station, Upgrade Distribution System | 56 | $220,100 | 35 | $85,341,620 |
15489 | Broome | BINGHAMTON, CITY OF / BINGHAMTON (C) | South Side Water Storage Reservoir replacement,Hotchkins St., Upgrade Storage | 47,600 | $1,236,000 | 35 | $86,577,620 |
15764 | Broome | WINDSOR, VILLAGE OF / WINDSOR (V) | Upgrade Pump Station, Upgrade Distribution System | 1,051 | $1,660,000 | 30 | $88,237,620 |
15973 | Broome | VESTAL CONSOLIDATED W.D. #1 / VESTAL (T) | Upgrade Pump Station, Upgrade Distribution System | 20,950 | $319,815 | 10 | $88,557,435 |
15975 | Broome | VESTAL CONSOLIDATED W.D. #1 / VESTAL (T) | Upgrade Pump Station | 20,950 | $187,718 | 10 | $88,745,153 |
15977 | Broome | VESTAL CONSOLIDATED W.D. #1 / VESTAL (T) | New Storage | 20,950 | $1,668,600 | 10 | $90,413,753 |
15905 | Broome | CHENANGO CONSOLIDATED WD #1 / CHENANGO (T) | Upgrade Ground Water Source | 9,200 | $574,500 | 10 | $90,988,253 |
15971 | Broome | VESTAL CONSOLIDATED W.D. #1 / VESTAL (T) | Upgrade Water Treatment Plant | 20,950 | $415,296 | 5 | $91,403,549 |
Cattaraugus | |||||||
17051 | Cattaraugus | MACHIAS TOWN WATER DISTRICT / MACHIAS (T) | Phase 2 of DWRSF #15485., Upgrade Water Treatment Plant, New Ground Water Source, Upgrade Storage, Upgrade Distribution System | 700 | $150,000 | 2,145 | $91,553,549 |
17040 | Cattaraugus | VERSAILLES WATER DISTRICT / PERRYSBURG (T) | New system to serve area with private contaminated wells, consolidate public water supply, eliminate public water supply with past E. Coli detection. , New Complete System (New System) | 145 | $0 | 1,175 | $91,553,549 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
17192 | Cattaraugus | CENTRAL WATER DISTRICT / PERRYSBURG (T) | Upgrade Water Treatment Plant, Upgrade Ground Water Source, New Transmission, Extend Distribution System | 400 | $3,000,000 | 135 | $94,553,549 |
16649 | Cattaraugus | SOUTH DAYTON VILLAGE / SOUTH DAYTON (V) | New Water Treatment Plant, New Storage, Upgrade Distribution System | 661 | $300,000 | 105 | $94,853,549 |
17332 | Cattaraugus | PROSPECT STREET WATER DISTRICT / PERRYSBURG (T) | Extend Distribution System, Upgrade Distribution System, System Consolidation | 83 | $309,000 | 90 | $95,162,549 |
16061 | Cattaraugus | GROVE STREET WATER SUPPLY / YORKSHIRE (T) | Extend system to serve area with private contaminated wells. , Extend Distribution System | 70 | $57,100 | 65 | $95,219,649 |
15756 | Cattaraugus | LIMESTONE VILLAGE / LIMESTONE (V) | New Ground Water Source, New Storage, Upgrade Distribution System | 459 | $1,200,000 | 55 | $96,419,649 |
15017 | Cattaraugus | SALAMANCA CITY / SALAMANCA (C) | Upgrade Ground Water Source | 7,000 | $850,000 | 50 | $97,269,649 |
16247 | Cattaraugus | SALAMANCA CITY / SALAMANCA (C) | Upgrade Storage | 7,000 | $1,510,000 | 50 | $98,779,649 |
15763 | Cattaraugus | PORTVILLE VILLAGE / PORTVILLE (V) | Upgrade Distribution System | 1,136 | $437,673 | 35 | $99,217,322 |
15544 | Cattaraugus | PERRYSBURG (V) / PERRYSBURG (V) | New Transmission, Upgrade Distribution System | 404 | $330,000 | 30 | $99,547,322 |
17380 | Cattaraugus | CATTARAUGUS VILLAGE / CATTARAUGUS (V) | Waverly Street., Upgrade Distribution System | 1,100 | $200,500 | 30 | $99,747,822 |
16563 | Cattaraugus | EAST RANDOLPH VILLAGE / EAST RANDOLPH (V) | Upgrade Transmission | 695 | $283,141 | 25 | $100,030,963 |
Cayuga | |||||||
17054 | Cayuga | SPRINGPORT WATER DISTRICT NO. 2 / SPRINGPORT (T) | Cayuga Lake Intercommunity Water Board - Towns of Springport and Fleming. Extend to serve private contaminated wells., New Storage, Extend Distribution System, New Inter-Connection | 1,500 | $0 | 1,120 | $100,030,963 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
15780 | Cayuga | AURORA VILLAGE / AURORA (V) | New Water Treatment Plant, New Surface Water Source | 526 | $862,457 | 110 | $100,893,420 |
15970 | Cayuga | LOCKE W D / LOCKE (T) | Upgrade Ground Water Source, Upgrade Distribution System | 600 | $500,650 | 80 | $101,394,070 |
15127 | Cayuga | FAIR HAVEN VILLAGE / FAIR HAVEN (V) | Upgrade Ground Water Source, New Storage, Upgrade Distribution System | 1,000 | $934,500 | 80 | $102,328,570 |
16337 | Cayuga | MONTEZUMA W D #1 / MONTEZUMA (T) | Upgrade Distribution System, New Distribution System | 490 | $3,801,215 | 80 | $106,129,785 |
15751 | Cayuga | GENOA-KING FERRY WD / GENOA (T) | Upgrade Water Treatment Plant, Upgrade Storage, Upgrade Distribution System | 800 | $1,040,000 | 75 | $107,169,785 |
16114 | Cayuga | CAYUGA VILLAGE / CAYUGA (V) | Upgrade Water Treatment Plant, Upgrade Surface Water Source, Upgrade Distribution System | 600 | $770,000 | 70 | $107,939,785 |
16762 | Cayuga | UNION SPRINGS VILLAGE / UNION SPRINGS (V) | New Water Treatment Plant | 2,000 | $165,000 | 65 | $108,104,785 |
16161 | Cayuga | PORT BYRON VILLAGE / PORT BYRON (V) | Upgrade Transmission | 1,400 | $1,425,000 | 65 | $109,529,785 |
17091 | Cayuga | BRUTUS WATER DISTRICT NO. 2 / BRUTUS (T) | 1,500 | $3,104,615 | 65 | $112,634,400 | |
17439 | Cayuga | FLEMING WD #1 / FLEMING (T) | Upgrade Storage, Upgrade Pump Station | 1,800 | $517,200 | 60 | $113,151,600 |
16163 | Cayuga | THROOP WD NO1 / THROOP (T) | Extend Distribution System, Upgrade Distribution System | 400 | $1,960,142 | 60 | $115,111,742 |
17220 | Cayuga | TOWN OF VICTORY WD #2 / VICTORY (T) | Extend Distribution System | 612 | $3,389,601 | 55 | $118,501,343 |
17315 | Cayuga | TOWN OF MORAVIA WATER DISTRICT NO. 1 / MORAVIA (T) | New Pump Station, Extend Distribution System | 162 | $663,320 | 55 | $119,164,663 |
15018 | Cayuga | FLEMING WD #1 / FLEMING (T) | New Storage, Upgrade Distribution System, Inter-Connection | 1,800 | $1,442,000 | 50 | $120,606,663 |
15026 | Cayuga | AUBURN / AUBURN (C) | Upgrade Transmission, Upgrade Pump Station | 29,788 | $321,875 | 50 | $120,928,538 |
15904 | Cayuga | AURELIUS WD NO 1 / AURELIUS (T) | Extend Distribution System | 440 | $2,142,690 | 50 | $123,071,228 |
17223 | Cayuga | WEST GENESEE STREET WATER DISTRICT / AURELIUS (T) | Extend Distribution System | 175 | $1,198,000 | 50 | $124,269,228 |
15050 | Cayuga | AUBURN / AUBURN (C) | Upgrade Surface Water Source | 29,788 | $647,510 | 45 | $124,916,738 |
16759 | Cayuga | CAYUGA COUNTY WATER & SEWER AUTHORITY / CAYUGA CO. WATER & SEWER AUTH. | New Water Treatment Plant, New Storage, New Distribution System | 5,900 | $25,632,730 | 45 | $150,549,468 |
15043 | Cayuga | AUBURN / AUBURN (C) | Reservoir relining and leak repair., Upgrade Storage | 29,788 | $902,795 | 45 | $151,452,263 |
15546 | Cayuga | AUBURN / AUBURN (C) | Upgrade Distribution System | 29,788 | $1,098,495 | 40 | $152,550,758 |
17329 | Cayuga | OWASCO WATER DISTRICT / OWASCO (T) | Upgrade Water Treatment Plant, New Storage, Upgrade Distribution System | 3,000 | $6,180,000 | 30 | $158,730,758 |
15949 | Cayuga | MORAVIA VILLAGE / MORAVIA (V) | Upgrade Distribution System | 1,600 | $789,600 | 30 | $159,520,358 |
15634 | Cayuga | SENNETT WD #1 / SENNETT (T) | Upgrade Distribution System | 200 | $470,339 | 25 | $159,990,697 |
15631 | Cayuga | SENNETT WD #3 / SENNETT (T) | Upgrade Distribution System | 400 | $307,760 | 20 | $160,298,457 |
Chautauqua | |||||||
17217 | Chautauqua | TOWN OF PORTLAND WATER DISTRICT NO. 5 / PORTLAND (T) | Phase II of DWSRF #16775 - extend to serve private contaminated wells, consolidate public water supplies, eliminate public water supply with past turbidity violations., Extend Distribution System | 183 | $514,400 | 2,155 | $160,812,857 |
17377 | Chautauqua | SILVER CREEK VILLAGE / SILVER CREEK (V) | Phase 2 of DWSRF# 15956., New Storage, Upgrade Distribution System | 3,100 | $100,000 | 2,090 | $160,912,857 |
17059 | Chautauqua | TOWN OF SHERIDAN ROUTE 5 WATERLINE / SHERIDAN (T) | Extend to serve private contaminated wells, consolidate public water supplies., Extend Distribution System | 280 | $0 | 1,085 | $160,912,857 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
16818 | Chautauqua | HANOVER WATER DISTRICT #1 / HANOVER (T) | New Storage, Upgrade Distribution System | 2,173 | $0 | 1,055 | $160,912,857 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
17481 | Chautauqua | CHERRY CREEK VILLAGE / CHERRY CREEK (V) | New well to replace GUDI springs., New Ground Water Source | 650 | $392,275 | 125 | $161,305,132 |
15189 | Chautauqua | BROCTON VILLAGE / BROCTON (V) | Upgrade Water Treatment Plant | 4,000 | $4,556,326 | 105 | $165,861,458 |
15787 | Chautauqua | CLYMER WATER DISTRICT / CLYMER (T) | New Ground Water Source | 650 | $300,000 | 100 | $166,161,458 |
17279 | Chautauqua | SHOREHAVEN WATER DISTRICT / WESTFIELD (T) | Extend Distribution System, System Consolidation | 120 | $206,000 | 100 | $166,367,458 |
16613 | Chautauqua | MAYVILLE VILLAGE / MAYVILLE (V) | Upgrade Ground Water Source, Upgrade Transmission, Upgrade Storage, Upgrade Distribution System | 1,630 | $977,780 | 90 | $167,345,238 |
17432 | Chautauqua | CASSADAGA VILLAGE / CASSADAGA (V) | New Ground Water Source, New Storage, Upgrade Distribution System | 760 | $4,424,880 | 85 | $171,770,118 |
15236 | Chautauqua | SHERMAN VILLAGE / SHERMAN (V) | Address total Coli violations., Upgrade Distribution System | 917 | $795,000 | 80 | $172,565,118 |
16012 | Chautauqua | WESTFIELD VILLAGE / WESTFIELD (V) | East Main St., Upgrade Distribution System | 3,450 | $597,423 | 70 | $173,162,541 |
15617 | Chautauqua | HANOVER WATER DISTRICT #1 / HANOVER (T) | Extension #4., Extend Distribution System | 2,173 | $666,300 | 70 | $173,828,841 |
17218 | Chautauqua | FREDONIA VILLAGE / FREDONIA (V) | Upgrade Water Treatment Plant | 10,400 | $1,287,500 | 65 | $175,116,341 |
17482 | Chautauqua | WESTFIELD VILLAGE / WESTFIELD (T) | 3,450 | $506,700 | 65 | $175,623,041 | |
16406 | Chautauqua | FORESTVILLE VILLAGE / FORESTVILLE (V) | Upgrade Distribution System | 804 | $200,000 | 60 | $175,823,041 |
15021 | Chautauqua | DUNKIRK CITY / DUNKIRK (C) | Extension to (T) of Sheridan and (V) of Silver Creek., New Transmission, System Consolidation | 15,310 | $3,530,000 | 60 | $179,353,041 |
15124 | Chautauqua | DUNKIRK CITY / DUNKIRK (C) | Extension to (T) of Portland and (V) of Brocton., New Transmission, New Pump Station, System Consolidation | 15,310 | $2,915,000 | 60 | $182,268,041 |
16014 | Chautauqua | WESTFIELD VILLAGE / WESTFIELD (T) | New Distribution System | 3,450 | $520,300 | 60 | $182,788,341 |
16188 | Chautauqua | WESTFIELD VILLAGE / WESTFIELD (V) | Upgrade Water Treatment Plant | 3,450 | $1,787,416 | 50 | $184,575,757 |
16559 | Chautauqua | HANOVER WATER DISTRICT #1 / HANOVER (T) | Extend Distribution System | 2,173 | $1,287,500 | 50 | $185,863,257 |
16908 | Chautauqua | TOWN OF BUSTI WATER DISTRICT #3 / BUSTI (T) | Extend Distribution System | 450 | $750,000 | 50 | $186,613,257 |
15724 | Chautauqua | LAKEWOOD VILLAGE / LAKEWOOD (V) | New Transmission, New Pump Station, Inter-Connection | 5,100 | $870,000 | 45 | $187,483,257 |
15022 | Chautauqua | DUNKIRK CITY / DUNKIRK (C) | Upgrade Water Treatment Plant, Upgrade Distribution System | 15,310 | $2,726,000 | 40 | $190,209,257 |
16296 | Chautauqua | SINCLAIRVILLE VILLAGE / SINCLAIRVILLE (V) | Upgrade Ground Water Source, Upgrade Pump Station | 772 | $50,000 | 40 | $190,259,257 |
16183 | Chautauqua | WESTFIELD VILLAGE / WESTFIELD (V) | E. Main Street and Cass Street., Upgrade Distribution System | 3,450 | $257,206 | 35 | $190,516,463 |
16184 | Chautauqua | WESTFIELD VILLAGE / WESTFIELD (V) | Oak St., Upgrade Distribution System | 3,450 | $90,305 | 35 | $190,606,768 |
16022 | Chautauqua | FREDONIA VILLAGE / FREDONIA (V) | New Transmission, Upgrade Distribution System, System Consolidation | 10,400 | $716,800 | 35 | $191,323,568 |
16024 | Chautauqua | FREDONIA VILLAGE / FREDONIA (V) | New Transmission, New Storage | 10,400 | $779,200 | 30 | $192,102,768 |
16181 | Chautauqua | WESTFIELD VILLAGE / WESTFIELD (V) | Clean & reconstruct waterlines., Upgrade Distribution System | 3,450 | $600,000 | 30 | $192,702,768 |
16665 | Chautauqua | WESTFIELD VILLAGE / WESTFIELD (V) | Upgrade Distribution System | 3,450 | $54,167 | 30 | $192,756,935 |
17483 | Chautauqua | RIPLEY WATER DISTRICT / RIPLEY (T) | 1,300 | $609,760 | 30 | $193,366,695 | |
16294 | Chautauqua | SINCLAIRVILLE VILLAGE / SINCLAIRVILLE (V) | Upgrade Distribution System | 772 | $45,000 | 30 | $193,411,695 |
17484 | Chautauqua | WD#1 / CARROLL (T) | 2,900 | $695,250 | 25 | $194,106,945 | |
16609 | Chautauqua | HANOVER WATER DISTRICT #1 / HANOVER (T) | Upgrade Distribution System | 2,173 | $307,200 | 20 | $194,414,145 |
15725 | Chautauqua | LAKEWOOD VILLAGE / LAKEWOOD (V) | New Storage | 5,100 | $559,600 | 15 | $194,973,745 |
Chemung | |||||||
16979 | Chemung | VILLAGE OF VAN ETTEN / VAN ETTEN (V) | New system to serve area with private contaminated wells, consolidate public water supply, eliminate public water supply with past E. Coli detection. , New Complete System (New System) | 560 | $0 | 1,195 | $194,973,745 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
16259 | Chemung | WELLSBURG VILLAGE / WELLSBURG (V) | New Transmission, New Pump Station, New Inter-Connection | 650 | $0 | 1,150 | $194,973,745 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
17144 | Chemung | TOWN OF CHEMUNG WATER SYSTEM / CHEMUNG (T) | New Complete System (New System) | 280 | $5,651,000 | 125 | $200,624,745 |
16576 | Chemung | WESTOVER HILLS MHC / LEADING EDGE PROPERTIES | water softener system and, Upgrade Distribution System | 400 | $93,113 | 60 | $200,717,858 |
16560 | Chemung | ELMIRA WATER BOARD / ELMIRA WATER BOARD | Upgrade Distribution System | 70,000 | $1,545,000 | 45 | $202,262,858 |
16260 | Chemung | MILLPORT VILLAGE WATER SUPPLY / MILLPORT (V) | Upgrade Ground Water Source | 440 | $125,000 | 40 | $202,387,858 |
16577 | Chemung | BELLAIR MOBILE HOME PARK / ELMIRA LLC | Upgrade Distribution System | 225 | $131,250 | 35 | $202,519,108 |
16723 | Chemung | WELLSBURG VILLAGE / WELLSBURG (V) | Upgrade Distribution System | 650 | $644,700 | 35 | $203,163,808 |
16427 | Chemung | ROLLING ACRES MOBILE HOME PARK / ASHFORD MANAGEMENT GROUP, INC. | Upgrade Distribution System | 93 | $139,000 | 10 | $203,302,808 |
Chenango | |||||||
15237 | Chenango | SHERBURNE VILLAGE / SHERBURNE (V) | New Ground Water Source, New Transmission, Upgrade Storage, Upgrade Distribution System | 1,531 | $1,483,000 | 1,185 | $204,785,808 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
16991 | Chenango | OXFORD WATER DISTRICT #1 / OXFORD (T) | 50 | $122,500 | 160 | $204,908,308 | |
16912 | Chenango | TOWN OF NO. NORWICH WD #1 / NORTH NORWICH (T) | New system to serve area with private contaminated wells, consolidate public water supply, eliminate public water supply with past total coliform detection. , New Distribution System | 100 | $920,300 | 130 | $205,828,608 |
17425 | Chenango | SO. NEW BERLIN WATER DISTRICT / NEW BERLIN (T) | 400 | $754,900 | 85 | $206,583,508 | |
16687 | Chenango | NORWICH TOWN WATER DISTRICT #2 / NORWICH (T) | Extend Distribution System | 200 | $390,885 | 45 | $206,974,393 |
15944 | Chenango | OXFORD VILLAGE / OXFORD (V) | New Ground Water Source, Upgrade Distribution System | 1,738 | $154,039 | 40 | $207,128,432 |
Clinton | |||||||
15569 | Clinton | TOWN OF ELLENBURG / ELLENBURG (T) | Extend Distribution System | 1,000 | $3,339,464 | 200 | $210,467,896 |
17148 | Clinton | ROUTE 9/SPELLMAN ROAD / BEEKMANTOWN (T) | New Distribution System, New System Consolidation | 500 | $603,630 | 135 | $211,071,526 |
16249 | Clinton | COBBLESTONE COVE / PRAY'S BEACH & MOTEL | New ground water source and storage for SWTR compliance., New Ground Water Source | 75 | $104,497 | 125 | $211,176,023 |
15337 | Clinton | MORRISONVILLE WATER DISTRICT / SCHUYLER FALLS (T) | New Ground Water Source, New Distribution System | 1,300 | $3,587,392 | 120 | $214,763,415 |
17356 | Clinton | ARCHIE BORDEAU WD / PLATTSBURGH (T) | Extend Distribution System, New System Consolidation | 260 | $876,000 | 100 | $215,639,415 |
17179 | Clinton | SOUTH PLATTSBURGH WATER DISTRICT / PLATTSBURGH (T) | New Pump Station, New Distribution System, New System Consolidation | 2,000 | $4,575,000 | 90 | $220,214,415 |
16498 | Clinton | TOWN OF CHAMPLAIN / CHAMPLAIN (T) | Develop Source for Town Districts (4), New Ground Water Source, Upgrade Transmission, Upgrade Storage, Upgrade Distribution System | 1,350 | $2,131,740 | 85 | $222,346,155 |
17323 | Clinton | PLEASANT RIDGE WD / PLATTSBURGH (T) | New Distribution System, New System Consolidation | 980 | $1,120,500 | 75 | $223,466,655 |
16371 | Clinton | CHAMPLAIN VILLAGE / CHAMPLAIN (V) | Distribution Loops, Upgrade Distribution System | 1,300 | $531,675 | 65 | $223,998,330 |
16373 | Clinton | CHAMPLAIN VILLAGE / CHAMPLAIN (V) | Main replacement, Upgrade Distribution System | 1,300 | $199,385 | 60 | $224,197,715 |
17391 | Clinton | NCCS JUNIOR-SENIOR HIGH SCHOOL / NCCS | 1,121 | $323,832 | 55 | $224,521,547 | |
17478 | Clinton | ROUTE 11 WD / CHAMPLAIN (T) | Extend Distribution System | 100 | $1,267,380 | 55 | $225,788,927 |
17227 | Clinton | WATER DISTRICT EXTENSION NO. 1 / CHAZY (T) | Extend Distribution System | 40 | $265,000 | 55 | $226,053,927 |
17477 | Clinton | SOUTH STREET WATER DISTRICT / CHAMPLAIN (T) | Extend Distribution System | 30 | $216,300 | 55 | $226,270,227 |
17479 | Clinton | WEST SERVICE ROAD WD / CHAMPLAIN (T) | Extend Distribution System | 30 | $675,284 | 55 | $226,945,511 |
15660 | Clinton | TOWN OF MOOERS PROPOSED WD#1 / MOOERS (T) | Extend Distribution System | 1,250 | $6,212,250 | 50 | $233,157,761 |
16374 | Clinton | CHAMPLAIN VILLAGE / CHAMPLAIN (V) | Upgrade Storage | 1,300 | $332,290 | 40 | $233,490,051 |
17309 | Clinton | PLEASANT RIDGE TRAILER PARK / PLEASANT RIDGE MHP | New Storage | 50 | $8,096 | 40 | $233,498,147 |
15401 | Clinton | PERU WD / PERU (T) | Upgrade Surface Water Source, New Transmission | 2,600 | $620,000 | 25 | $234,118,147 |
17340 | Clinton | GREATER PLATTSBURGH WATER DISTRICT / PLATTSBURGH (T) | New Other Expenses, New Other (OT) | 8,376 | $541,000 | 25 | $234,659,147 |
16372 | Clinton | CHAMPLAIN VILLAGE / CHAMPLAIN (V) | Computerization of metering and billing, Other Expenses, Other (OT) | 1,300 | $34,900 | 25 | $234,694,047 |
16227 | Clinton | GREATER PLATTSBURGH WATER DISTRICT / SCHUYLER FALLS (T) | Upgrade Pump Station | 8,376 | $142,000 | 20 | $234,836,047 |
16230 | Clinton | GREATER PLATTSBURGH WATER DISTRICT / SCHUYLER FALLS (T) | New Storage | 8,376 | $565,000 | 20 | $235,401,047 |
16494 | Clinton | TOWN OF CHAMPLAIN / CHAMPLAIN (T) | System Acquisition-"Benefit Area #1", New Ground Water Source, New Distribution System | 50 | $497,200 | 20 | $235,898,247 |
Columbia | |||||||
17288 | Columbia | HUDSON CITY / HUDSON (C) | Phase 2 of #16251, New Surface Water Treatment Rule Compliance Facility, New Storage | 8,100 | $1,000,000 | 2,205 | $236,898,247 |
15773 | Columbia | STOCKPORT WD #2 (CONSOLIDATED) / STOCKPORT (T) | New Surface Water Treatment Rule Compliance Facility, New Transmission, New Storage | 3,100 | $0 | 1,210 | $236,898,247 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
17175 | Columbia | TOWN OF CLAVERACK WD #1 / CLAVERACK (T) | New system to serve users previously on (C) Hudson raw water main, New Surface Water Treatment Rule Compliance Facility, New Complete System (New System), New Inter-Connection, New System Consolidation | 1,200 | $227,000 | 1,180 | $237,125,247 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
16394 | Columbia | MAPLE LANE ASSOCIATES / MAPLE LANE ASSOCIATES | New Ground Water Source, New Transmission, New Distribution System | 147 | $233,295 | 165 | $237,358,542 |
15532 | Columbia | CHATHAM VILLAGE / CHATHAM (V) | Upgrade Ground Water Source, Upgrade Storage | 2,800 | $724,800 | 85 | $238,083,342 |
16444 | Columbia | DARROW SCHOOL / THE DARROW SCHOOL | New Ground Water Source, New Storage | 150 | $169,950 | 75 | $238,253,292 |
16920 | Columbia | HAMLET OF EAST CHATHAM / CHATHAM (T) | New Complete System (New System) | 65 | $1,009,745 | 45 | $239,263,037 |
15765 | Columbia | GREENPORT WD NO1 / GREENPORT (T) | Charles St., Janis St., Greenport Pkwy., and Rte. 9, Upgrade Distribution System | 4,050 | $651,475 | 40 | $239,914,512 |
16489 | Columbia | HHD CORP. NORTH SHORE. / HHD DEVELOPMENT CORPORATION | Upgrade Distribution System | 75 | $225,000 | 35 | $240,139,512 |
15769 | Columbia | GREENPORT WD NO1 / GREENPORT (T) | Upgrade Pump Station | 4,050 | $637,313 | 35 | $240,776,825 |
15535 | Columbia | CHATHAM VILLAGE / CHATHAM (V) | Upgrade Ground Water Source, Upgrade Distribution System | 2,800 | $1,240,000 | 35 | $242,016,825 |
15775 | Columbia | STOCKPORT WD #2 (CONSOLIDATED) / STOCKPORT (T) | Upgrade Distribution System | 3,100 | $900,463 | 30 | $242,917,288 |
15761 | Columbia | GREENPORT WD NO1 / GREENPORT (T) | Control System Improvements, Upgrade Distribution System | 4,050 | $354,063 | 30 | $243,271,351 |
15757 | Columbia | GREENPORT WD NO1 / GREENPORT (T) | Upgrade Storage | 4,050 | $80,443 | 25 | $243,351,794 |
15117 | Columbia | HUNT HOMESTEAD / HUNT'S HOMESTEAD MHP | Upgrade Storage | 51 | $41,200 | 15 | $243,392,994 |
Cortland | |||||||
15586 | Cortland | MARATHON VILLAGE / MARATHON (V) | New Ground Water Source, New Transmission, Upgrade Distribution System | 1,107 | $930,000 | 145 | $244,322,994 |
15294 | Cortland | HOMER VILLAGE-NEWTON WATER WORKS / HOMER (V) | New Transmission, New Pump Station | 4,368 | $325,000 | 100 | $244,647,994 |
15287 | Cortland | TOWN OF VIRGIL / VIRGIL (T) | Upgrade Ground Water Source, New Storage, Extend Distribution System, System Consolidation | 345 | $2,223,234 | 50 | $246,871,228 |
15297 | Cortland | HOMER VILLAGE-NEWTON WATER WORKS / HOMER (V) | Upgrade Distribution System | 4,368 | $440,000 | 50 | $247,311,228 |
15302 | Cortland | CORTLAND (C) / CORTLAND (C) | New Transmission, New Storage | 20,095 | $2,592,000 | 35 | $249,903,228 |
17190 | Cortland | CINCINNATUS WATER DISTRICT / CINCINNATUS (T) | Upgrade Ground Water Source, Upgrade Transmission | 650 | $126,500 | 30 | $250,029,728 |
15298 | Cortland | HOMER VILLAGE-NEWTON WATER WORKS / HOMER (V) | New Transmission, New Storage | 4,368 | $528,750 | 25 | $250,558,478 |
Delaware | |||||||
16797 | Delaware | STAMFORD VILLAGE / STAMFORD (V) | Phase 2 of Project 15027, New Water Treatment Plant | 1,280 | $46,735 | 2,150 | $250,605,213 |
17423 | Delaware | ANDES WD / ANDES (T) | Phase 3 of project #15916 Water supply , treatment and distribution improvements., Upgrade Distribution System | 300 | $257,500 | 2,120 | $250,862,713 |
17272 | Delaware | TOWN OF DAVENPORT WD / DAVENPORT (T) | Acquisition and improvement of private water company by (T) Davenport. New wells to replace GWUDI springs, New Ground Water Source, New Storage, New Water District | 104 | $823,000 | 220 | $251,685,713 |
16744 | Delaware | FLEISCHMANNS VILLAGE / FLEISCHMANNS (V) | New Ground Water Source, New Storage, Upgrade Distribution System | 625 | $3,000,000 | 205 | $254,685,713 |
16606 | Delaware | DELHI VILLAGE / DELHI (V) | New Ground Water Source, Upgrade Distribution System | 3,833 | $1,135,500 | 185 | $255,821,213 |
17417 | Delaware | ARKVILLE WATER DISTRICT / MIDDLETOWN (T) | New Ground Water Source, New Storage, Extend Distribution System, System Consolidation | 250 | $3,345,780 | 115 | $259,166,993 |
15996 | Delaware | FRANKLIN VILLAGE / FRANKLIN (V) | New Ground Water Source, New Storage, Upgrade Distribution System | 480 | $1,109,365 | 110 | $260,276,358 |
16653 | Delaware | WALTON VILLAGE / WALTON (V) | New Other Expenses, Upgrade Storage, Upgrade Distribution System, Extend Distribution System, New Other (OT) | 3,070 | $2,183,959 | 100 | $262,460,317 |
15843 | Delaware | MARGARETVILLE VILLAGE / MARGARETVILLE (V) | Upgrade Storage, Upgrade Distribution System | 660 | $737,900 | 75 | $263,198,217 |
15619 | Delaware | ROXBURY WATER DISTRICT / ROXBURY (T) | Upgrade Storage, Upgrade Distribution System | 750 | $411,000 | 65 | $263,609,217 |
15316 | Delaware | ARKVILLE WATER DISTRICT / MIDDLETOWN (T) | Upgrade Ground Water Source | 250 | $494,400 | 35 | $264,103,617 |
15836 | Delaware | MARGARETVILLE VILLAGE / MARGARETVILLE (V) | Upgrade Distribution System | 660 | $1,011,000 | 35 | $265,114,617 |
Dutchess | |||||||
17471 | Dutchess | POUGHKEEPSIE CITY/TOWN TREATMENT PLANT / P'KEEPSIE(C)(T)/WAP.FALLS (V) | Phase 4 of DWSRF 15654, valve replacement program, unidirectional flushing to permit chlorimine system to go on-line, Upgrade Distribution System | 30,000 | $1,894,988 | 2,100 | $267,009,605 |
15292 | Dutchess | WAPPINGER PARK HOMES / WAPPINGER (T) | Central Wappinger Water Improvement Area, Ardmore Hills Water Impr. Area, N. Wappinger Water Impr. Area, Cranberry Hills Water Impr. Area, & Meadowood and Cedar Ridge Subdiv., New Storage, System Consolidation | 400 | $14,676,600 | 155 | $281,686,205 |
16876 | Dutchess | BRETTVIEW ACRES WATER CO / BRETTVIEW WATER CO. INC. | New Surface Water Treatment Rule Compliance Facility | 920 | $40,800 | 115 | $281,727,005 |
17071 | Dutchess | BIRCH HILL MANOR / BIRCH HILL WATER SUPPLY CORP. | To address an inadequate source capacity, Iron, Lead and Copper violations., Upgrade Water Treatment Plant, New Ground Water Source | 180 | $299,040 | 115 | $282,026,045 |
16741 | Dutchess | PAWLING VILLAGE / PAWLING (V) | New Ground Water Source | 2,181 | $1,138,800 | 105 | $283,164,845 |
15301 | Dutchess | TIVOLI VILLAGE / TIVOLI (V) | Construct 2 supply wells, treatment, storage, interconnect Village with (T) Redhook & Rokeby Estates, New Ground Water Source, New Storage, New Inter-Connection | 1,303 | $3,523,790 | 105 | $286,688,635 |
17338 | Dutchess | DUTCHESS ESTATES INC / DUTCHESS ESTATES WATER COMPANY | Upgrade Pump Station | 500 | $455,388 | 100 | $287,144,023 |
17021 | Dutchess | ROKEBY HOMES,INC. / DUTCHESS CO WATER & WASTE AUT | Upgrade Ground Water Source, Upgrade Distribution System, New System Consolidation | 160 | $343,717 | 100 | $287,487,740 |
16618 | Dutchess | SHOREHAVEN CIVIC ASSOC / SHORE HAVEN CIVIC ASSOC. | Upgrade Water Treatment Plant, New Ground Water Source | 300 | $600,000 | 95 | $288,087,740 |
16534 | Dutchess | WAPPINGER PARK HOMES / WAPPINGER (T) | Consolidation of Wappinger Park, Tall Trees, and Oakwood Water Districts, New Transmission, New Inter-Connection | 400 | $7,649,165 | 95 | $295,736,905 |
15288 | Dutchess | WAPPINGERS FALLS VILLAGE / WAPPINGERS FALLS (V) | New wells & Iron removal treatment., New Water Treatment Plant, Upgrade Ground Water Source | 4,605 | $2,559,700 | 90 | $298,296,605 |
16111 | Dutchess | BARD COLLEGE / BARD COLLEGE | Upgrade Water Treatment Plant, New Storage | 1,400 | $1,417,500 | 85 | $299,714,105 |
16737 | Dutchess | DOVER RIDGE ESTATES / BEEKMAN (T) | Upgrade Ground Water Source | 250 | $266,500 | 65 | $299,980,605 |
17282 | Dutchess | RHINEBECK VILLAGE WATER / RHINEBECK (V) | Upgrade Water Treatment Plant | 4,300 | $365,200 | 65 | $300,345,805 |
16235 | Dutchess | RED HOOK VILLAGE / RED HOOK (V) | New Ground Water Source | 2,214 | $433,000 | 60 | $300,778,805 |
15740 | Dutchess | AMENIA WATER DISTRICT NO 1 / AMENIA (T) | New Storage, Upgrade Distribution System | 1,000 | $1,480,000 | 55 | $302,258,805 |
15295 | Dutchess | BEEKMAN (T) / BEEKMAN (T) | New Complete System (New System), New Distribution System | 80 | $579,478 | 45 | $302,838,283 |
17421 | Dutchess | POUGHKEEPSIE CITY / POUGHKEEPSIE (C) | New Storage | 30,000 | $150,000 | 40 | $302,988,283 |
16803 | Dutchess | LAGRANGE/MANCHESTER / LAGRANGE (T) | New Water District | 2,500 | $7,813,000 | 40 | $310,801,283 |
16583 | Dutchess | LAKE LODGES APARTMENTS / LAKE LODGE APTS. | New Ground Water Source, Upgrade Pump Station, Upgrade Distribution System | 30 | $85,000 | 35 | $310,886,283 |
17420 | Dutchess | POUGHKEEPSIE CITY / POUGHKEEPSIE (C) | Upgrade Distribution System | 30,000 | $1,762,845 | 35 | $312,649,128 |
16246 | Dutchess | LITTLE SWITZERLAND / EAST FISHKILL (T) | Upgrade Distribution System, System Consolidation | 600 | $428,900 | 35 | $313,078,028 |
15938 | Dutchess | TACONIC ESTATES WATER DISTRICT / EAST FISHKILL (T) | New Ground Water Source, System Consolidation | 185 | $148,000 | 35 | $313,226,028 |
15645 | Dutchess | POUGHKEEPSIE TOWNWIDE WD / POUGHKEEPSIE (T) | System Consolidation | 40,000 | $6,650,000 | 35 | $319,876,028 |
16297 | Dutchess | WINGDALE VILLAGE PARK / WINGDALE VILLAGE PARK | Upgrade Water Treatment Plant, New Ground Water Source | 150 | $74,000 | 30 | $319,950,028 |
16461 | Dutchess | STONEY CREEK FARMS (TOWN HOMES / STONEY CREEK FARMS HOMEOWNERS | New Water Treatment Plant | 28 | $18,000 | 30 | $319,968,028 |
16845 | Dutchess | VICTORY LAKE NURSING HOME / VICTORY LAKE NURSING CENTER | Upgrade Storage, Upgrade Distribution System | 270 | $367,092 | 20 | $320,335,120 |
15595 | Dutchess | RED HOOK VILLAGE / RED HOOK (V) | Upgrade Ground Water Source | 2,214 | $142,000 | 20 | $320,477,120 |
16236 | Dutchess | RED HOOK VILLAGE / RED HOOK (V) | New Storage | 2,214 | $721,000 | 20 | $321,198,120 |
17419 | Dutchess | WAPPINGERS FALLS VILLAGE / WAPPINGER FALLS (V) | Upgrade Storage, New Storage, Upgrade Distribution System | 4,605 | $6,238,532 | 20 | $327,436,652 |
16384 | Dutchess | TOWN OF NORTHEAST WD / NORTHEAST (T) | Upgrade Distribution System, New Water District | 411 | $100,000 | 20 | $327,536,652 |
16514 | Dutchess | DUTCHESS CO WATER AUTH - VALLEYDALE / DUTCHESS CO WATER & WASTE AUT | New Ground Water Source, Upgrade Distribution System | 500 | $306,365 | 15 | $327,843,017 |
15930 | Dutchess | RHINEBECK VILLAGE WATER / RHINEBECK (V) | Remediate backwash "Sludge Pond", Upgrade Water Treatment Plant | 4,300 | $223,000 | 15 | $328,066,017 |
17424 | Dutchess | DARROWS MOBILE PARK / | 15 | $100,000 | 15 | $328,166,017 | |
15927 | Dutchess | RHINEBECK VILLAGE WATER / RHINEBECK (V) | Upgrade Distribution System | 4,300 | $1,569,000 | 15 | $329,735,017 |
15662 | Dutchess | PINE PLAINS WATER IMPROVEMENT / PINE PLAINS (T) | Upgrade Distribution System | 860 | $1,617,284 | 15 | $331,352,301 |
15644 | Dutchess | POUGHKEEPSIE TOWNWIDE WD / POUGHKEEPSIE (T) | Upgrade Distribution System | 40,000 | $410,000 | 10 | $331,762,301 |
16540 | Dutchess | CHARLOTTE GROVE MOBILE HOME CT / CHARLETTE GROVE MOBIL HOME COU | Upgrade Distribution System | 112 | $302,820 | 10 | $332,065,121 |
Erie | |||||||
17287 | Erie | FARNHAM VILLAGE / FARNHAM (V) | Phase 2 of DWSRF#16271., Upgrade Transmission, New Storage, Upgrade Distribution System | 404 | $250,000 | 2,110 | $332,315,121 |
15680 | Erie | TOWN OF COLDEN WATER DISTRICT #1 / COLDEN (T) | Extend to serve private contaminated wells, consolidate public water supplies, eliminate public water supply with past coliform detections., Extend Distribution System | 450 | $1,000,000 | 1,120 | $333,315,121 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
16087 | Erie | TOWN OF NEWSTEAD / NEWSTEAD (T) | New Storage, Extend Distribution System, System Consolidation | 5,000 | $1,000,000 | 1,105 | $334,315,121 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
17180 | Erie | BUFFALO WATER AUTHORITY / BUFFALO MUN. FINANCE WATER AUT | Upgrade Water Treatment Plant | 345,974 | $13,388,334 | 1,100 | $347,703,455 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
17337 | Erie | HUNTERS CREEK MOBILE HOME PARK / HUNTERS CREEK MHP | Address total coliform detections and organic exceedances, Upgrade Water Treatment Plant, New Storage, New Pump Station, Upgrade Distribution System | 150 | $175,100 | 185 | $347,878,555 |
17442 | Erie | S. WEST ERIE CO. REGIONAL WATER PROJECT / EDEN (T) | Service for the (T's) of Eden,Brant,N. Collins, (V's) of Angola,Nort Collins & the Collins Correc. Facility, eliminate public water supply with past coliform detections, New Transmission, New Storage, New Pump Station, New Distribution System, New System Consolidation | 16,620 | $38,900,000 | 175 | $386,778,555 |
17457 | Erie | CHAFFEE WATER CO / CHAFFEE WATER CO. | New Ground Water Source, New Storage | 200 | $626,368 | 165 | $387,404,923 |
17339 | Erie | S. EAST ERIE CO. REGIONAL WATER PROJECT / AURORA (T) | Aurora WD19, Wales WD's2&3, and Holland WIA. Extend to serve private contaminated wells, consolidate public water supplies, eliminate public water supply with past coliform detections, Storage, Pump Station, Extend Distribution System, System Consolidation | 2,950 | $18,925,385 | 150 | $406,330,308 |
15602 | Erie | EVANS WD #5 / EVANS (T) | Extend system to serve area with private contaminated wells, remediate existing pressure problems. , New Storage, Extend Distribution System, New System Consolidation | 3,136 | $9,900,000 | 130 | $416,230,308 |
17169 | Erie | ERIE COUNTY WATER AUTHORITY / ERIE COUNTY WATER AUTHORITY | Consolidation of the (C) Buffalo's system into ECWA,, New System Consolidation | 402,180 | $122,000,000 | 125 | $538,230,308 |
17151 | Erie | AURORA WATER DISTRICT 18 / AURORA (T) | Extend system to serve area with private contaminated wells, consolidate public water supply, eliminate public water supply with past total coliform detection. WD 18., Extend Distribution System | 1,288 | $15,704,100 | 120 | $553,934,408 |
15922 | Erie | ALDEN VILLAGE / ALDEN (V) | Upgrade Ground Water Source | 2,666 | $640,003 | 105 | $554,574,411 |
17090 | Erie | SPRINGVILLE VILLAGE / SPRINGVILLE (V) | Upgrade Water Treatment Plant, New Storage, Upgrade Distribution System | 4,310 | $4,569,080 | 105 | $559,143,491 |
17416 | Erie | TOWN OF NEWSTEAD WD#10 / NEWSTEAD (T) | 220 | $1,400,000 | 105 | $560,543,491 | |
15736 | Erie | COLLINS WD #3 / COLLINS (T) | Upgrade Transmission, New Storage, Upgrade Distribution System | 760 | $625,000 | 80 | $561,168,491 |
15982 | Erie | TOWN OF EDEN PROPOSED WATER DISTRICT / EDEN (T) | Extend Distribution System | 300 | $725,000 | 70 | $561,893,491 |
15981 | Erie | AKRON VILLAGE / AKRON (V) | Upgrade Water Treatment Plant | 2,971 | $2,380,000 | 65 | $564,273,491 |
15880 | Erie | EVANS, TOWN WATER DEPARTMENT / EVANS (T) | Angola Service Area of the NYS Thruway Authority., Extend Distribution System | 14,329 | $225,000 | 60 | $564,498,491 |
17395 | Erie | ERIE COUNTY WATER AUTHORITY / ERIE COUNTY WATER AUTHORITY | Consolidation of the Village of Williamsville's water system into ECWA's., New System Consolidation | 402,180 | $3,723,500 | 60 | $568,221,991 |
15339 | Erie | EAST HILL WATER DISTRICT NO. 3 / BOSTON (T) | New Storage, New Pump Station, Extend Distribution System | 800 | $3,708,000 | 55 | $571,929,991 |
16851 | Erie | TOWN OF AURORA WATER IMP. AREA NO. 5 / AURORA (T) | Extend Distribution System | 210 | $613,500 | 55 | $572,543,491 |
17394 | Erie | ERIE COUNTY WATER AUTHORITY / ERIE COUNTY WATER AUTHORITY | Consolidation of the Town of Lancaster's water system into ECWA's., New System Consolidation | 402,180 | $7,480,000 | 50 | $580,023,491 |
15508 | Erie | TOWN OF MARILLA WATER DISTRICT #3 / MARILLA (T) | Extend Distribution System | 1,530 | $2,420,500 | 50 | $582,443,991 |
15497 | Erie | TOWN OF MARILLA WATER DISTRICT NO. 4 / MARILLA (T) | Extend Distribution System | 760 | $2,249,845 | 50 | $584,693,836 |
16557 | Erie | TOWN OF NEWSTEAD WD#7 / NEWSTEAD (T) | Fletcher Road, Extend Distribution System | 30 | $127,300 | 50 | $584,821,136 |
15738 | Erie | COLLINS WDS #1 AND #2 / COLLINS (T) | New Transmission, New Storage, Upgrade Distribution System | 1,300 | $566,500 | 45 | $585,387,636 |
15439 | Erie | ANGOLA VILLAGE / ANGOLA (V) | New Storage, Upgrade Distribution System | 4,200 | $4,090,000 | 45 | $589,477,636 |
15004 | Erie | BOSTON WD #2 / BOSTON (T) | New Storage, New Pump Station, Extend Distribution System | 1 | $1,230,000 | 40 | $590,707,636 |
15606 | Erie | EVANS WD #3 / EVANS (T) | Extend Distribution System | 704 | $310,000 | 35 | $591,017,636 |
15898 | Erie | GOWANDA VILLAGE / GOWANDA (V) | New Transmission | 2,800 | $885,250 | 35 | $591,902,886 |
15961 | Erie | ELMA WATER DISTRICT NO. 1 / ELMA (T) | Upgrade Distribution System | 10,287 | $145,300 | 30 | $592,048,186 |
17396 | Erie | ERIE COUNTY WATER AUTHORITY / ERIE COUNTY WATER AUTHORITY | Parallel 48 inch transmission mains between Van de Water WTP & Ball Pump Station., New Transmission | 402,180 | $16,620,000 | 30 | $608,668,186 |
17397 | Erie | ERIE COUNTY WATER AUTHORITY / ERIE COUNTY WATER AUTHORITY | 36 inch transmission main on Sweet Home Road., New Transmission | 402,180 | $5,544,000 | 30 | $614,212,186 |
17398 | Erie | ERIE COUNTY WATER AUTHORITY / ERIE COUNTY WATER AUTHORITY | Parallel 48 inch raw water line between Van de Water raw water pump station & WTP., New Transmission | 402,180 | $5,544,000 | 30 | $619,756,186 |
15534 | Erie | COLLINS WD #4 / COLLINS (T) | New Pump Station | 73 | $235,000 | 30 | $619,991,186 |
15133 | Erie | HOLLAND WATER DISTRICT / HOLLAND (T) | Upgrade Water Treatment Plant, New Ground Water Source | 1,680 | $200,000 | 25 | $620,191,186 |
16016 | Erie | DEPEW VILLAGE / DEPEW (V) | Extend Distribution System | 7,500 | $112,500 | 25 | $620,303,686 |
17399 | Erie | ERIE COUNTY WATER AUTHORITY / ERIE COUNTY WATER AUTHORITY | 36 inch transmission main on Maple Road., New Transmission | 402,180 | $17,706,000 | 25 | $638,009,686 |
16167 | Erie | GRAND ISLAND WD #1 / GRAND ISLAND (T) | Upgrade Water Treatment Plant | 205 | $1,459,374 | 20 | $639,469,060 |
15477 | Erie | ERIE COUNTY WATER AUTHORITY / ECWA/ AMHERST (T) | Town of Amherst WD 15C - Country Parkway., Upgrade Distribution System | 402,180 | $275,000 | 20 | $639,744,060 |
15479 | Erie | ERIE COUNTY WATER AUTHORITY / ECWA/ AMHERST (T) | Town of Amherst-Sheridan Dr. to Klein Rd., Upgrade Distribution System | 402,180 | $550,000 | 20 | $640,294,060 |
15484 | Erie | ERIE COUNTY WATER AUTHORITY / ECWA/ AMHERST (T) | Town of Amherst WD 15C - Niagara Falls Blvd., Upgrade Distribution System | 402,180 | $300,000 | 20 | $640,594,060 |
15486 | Erie | ERIE COUNTY WATER AUTHORITY / ECWA/ AMHERST (T) | Town of Amherst WD 15C - Casey Rd., Upgrade Distribution System | 402,180 | $250,000 | 20 | $640,844,060 |
16042 | Erie | EAST AURORA VILLAGE / EAST AURORA (V) | Upgrade Distribution System | 7,200 | $1,707,950 | 20 | $642,552,010 |
16578 | Erie | SPRINGVILLE MOBILE VILLAGE / PARSS PROPERTIES | New Ground Water Source | 90 | $48,600 | 20 | $642,600,610 |
16758 | Erie | W. SENECA WD#3 / WEST SENECA (T) | Orchard Park Road Watermain, Upgrade Distribution System | 520 | $460,000 | 20 | $643,060,610 |
16501 | Erie | BLASDELL VILLAGE / BLASDELL (V) | Phase 1, see project #16624 for phase 2., Upgrade Distribution System | 2,718 | $860,500 | 20 | $643,921,110 |
16624 | Erie | BLASDELL VILLAGE / BLASDELL (V) | Phase 2, see project #16501 for phase 1., Upgrade Distribution System | 2,718 | $651,600 | 20 | $644,572,710 |
15444 | Erie | WILLIAMSVILLE (V) / WILLIAMSVILLE (V) | Northeast quadrant transmission system improvements., Upgrade Distribution System | 6,017 | $808,396 | 15 | $645,381,106 |
15469 | Erie | WILLIAMSVILLE (V) / WILLIAMSVILLE (V) | Los Robles Street water reconstruction project., Upgrade Distribution System | 6,017 | $408,447 | 15 | $645,789,553 |
16815 | Erie | LANCASTER VILLAGE / LANCASTER (V) | Upgrade Distribution System | 13,056 | $1,670,454 | 15 | $647,460,007 |
16187 | Erie | GRAND ISLAND TOWN WATER DEPT. / GRAND ISLAND (T) | Upgrade Water Treatment Plant | 19,000 | $340,000 | 10 | $647,800,007 |
17335 | Erie | WILLIAMSVILLE (V) / WILLIAMSVILLE (V) | Upgrade Distribution System | 6,017 | $2,700,000 | 10 | $650,500,007 |
16396 | Erie | ORCHARD PARK VILLAGE / ORCHARD PARK (V) | Upgrade Distribution System | 3,100 | $50,000 | 10 | $650,550,007 |
16740 | Erie | ORCHARD PARK WD#1 / ORCHARD PARK (T) | 2000 water system improvements., Upgrade Distribution System | 612 | $7,081,000 | 10 | $657,631,007 |
15627 | Erie | HAMBURG (T) WD'S / HAMBURG (T) | New Distribution System | 35,000 | $1,346,725 | 5 | $658,977,732 |
16178 | Erie | GRAND ISLAND TOWN WATER DEPT. / GRAND ISLAND (T) | Ransom Road waterline improvements., Upgrade Distribution System | 19,000 | $111,453 | 5 | $659,089,185 |
16182 | Erie | GRAND ISLAND TOWN WATER DEPT. / GRAND ISLAND (T) | Bush Road waterline improvements., Upgrade Distribution System | 19,000 | $228,113 | 5 | $659,317,298 |
16185 | Erie | GRAND ISLAND TOWN WATER DEPT. / GRAND ISLAND (T) | Sandy Beach waterline improvements., Upgrade Distribution System | 19,000 | $986,154 | 5 | $660,303,452 |
15118 | Erie | CLARENCE, TOWN WATER DEPT. / CLARENCE (T) | Sheridan Drive watermain replacement., Upgrade Distribution System | 15,000 | $1,597,700 | 5 | $661,901,152 |
15119 | Erie | CLARENCE, TOWN WATER DEPT. / CLARENCE (T) | Main Street watermain replacement., Upgrade Distribution System | 15,000 | $2,650,000 | 5 | $664,551,152 |
15120 | Erie | CLARENCE, TOWN WATER DEPT. / CLARENCE (T) | Goodrich Road Watermain Extension., Extend Distribution System | 15,000 | $165,000 | 5 | $664,716,152 |
15121 | Erie | CLARENCE, TOWN WATER DEPT. / CLARENCE (T) | Harris Hill Road & Arondale Drive watermain replacements., Upgrade Distribution System | 15,000 | $726,200 | 5 | $665,442,352 |
16556 | Erie | WILLIAMSVILLE (V) / WILLIAMSVILLE (V) | Mill Street, Upgrade Distribution System | 6,017 | $141,000 | 5 | $665,583,352 |
Essex | |||||||
17031 | Essex | CROWN POINT WD / CROWN POINT (T) | Phase 2 of DWSRF Project #15889, New Ground Water Source, New Storage, New Pump Station, Upgrade Distribution System | 995 | $1,582,000 | 2,115 | $667,165,352 |
17023 | Essex | RAY BROOK WD / NORTH ELBA (T) | Phase 2 of DWSRF #15809. , New Ground Water Source, Upgrade Storage, Upgrade Distribution System | 400 | $499,404 | 2,100 | $667,664,756 |
15848 | Essex | MORIAH WD / MORIAH (T) | New Surface Water Treatment Rule Compliance Facility, New Transmission, New Storage | 3,100 | $1,918,975 | 1,240 | $669,583,731 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
15873 | Essex | WESTPORT WD / WESTPORT (T) | New Ground Water Source, Upgrade Distribution System | 800 | $0 | 1,235 | $669,583,731 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
15844 | Essex | KEENE WD / KEENE (T) | New Ground Water Source, New Transmission, New Storage, Upgrade Distribution System | 300 | $1,210,942 | 1,200 | $670,794,673 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
17053 | Essex | UPPER JAY WD / JAY (T) | New Surface Water Treatment Rule Compliance Facility, Upgrade Transmission, Upgrade Storage, Upgrade Distribution System | 234 | $1,906,561 | 1,185 | $672,701,234 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
17069 | Essex | WILLSBORO WD / WILLSBORO (T) | Extend to serve Willsboro Bay WD for SWTR compliance., Upgrade Distribution System, New System Consolidation | 1,571 | $0 | 1,185 | $672,701,234 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
17052 | Essex | WILMINGTON WD / WILMINGTON (T) | Upgrade Transmission, New Storage, Upgrade Distribution System | 980 | $971,526 | 1,175 | $673,672,760 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
17195 | Essex | KEENE VALLEY WD / KEENE (T) | New Ground Water Source, New Storage, Upgrade Distribution System | 450 | $0 | 1,165 | $673,672,760 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
15829 | Essex | MINERVA WD / MINERVA (T) | New Ground Water Source, Upgrade Distribution System, New System Consolidation | 800 | $0 | 1,105 | $673,672,760 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
15881 | Essex | WADHAMS WD / WESTPORT (T) | New Surface Water Treatment Rule Compliance Facility, New Inter-Connection, New System Consolidation | 140 | $2,114,490 | 240 | $675,787,250 |
17388 | Essex | PORT KENT WD / CHESTERFIELD (T) | New Surface Water Treatment Rule Compliance Facility, New Ground Water Source, New Storage | 75 | $3,633,268 | 155 | $679,420,518 |
17164 | Essex | TICONDEROGA WD / TICONDEROGA (T) | Extention of Town system to serve Shore Airport Road and the International Paper Mill., New Storage, New Distribution System, New System Consolidation | 5,000 | $2,141,880 | 130 | $681,562,398 |
17163 | Essex | TICONDEROGA WD / TICONDEROGA (T) | New Transmission, New Storage | 5,000 | $8,883,467 | 105 | $690,445,865 |
15827 | Essex | MINERVA WD / MINERVA (T) | New Storage, Upgrade Distribution System | 800 | $175,000 | 75 | $690,620,865 |
16589 | Essex | MORIAH WD / MORIAH (T) | Upgrade Distribution System | 3,100 | $239,450 | 65 | $690,860,315 |
15797 | Essex | PORT HENRY V / PORT HENRY (V) | Upgrade Transmission, Upgrade Distribution System | 1,831 | $511,910 | 65 | $691,372,225 |
16659 | Essex | PORT HENRY V / PORT HENRY (V) | Upgrade Distribution System | 1,831 | $4,315,148 | 65 | $695,687,373 |
15846 | Essex | MORIAH WD / MORIAH (T) | Upgrade Distribution System | 3,100 | $606,876 | 60 | $696,294,249 |
15849 | Essex | MORIAH WD / MORIAH (T) | New Other Expenses, Upgrade Distribution System, New Other (OT) | 3,100 | $1,573,733 | 60 | $697,867,982 |
15841 | Essex | LEWIS WD / LEWIS (T) | Upgrade Distribution System | 428 | $792,076 | 55 | $698,660,058 |
16045 | Essex | NEW RUSSIA WD / ELIZABETHTOWN (T) | Upgrade Water Treatment Plant, New Storage, Upgrade Distribution System | 60 | $135,000 | 45 | $698,795,058 |
16897 | Essex | CROWN POINT WD / CROWN POINT (T) | Upgrade Distribution System | 995 | $400,000 | 35 | $699,195,058 |
17193 | Essex | AUSABLE FORKS WD / JAY (T) | New Storage | 900 | $1,083,663 | 35 | $700,278,721 |
16378 | Essex | WILMINGTON WD / WILLMINGTON (T) | Upgrade Surface Water Source, Upgrade Transmission | 980 | $30,000 | 30 | $700,308,721 |
15806 | Essex | WINEBROOK HILLS WD / NEWCOMB (T) | Upgrade Storage | 100 | $326,253 | 30 | $700,634,974 |
Franklin | |||||||
17085 | Franklin | MALONE V / MALONE (V) | New Surface Water Treatment Rule Compliance Facility, New Storage | 13,000 | $0 | 1,230 | $700,634,974 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
17390 | Franklin | NORTH BANGOR WS / BANGOR (T) | Replace existing GWUDI source with new wells. Provide service for existing homes on contaminated wells., New Ground Water Source, New Storage, New Distribution System | 50 | $2,654,962 | 225 | $703,289,936 |
17455 | Franklin | WATER DISTRICT #3 / MALONE (T) | New Distribution System, New System Consolidation | 300 | $1,891,000 | 145 | $705,180,936 |
16861 | Franklin | TUPPER LAKE V / TUPPER LAKE (V) | New Storage, Upgrade Distribution System | 6,000 | $633,104 | 115 | $705,814,040 |
15246 | Franklin | ST REGIS MOHAWK WATER SYSTEM / ST. REGIS MOHAWK TRIBE | Upgrade Water Treatment Plant, New Pump Station | 1,500 | $3,897,950 | 95 | $709,711,990 |
16866 | Franklin | TUPPER LAKE V / TUPPER LAKE (V) | Upgrade Water Treatment Plant, Upgrade Transmission | 6,000 | $596,295 | 90 | $710,308,285 |
16807 | Franklin | TUPPER LAKE (T) WD #17, LITTLE WOLF WD / TUPPER LAKE (T) | New system to serve area with private contaminated wells, consolidate public water supply. , New Complete System (New System) | 250 | $540,000 | 85 | $710,848,285 |
16571 | Franklin | TOWN OF HARRIETSTOWN / HARRIETSTOWN (T) | Upgrade Distribution System | 5,621 | $710,800 | 55 | $711,559,085 |
16957 | Franklin | CHATEAUGAY V / CHATEAUGAY (V) | Upgrade Distribution System | 1,100 | $2,300,000 | 55 | $713,859,085 |
15712 | Franklin | SARANAC LAKE V / SARANAC LAKE (V) | Upgrade Storage, Upgrade Pump Station | 5,800 | $582,400 | 45 | $714,441,485 |
17226 | Franklin | (T) CHATEAUGAY WD#1 / CHATEAUGAY (T) | New Water District | 100 | $114,075 | 45 | $714,555,560 |
16896 | Franklin | SARANAC LAKE V / SARANAC LAKE (V) | Upgrade Distribution System | 5,800 | $180,250 | 45 | $714,735,810 |
17284 | Franklin | MALONE V / MALONE (V) | New Transmission | 13,000 | $498,963 | 40 | $715,234,773 |
17304 | Franklin | FORT COVINGTON WD / FORT COVINGTON (T) | Upgrade Distribution System | 900 | $413,545 | 30 | $715,648,318 |
17184 | Franklin | BURKE V / VILLAGE OF BURKE | New Other Expenses, New Other (OT) | 273 | $250,000 | 20 | $715,898,318 |