NYS Drinking Water State Revolving Fund
Multi-Year List for October 1, 2005 to September 30, 2006
Fulton - Niagara
Project | County | System Name/ Borrower |
Description | Pop. | Project Cost |
Score | Cumulative Total |
---|---|---|---|---|---|---|---|
Fulton | |||||||
16538 | Fulton | TWIN PINE ESTATES / CVH CHARTER CORP. | MHP on Hagadorn Mills Road in the Town of Broadalbin, New Ground Water Source, Upgrade Storage, New Pump Station | 45 | $39,655 | 150 | $715,937,973 |
15330 | Fulton | GLOVERSVILLE CITY WATER WORKS / GLOVERSVILLE (C) | Eagle Street Water Storage Tank, New Storage | 17,991 | $1,963,900 | 80 | $717,901,873 |
15331 | Fulton | GLOVERSVILLE CITY WATER WORKS / GLOVERSVILLE (C) | Ayers Hill Reservoir water storage tanks, New Storage | 17,991 | $2,234,600 | 80 | $720,136,473 |
16763 | Fulton | JOHNSTOWN CITY WATER WORKS / JOHNSTOWN (C) | Extend system to serve area with private contaminated wells. , Extend Distribution System | 8,700 | $376,708 | 75 | $720,513,181 |
15935 | Fulton | TOWN OF JOHNSTOWN / JOHNSTOWN (C) | Upgrade Distribution System | 50 | $86,725 | 50 | $720,599,906 |
15253 | Fulton | BROADALBIN VILLAGE WATER WORKS / BROADALBIN (V) | New Storage, Upgrade Distribution System | 1,397 | $1,268,960 | 30 | $721,868,866 |
15793 | Fulton | MAYFIELD VILLAGE WATER WORKS / MAYFIELD (V) | New Ground Water Source | 817 | $78,000 | 30 | $721,946,866 |
Genesee | |||||||
17063 | Genesee | TOWN OF BERGEN WATER DISTRICT #2 / BERGEN (T) | Phase 2 of #15296. Extend to serve private contaminated wells., Extend Distribution System | 250 | $150,000 | 2,085 | $722,096,866 |
16511 | Genesee | GENESSE COUNTY WATER SUPPLY / MONROE CO. WATER AUTHORITY | New system to serve area with private contaminated wells, consolidate public water supply. , New Transmission, System Consolidation | 27,000 | $20,000,000 | 95 | $742,096,866 |
16162 | Genesee | LEROY VILLAGE / LEROY (V) | Upgrade Water Treatment Plant | 6,300 | $916,000 | 75 | $743,012,866 |
15608 | Genesee | MCWA, GENESEE WEST / CORFU (V) | Upgrade Storage | 3,300 | $119,000 | 65 | $743,131,866 |
16112 | Genesee | BATAVIA CITY / BATAVIA (C) | New Water Treatment Plant | 16,310 | $19,113,000 | 60 | $762,244,866 |
17036 | Genesee | TOWN OF PEMBROKE WATER DISTRICT NO. 1 / PEMBROKE (T) | Extend system to serve area with private contaminated wells. , Extend Distribution System | 2,000 | $3,860,000 | 60 | $766,104,866 |
17065 | Genesee | TOWN OF BYRON WATER DISTRICT NO. 2 / BYRON (T) | Extend to serve private contaminated wells in Hamlet of South Byron., Extend Distribution System | 315 | $1,854,000 | 55 | $767,958,866 |
16610 | Genesee | LEROY VILLAGE / LE ROY (V) | Upgrade Water Treatment Plant | 6,300 | $2,150,000 | 50 | $770,108,866 |
15042 | Genesee | ALEXANDER VILLAGE / ALEXANDER (V) | New Pump Station | 550 | $279,942 | 45 | $770,388,808 |
16113 | Genesee | BATAVIA CITY / BATAVIA (C) | New Ground Water Source | 16,310 | $628,830 | 45 | $771,017,638 |
17066 | Genesee | TOWN OF BYRON WATER DISTRICT NO. 3 / BYRON (T) | Extend to serve private contaminated wells in the Hamlet of North Byron., Extend Distribution System | 100 | $585,000 | 45 | $771,602,638 |
16575 | Genesee | BARBARY COAST MHP / AFFORDABLE GREAT LOCATIONS | Extend Distribution System | 50 | $82,700 | 45 | $771,685,338 |
17032 | Genesee | GOLDEN MOBILE HOME PARK / CRYSTAL COLE | Consolidation of PWS by connecting to (T) Stafford water system, Upgrade Distribution System | 25 | $139,050 | 40 | $771,824,388 |
15611 | Genesee | MCWA, GENESEE WEST / CORFU (V) | Upgrade Distribution System | 3,300 | $477,000 | 35 | $772,301,388 |
17383 | Genesee | OAKFIELD VILLAGE / OAKFIELD (T) | Upgrade Transmission | 1,805 | $1,661,600 | 20 | $773,962,988 |
Greene | |||||||
17444 | Greene | COXSACKIE VILLAGE / COXSACKIE (V) | Phase 2 of 15702, Upgrade Water Treatment Plant, New Storage | 2,900 | $4,387,456 | 2,115 | $778,350,444 |
15701 | Greene | ATHENS VILLAGE / ATHENS (V) | Upgrade Water Treatment Plant | 1,850 | $900,000 | 1,190 | $779,250,444 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
16732 | Greene | VILLAGE OF HUNTER / HUNTER (V) | Consolidate public water supply, , New Surface Water Treatment Rule Compliance Facility | 429 | $1,854,000 | 1,165 | $781,104,444 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
15684 | Greene | TOWN OF NEW BALTIMORE NEW SYSTEM / NEW BALTIMORE (T) | Extend system to serve area with private contaminated wells, consolidate public water supply. , Extend Distribution System, New System Consolidation | 1,300 | $0 | 1,090 | $781,104,444 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
16106 | Greene | TANNERSVILLE VILLAGE / TANNERSVILLE (V) | New Ground Water Source, Upgrade Transmission, Upgrade Distribution System | 448 | $869,200 | 135 | $781,973,644 |
16169 | Greene | ASHLAND WD#1 / ASHLAND (T) | New Complete System (New System), New Inter-Connection | 300 | $2,873,620 | 105 | $784,847,264 |
15958 | Greene | PRATTSVILLE WATER DISTRICT / PRATTSVILLE (T) | New Ground Water Source | 409 | $422,500 | 100 | $785,269,764 |
17414 | Greene | CATSKILL VILLAGE / CATSKILL (V) | New Storage | 8,000 | $1,653,400 | 95 | $786,923,164 |
15704 | Greene | COXSACKIE VILLAGE / COXSACKIE (V) | Upgrade Transmission, New Storage, Upgrade Distribution System | 2,900 | $5,240,000 | 70 | $792,163,164 |
16728 | Greene | PRATTSVILLE WD #2 / PRATTSVILLE (T) | New Ground Water Source, New Complete System (New System) | 25 | $468,585 | 65 | $792,631,749 |
16105 | Greene | TANNERSVILLE VILLAGE / TANNERSVILLE (V) | Upgrade Distribution System | 448 | $467,000 | 45 | $793,098,749 |
16129 | Greene | HENSONVILLE SYSTEM WINDHAM WD / WINDHAM (T) | Upgrade Transmission, Upgrade Distribution System | 400 | $467,000 | 45 | $793,565,749 |
15415 | Greene | CATSKILL VILLAGE / CATSKILL (V) | Other Expenses, New Ground Water Source, New Transmission, Other (OT) | 8,000 | $695,250 | 30 | $794,260,999 |
15419 | Greene | CATSKILL VILLAGE / CATSKILL (V) | Upgrade Distribution System | 8,000 | $1,390,500 | 30 | $795,651,499 |
15691 | Greene | SLEEPY HOLLOW LAKE WATER CO. / SLEEPY HOLLOW LAKE ASSOC. | Upgrade Surface Water Source, Upgrade Storage | 1,500 | $1,144,330 | 20 | $796,795,829 |
Hamilton | |||||||
16278 | Hamilton | LONG LAKE WD / LONG LAKE (T) | New Ground Water Source, New Storage, Upgrade Distribution System | 800 | $0 | 1,200 | $796,795,829 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
17456 | Hamilton | INDIAN LAKE WD / INDIAN LAKE (T) | New Surface Water Treatment Rule Compliance Facility, Upgrade Water Treatment Plant, New Ground Water Source, Upgrade Distribution System | 1,100 | $2,282,000 | 255 | $799,077,829 |
15813 | Hamilton | RAQUETTE LAKE WD / LONG LAKE (T) | New Surface Water Treatment Rule Compliance Facility, New Storage, Upgrade Distribution System | 85 | $717,551 | 215 | $799,795,380 |
15600 | Hamilton | ANTLERS OF RAQUETTE LAKE, INC. / ANTLERS OF RAQUETTE LAKE INC. | New Surface Water Source, Inter-Connection | 120 | $92,500 | 150 | $799,887,880 |
Herkimer | |||||||
17470 | Herkimer | HERKIMER VILLAGE / HERKIMER (V) | Phase 2 of 16676, New Surface Water Treatment Rule Compliance Facility | 9,950 | $200,000 | 2,130 | $800,087,880 |
15055 | Herkimer | LITTLE FALLS CITY / LITTLE FALLS (C) | New Surface Water Treatment Rule Compliance Facility | 5,800 | $0 | 1,130 | $800,087,880 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
16922 | Herkimer | GRAHM, NEWPORT & BROWN RD WD / SCHUYLER (T) | New system to serve area with private contaminated wells. , New Complete System (New System) | 260 | $0 | 1,085 | $800,087,880 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
15557 | Herkimer | POLAND VILLAGE / POLAND (V) | New Ground Water Source, New Storage, Upgrade Distribution System | 553 | $515,365 | 165 | $800,603,245 |
17178 | Herkimer | MOHAWK VILLAGE / MOHAWK (V) | New Storage, Extend Distribution System, Upgrade Distribution System, New System Consolidation | 2,985 | $3,814,000 | 115 | $804,417,245 |
17330 | Herkimer | VILLAGE OF COLD BROOK / COLD BROOK (V) | New Complete System (New System), New System Consolidation | 336 | $1,761,961 | 100 | $806,179,206 |
17422 | Herkimer | HERKIMER (T), WD #3, #4, #5 / HERKIMER (T) | 320 | $299,112 | 85 | $806,478,318 | |
16203 | Herkimer | EAST FRANKFORT WATER SYSTEM / FRANKFORT (T) | New Ground Water Source, New Storage, Upgrade Distribution System | 1,000 | $948,000 | 75 | $807,426,318 |
17311 | Herkimer | MANION HEIGHTS WD / GERMAN FLATTS (T) | New Complete System (New System) | 105 | $152,000 | 75 | $807,578,318 |
17280 | Herkimer | WEST FRANKFORT WATER DISTRICT / FRANKFORT (T) | New Complete System (New System) | 1,100 | $5,828,000 | 55 | $813,406,318 |
16656 | Herkimer | NEWPORT VILLAGE / NEWPORT (V) | Upgrade Storage, Upgrade Distribution System | 740 | $726,350 | 45 | $814,132,668 |
17055 | Herkimer | FRANKFORT VILLAGE / FRANKFORT (V) | 2,995 | $481,691 | 45 | $814,614,359 | |
17057 | Herkimer | FRANKFORT VILLAGE / FRANKFORT (V) | 2,995 | $1,971,007 | 45 | $816,585,366 | |
17048 | Herkimer | DOLGEVILLE VILLAGE PWS / DOLGEVILLE (V) | New Storage | 2,452 | $1,051,000 | 40 | $817,636,366 |
17096 | Herkimer | TRINITY CHRISTIAN SCHOOL / TRINITY CHRISTIAN SCHOOL | New Other Expenses, New Other (OT) | 12 | $1,400 | 30 | $817,637,766 |
16101 | Herkimer | MOHAWK VILLAGE / MOHAWK (V) | Fulmer Creek Stream Crossing., Upgrade Distribution System | 2,985 | $82,000 | 25 | $817,719,766 |
16103 | Herkimer | MOHAWK VILLAGE / MOHAWK (V) | Michigan, Green, Henry, Church Streets Main replacement, Upgrade Distribution System | 2,985 | $266,000 | 25 | $817,985,766 |
Jefferson | |||||||
17202 | Jefferson | BELLVILLE WD#2 / ELLISBURG (T) | Consolidation of Belleville-Henderson Central School which has E-coli and Nitrate MCL violations., Extend Distribution System, New System Consolidation | 355 | $0 | 1,225 | $817,985,766 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
15057 | Jefferson | ANTWERP VILLAGE / ANTWERP (V) | Upgrade Water Treatment Plant, Upgrade Ground Water Source, Upgrade Transmission, Upgrade Pump Station | 900 | $0 | 1,220 | $817,985,766 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
17103 | Jefferson | MANNSVILLE VILLAGE / MANNSVILLE (V) | New Surface Water Treatment Rule Compliance Facility, New Storage, New Distribution System | 500 | $500,000 | 1,190 | $818,485,766 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
16716 | Jefferson | GLEN PARK UPPER UTILITIES (V) / GLEN PARK (V) | New system to serve area with private contaminated wells. , New Storage, Extend Distribution System | 50 | $0 | 1,170 | $818,485,766 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
15908 | Jefferson | TOWN OF BROWNVILLE WATER DISTRICT NO. 1 / BROWNVILLE (T) | Extend system to serve area with private contaminated wells, consolidate public water supply, eliminate public water supply with past E. Coli detection. , Extend Distribution System, System Consolidation | 150 | $0 | 1,165 | $818,485,766 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
16910 | Jefferson | PIERREPONT MANOR WATER DISTRICT / ELLISBURG (T) | New system to serve area with private contaminated wells. , New Complete System (New System) | 250 | $0 | 1,160 | $818,485,766 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
17022 | Jefferson | SACKETS HARBOR VILLAGE / SACKETS HARBOR (V) | Extension to serve area with private contaminated wells. , Extend Distribution System | 1,300 | $629,630 | 1,100 | $819,115,396 |
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan | |||||||
17473 | Jefferson | LAFAVE ROAD WATER DISTRICT / LE RAY (T) | Consolidation of existing public water systems with GUDI wells, coliform and lead violations., New Distribution System, New System Consolidation | 600 | $6,388,443 | 280 | $825,503,839 |
17321 | Jefferson | WESTCOTTS WATER DISTRICT / HOUNSFIELD (T) | WD#3 to serve along NYS Route 3. Consolidation of PWS systems addressing SWTR & E-Coli violations., New Distribution System, New System Consolidation | 300 | $3,223,900 | 260 | $828,727,739 |
17045 | Jefferson | REDWOOD WATER DISTRICT / ALEXANDRIA (T) | New system to serve area with private contaminated wells, consolidate public water supply. , New Complete System (New System) | 500 | $7,235,436 | 215 | $835,963,175 |
15540 | Jefferson | THERESA VILLAGE / THERESA (V) | New Water Treatment Plant, Upgrade Storage, Upgrade Distribution System | 950 | $5,974,000 | 195 | $841,937,175 |
15940 | Jefferson | NATURAL BRIDGE WEST / WILNA (T) | Upgrade Ground Water Source, Upgrade Distribution System, System Consolidation | 72 | $875,000 | 175 | $842,812,175 |
17060 | Jefferson | TOWN OF CAPE VINCENT WD #4 / CAPE VINCENT (T) | New system to serve area with private contaminated wells, consolidate public water supply, eliminate public water supply with past total coliform detection. , Extend Distribution System, New System Consolidation, New Water District | 450 | $7,115,500 | 145 | $849,927,675 |
16339 | Jefferson | WELLESLEY ISLAND WATER CORP. / WELLESLEY ISLAND WATER CORP. | New Water Treatment Plant, New Surface Water Source | 548 | $2,336,000 | 140 | $852,263,675 |
17201 | Jefferson | VILLAGE OF ELLISBURG / ELLISBURG (V) | Extend system to serve area with private contaminated wells, consolidate public water supply, eliminate public water supply with past total coliform detection. , Extend Distribution System, New System Consolidation | 269 | $2,992,700 | 135 | $855,256,375 |
16117 | Jefferson | ALEXANDRIA TOWN WD #1 - OTTER STREET / ALEXANDRIA (T) | Extend Distribution System, Upgrade Distribution System | 60 | $2,182,573 | 120 | $857,438,948 |
16701 | Jefferson | LAFARGEVILLE (T. ORLEANS) / ORLEANS (T) | New Ground Water Source | 750 | $246,731 | 85 | $857,685,679 |
17474 | Jefferson | DEPAUVILLE WATER DISTRICT / CLAYTON (T) | New Distribution System, New System Consolidation | 200 | $6,333,529 | 85 | $864,019,208 |
15531 | Jefferson | TOWN OF PAMELIA RT. 3, WATER DISTRICT / PAMELIA (T) | Extend system to serve area with private contaminated wells, consolidate public water supply. , Extend Distribution System | 96 | $474,160 | 85 | $864,493,368 |
15344 | Jefferson | TOWN OF LYME WATER DIST. NO. 2 / LYME (T) | New Complete System (New System), New Distribution System | 130 | $2,388,662 | 80 | $866,882,030 |
15909 | Jefferson | TOWN OF WILNA WATER DISTRICTS NOS. 1,2,3, & 4 / WILNA (T) | New Surface Water Source, Upgrade Distribution System | 475 | $400,000 | 75 | $867,282,030 |
17098 | Jefferson | WILNA WD#1 / WILNA (T) | Extend system to serve area with private contaminated wells. , New Distribution System | 85 | $569,590 | 75 | $867,851,620 |
16921 | Jefferson | ADAMS (T) WD #2 / ADAMS (T) | New system to serve area with private contaminated wells. , New Complete System (New System) | 190 | $1,509,000 | 65 | $869,360,620 |
15561 | Jefferson | TOWN OF WATERTOWN / WATERTOWN (T) | New system to serve area with private contaminated wells. , New Complete System (New System), New Storage, New Distribution System | 530 | $2,547,476 | 60 | $871,908,096 |
15825 | Jefferson | TOWN OF CLAYTON WATER DISTRICT NO. 1 / CLAYTON (T) | New Complete System (New System) | 75 | $451,217 | 60 | $872,359,313 |
17306 | Jefferson | WATER DISTRICT #2 / HENDERSON (T) | New Distribution System | 352 | $2,854,000 | 55 | $875,213,313 |
17189 | Jefferson | WATER DISTRICT #5 / CAPE VINCENT (T) | New system to serve area with private contaminated wells. , New Distribution System | 100 | $1,085,200 | 55 | $876,298,513 |
17475 | Jefferson | WD#1 (RTE. 37) / THERESA (T) | New Distribution System | 20 | $277,160 | 55 | $876,575,673 |
15240 | Jefferson | ALEXANDRIA BAY VILLAGE / ALEXANDRIA BAY (V) | Upgrade Surface Water Source, Upgrade Storage, Upgrade Distribution System | 1,900 | $3,048,188 | 50 | $879,623,861 |
17320 | Jefferson | HOUNSFIELD WD#2 EXTENSION / HOUNSFIELD (T) | New Distribution System | 200 | $3,900,000 | 50 | $883,523,861 |
17058 | Jefferson | TOWN OF HOUNSFIELD WD #2 EXTENSION / HOUNSFIELD (T) | Extend Distribution System | 123 | $794,439 | 50 | $884,318,300 |
17185 | Jefferson | WATERTOWN TOWN WD 2 / WATERTOWN (T) | New Distribution System | 100 | $1,435,865 | 50 | $885,754,165 |
17305 | Jefferson | MORGIAS BEACH WATER SYSTEM / SACKETS HARBOR (V) | New Distribution System | 65 | $500,000 | 50 | $886,254,165 |
15603 | Jefferson | LODI-FOSTER PARK WATER DISTRICT / HOUNSFIELD (T) | New Complete System (New System), New Distribution System | 61 | $832,755 | 50 | $887,086,920 |
16096 | Jefferson | DEXTER VILLAGE / DEXTER (V) | New Storage, Upgrade Distribution System | 1,100 | $757,125 | 40 | $887,844,045 |
15309 | Jefferson | WATERTOWN, CITY OF / WATERTOWN (C) | Upgrade Distribution System | 27,861 | $152,955 | 35 | $887,997,000 |
16256 | Jefferson | PHILADELPHIA VILLAGE / PHILADELPHIA (V) | Upgrade Distribution System | 1,800 | $257,440 | 35 | $888,254,440 |
17465 | Jefferson | HIGHWAY GARAGE WD / HOUNSFIELD (T) | 200 | $3,035,853 | 35 | $891,290,293 | |
15789 | Jefferson | CHAUMONT VILLAGE / CHAUMONT (V) | Upgrade Storage, Upgrade Distribution System | 625 | $178,961 | 30 | $891,469,254 |
17301 | Jefferson | ADAMS VILLAGE / ADAMS (V) | Upgrade Transmission, Upgrade Distribution System | 2,000 | $450,000 | 30 | $891,919,254 |
17308 | Jefferson | BROWNVILLE VILLAGE / BROWNVILLE (V) | Upgrade Distribution System | 1,200 | $574,000 | 25 | $892,493,254 |
15893 | Jefferson | ADAMS (T) WD #1 & 2 (ADAMS CENTER) / ADAMS CENTER (T) | Upgrade Storage | 700 | $121,954 | 25 | $892,615,208 |
16481 | Jefferson | VILLAGE OF CLAYTON / CLAYTON (V) | New Transmission, New Distribution System | 2,160 | $214,000 | 25 | $892,829,208 |
17466 | Jefferson | SACKETS HARBOR VILLAGE / SACKETS HARBOR (V) | Upgrade Water Treatment Plant | 1,300 | $1,952,500 | 20 | $894,781,708 |
16549 | Jefferson | NORTHLAND ESTATES / NORTHLAND PARK INC. | New Storage | 540 | $82,416 | 20 | $894,864,124 |
17464 | Jefferson | ROUTE 12F WD / HOUNSFIELD (T) | 144 | $5,406,750 | 15 | $900,270,874 | |
Lewis | |||||||
16953 | Lewis | CONSOLIDATED WD#1 (T) LOWVVILLE / LOWVILLE (T) | New Surface Water Treatment Rule Compliance Facility, Upgrade Storage, Extend Distribution System, Upgrade Distribution System, New System Consolidation | 280 | $3,200,000 | 250 | $903,470,874 |
16635 | Lewis | COPENHAGEN VILLAGE / COPENHAGEN (V) | New Ground Water Source, Upgrade Distribution System | 850 | $2,509,731 | 170 | $905,980,605 |
16482 | Lewis | PORT LEYDEN VILLAGE / PORT LEYDEN (V) | Upgrade Distribution System | 820 | $910,000 | 30 | $906,890,605 |
16667 | Lewis | TURIN VILLAGE / TURIN (V) | Upgrade Distribution System | 350 | $611,588 | 25 | $907,502,193 |
16683 | Lewis | CONSTABLEVILLE VILLAGE / CONSTABLEVILLE (V) | Upgrade Transmission | 310 | $1,274,936 | 20 | $908,777,129 |
Livingston | |||||||
15475 | Livingston | AVON TOWN WATER DISTRICT / LIVINGSTON COUNTY | Upgrade Distribution System, Inter-Connection | 2,075 | $2,233,040 | 85 | $911,010,169 |
17369 | Livingston | GROVELAND STATION WATER CO / LIVINGSTON COUNTY WATER & SEWE | Acquisition of private water system by Towns of Groveland and Sparta. , Upgrade Distribution System, Extend Distribution System, New Water District | 300 | $1,534,154 | 80 | $912,544,323 |
17317 | Livingston | LIVINGSTON COUNTY WATER DISTRICT NO . 2 / LIVINGSTON COUNTY | Extend Distribution System, System Consolidation | 835 | $3,200,000 | 80 | $915,744,323 |
17182 | Livingston | TOWN OF MOUNT MORRIS / MOUNT MORRIS (T) | Route 408 into Tuscarora., Extend Distribution System | 700 | $5,824,804 | 65 | $921,569,127 |
15706 | Livingston | LIVINGSTON COUNTY WATER DISTRICT / LIVINGSTON COUNTY | Extend water system along swamp road in (T) Conesus to Hamlet of Scottsburg in (T) Sparta., Extend Distribution System | 250 | $1,627,400 | 60 | $923,196,527 |
15322 | Livingston | TOWN OF MT. MORRIS / MOUNT MORRIS (T) | Extend Distribution System | 100 | $1,574,600 | 60 | $924,771,127 |
15613 | Livingston | TOWN OF YORK DISTRICT NO. 2 / YORK (T) | Extend Distribution System | 350 | $526,330 | 55 | $925,297,457 |
15697 | Livingston | LIVINGSTON COUNTY WATER DISTRICT / LIVINGSTON COUNTY | Hamlet of Conesus., Extend Distribution System | 230 | $1,326,575 | 55 | $926,624,032 |
15693 | Livingston | LIVINGSTON COUNTY WATER DISTRICT / LIVINGSTON COUNTY | East Lake Rd. in (T) of Conesus., Extend Distribution System | 1,200 | $2,306,055 | 45 | $928,930,087 |
15604 | Livingston | COWAN ROAD WATER DISTRICT / YORK (T) | Extend Distribution System | 120 | $885,548 | 45 | $929,815,635 |
15308 | Livingston | EAST LAKE ROAD WATER DISTRICT / LIVONIA (T) | Extend Distribution System | 1,450 | $2,093,140 | 40 | $931,908,775 |
15154 | Livingston | NUNDA VILLAGE / NUNDA (V) | Upgrade Ground Water Source, New Transmission | 1,200 | $640,155 | 25 | $932,548,930 |
16585 | Livingston | GENESEO (T) WD #2 / GENESEO (T) | New Storage, Upgrade Distribution System | 436 | $1,377,000 | 25 | $933,925,930 |
16584 | Livingston | GENESEO (T) WD #1 / GENESEO (T) | New Storage, Upgrade Distribution System | 215 | $819,000 | 25 | $934,744,930 |
16678 | Livingston | AVON VILLAGE PWS / AVON (V) | Upgrade Transmission | 6,714 | $1,442,000 | 25 | $936,186,930 |
16961 | Livingston | AVON TOWN WATER DISTRICT / AVON (T) | Airport Tank to Village of Avon Water Treatment Plant., New Transmission | 2,075 | $593,048 | 20 | $936,779,978 |
16972 | Livingston | AVON TOWN WATER DISTRICT / AVON (T) | Poplar Hill Road to Bronson Hill Road., New Transmission | 2,075 | $1,322,712 | 20 | $938,102,690 |
16689 | Livingston | GROVELAND STATION WATER CO / GROVELAND STATION WATER CORP. | New Ground Water Source | 300 | $93,730 | 20 | $938,196,420 |
17257 | Livingston | CALEDONIA VILLAGE / CALEDONIA (V) | State Street watermain replacement., Upgrade Transmission | 2,165 | $528,678 | 15 | $938,725,098 |
16958 | Livingston | AVON TOWN WATER DISTRICT / AVON (T) | Agar Road watermain., New Transmission | 2,075 | $198,842 | 15 | $938,923,940 |
16962 | Livingston | AVON TOWN WATER DISTRICT / AVON (T) | Paper Mill Road., New Transmission | 2,075 | $757,822 | 15 | $939,681,762 |
16964 | Livingston | AVON TOWN WATER DISTRICT / AVON (T) | Fowlerville Road watermain., New Transmission | 2,075 | $354,577 | 15 | $940,036,339 |
16971 | Livingston | AVON TOWN WATER DISTRICT / AVON (T) | Henty Road Watermain., New Transmission | 2,075 | $396,988 | 15 | $940,433,327 |
16973 | Livingston | AVON TOWN WATER DISTRICT / AVON (T) | Route 5&20 Storage Tank Cleaning and Repair., Upgrade Storage | 2,075 | $139,050 | 15 | $940,572,377 |
16974 | Livingston | AVON TOWN WATER DISTRICT / AVON (T) | Lima Town Line Storage Tank Cleaning and Repair., Upgrade Storage | 2,075 | $132,098 | 15 | $940,704,475 |
16965 | Livingston | AVON TOWN WATER DISTRICT / AVON (T) | Pole Bridge Road., Upgrade Distribution System | 2,075 | $245,840 | 10 | $940,950,315 |
16967 | Livingston | AVON TOWN WATER DISTRICT / AVON (T) | Lakeville Road PRV Station., New Distribution System | 2,075 | $111,240 | 10 | $941,061,555 |
16968 | Livingston | AVON TOWN WATER DISTRICT / AVON (T) | Genesee Street and Lake Road PRV Station., New Distribution System | 2,075 | $18,077 | 10 | $941,079,632 |
16970 | Livingston | AVON TOWN WATER DISTRICT / AVON (T) | Jones Lane/Darby Road., Upgrade Distribution System | 2,075 | $356,315 | 10 | $941,435,947 |
16975 | Livingston | AVON TOWN WATER DISTRICT / AVON (T) | Telemetry System., Upgrade Storage | 2,075 | $243,338 | 10 | $941,679,285 |
15131 | Livingston | LIVONIA VILLAGE / LIVONIA (V) | Upgrade Distribution System | 1,360 | $1,105,325 | 10 | $942,784,610 |
Madison | |||||||
17028 | Madison | HAMILTON VILLAGE / HAMILTON (V) | Phase 2 of project #16535, New Storage, Upgrade Distribution System | 3,904 | $40,000 | 2,145 | $942,824,610 |
16705 | Madison | MADISON VILLAGE / MADISON (V) | New Ground Water Source, Upgrade Distribution System | 450 | $103,500 | 135 | $942,928,110 |
16654 | Madison | MORRISVILLE VILLAGE / MORRISVILLE (V) | To provide adequate pressure, Upgrade Distribution System | 2,148 | $1,300,000 | 95 | $944,228,110 |
17360 | Madison | NEW BOSTON ROAD WATER DISTRICT / LENOX (T) | New System Consolidation, New Water District | 56 | $424,923 | 85 | $944,653,033 |
17278 | Madison | MOUNT PLEASANT (CAZ.CNTRY EST) / CAZENOVIA (T) | Upgrade Ground Water Source, Upgrade Storage | 90 | $225,000 | 65 | $944,878,033 |
16410 | Madison | ONEIDA CITY / ONEIDA (C) | Extend Distribution System | 12,000 | $350,000 | 65 | $945,228,033 |
16408 | Madison | ONEIDA CITY / ONEIDA (C) | New Distribution System | 12,000 | $1,600,000 | 60 | $946,828,033 |
17359 | Madison | LEWIS POINT/PINE RIDGE ROAD / LENOX (T) | New Water District | 210 | $1,192,230 | 60 | $948,020,263 |
17415 | Madison | STOCKBRIDGE WATER DISTRICT / STOCKBRIDGE (T) | 600 | $2,275,000 | 55 | $950,295,263 | |
16404 | Madison | ONEIDA CITY / ONEIDA (C) | Replace lead water lines., Upgrade Distribution System | 12,000 | $400,000 | 50 | $950,695,263 |
16407 | Madison | ONEIDA CITY / ONEIDA (C) | construct 300,000 water storage tank., New Storage | 12,000 | $750,000 | 40 | $951,445,263 |
17286 | Madison | COBBLEFIELD ESTATES W.D. / CAZENOVIA (T) | Upgrade Water Treatment Plant | 120 | $225,000 | 30 | $951,670,263 |
15156 | Madison | EARLVILLE VILLAGE / EARLVILLE (V) | Upgrade Distribution System | 960 | $665,020 | 25 | $952,335,283 |
15268 | Madison | EARLVILLE VILLAGE / EARLVILLE (V) | East Main Street., Upgrade Distribution System | 960 | $96,509 | 25 | $952,431,792 |
15260 | Madison | ERIEVILLE WATER SUPPLY / NELSON (T) | Upgrade Water Treatment Plant, New Ground Water Source, Upgrade Pump Station | 150 | $350,000 | 15 | $952,781,792 |
16708 | Madison | O-WE-RA POINT WATER SUPPLY / OWERA WATER WORKS TRANS. CORP. | Upgrade Distribution System | 100 | $21,000 | 15 | $952,802,792 |
Monroe | |||||||
16323 | Monroe | MCWA EASTSIDE WTP / MCWA | Eastside Water Supply Project Regional Water Treatment Plant Phase 1, Raw Water Intake System, New Surface Water Source | 222,503 | $21,000,000 | 100 | $973,802,792 |
16324 | Monroe | MCWA EASTSIDE WTP / MCWA | Eastside Water Supply Project Regional Water Treatment Plant Phase 2, Raw Water Pump Station, New Water Treatment Plant, New Pump Station | 222,503 | $15,000,000 | 100 | $988,802,792 |
16325 | Monroe | MCWA EASTSIDE WTP / MCWA | Eastside Water Supply Project Regional Water Treatment Plant Phase 3, Construction of WTP., New Water Treatment Plant | 222,503 | $60,000,000 | 100 | $1,048,802,792 |
16326 | Monroe | MCWA EASTSIDE WTP / MCWA | Eastside Water Supply Project Regional Water Treatment Plant Phase 4, Raw Water Transmission Main & Backwash Return Line, New Water Treatment Plant, New Transmission | 222,503 | $16,000,000 | 100 | $1,064,802,792 |
16327 | Monroe | MCWA EASTSIDE WTP / MCWA | Eastside Water Supply Project Regional Water Treatment Plant Phase 5, Finished Water Transmission Mains, New Water Treatment Plant, New Transmission | 222,503 | $28,000,000 | 100 | $1,092,802,792 |
16879 | Monroe | ROCHESTER CITY / ROCHESTER (C) | 2003 Watermain Extensions and Improvements., Upgrade Distribution System | 220,000 | $1,348,000 | 75 | $1,094,150,792 |
17153 | Monroe | ROCHESTER CITY / ROCHESTER (C) | 2004 Watermain Extensions and Improvements., Upgrade Distribution System | 220,000 | $1,219,000 | 75 | $1,095,369,792 |
17154 | Monroe | ROCHESTER CITY / ROCHESTER (C) | 2005 Watermain Extensions and Improvements., Upgrade Distribution System | 220,000 | $1,240,000 | 75 | $1,096,609,792 |
17155 | Monroe | ROCHESTER CITY / ROCHESTER (C) | 2006 Watermain Extensions and Improvements., Upgrade Distribution System | 220,000 | $1,261,000 | 75 | $1,097,870,792 |
16328 | Monroe | MCWA SHOREMONT WTP / MONROE CO. WATER AUTHORITY | Upgrade Surface Water Source | 235,870 | $1,854,000 | 55 | $1,099,724,792 |
16884 | Monroe | SOUTH CHILI WATER IMP. BENEFIT AREA NO. 2 / CHILI (T) | Extend Distribution System | 100 | $386,250 | 45 | $1,100,111,042 |
16331 | Monroe | MCWA MENDON WD / MCWA/MENDON (T) | Mendon-Ionia Road., Extend Distribution System | 25 | $342,580 | 45 | $1,100,453,622 |
16332 | Monroe | MCWA MENDON WD / MCWA/MENDON (T) | Parrish Road., Extend Distribution System | 25 | $745,662 | 45 | $1,101,199,284 |
16333 | Monroe | MCWA MENDON WD / MONROE CO. WATER AUTHORITY | Boughton Hill Road., Extend Distribution System | 25 | $1,085,842 | 45 | $1,102,285,126 |
16738 | Monroe | SPRUCE LANE WATER DISTRICT / PITTSFORD (T) | Upgrade Distribution System | 30 | $60,770 | 40 | $1,102,345,896 |
15198 | Monroe | ROCHESTER CITY / ROCHESTER (C) | Water Main Extensions and Improvements., Upgrade Transmission | 220,000 | $1,946,200 | 40 | $1,104,292,096 |
16330 | Monroe | MCWA SHOREMONT WTP / MONROE CO. WATER AUTHORITY | System Consolidation | 235,870 | $1,772,057 | 40 | $1,106,064,153 |
15620 | Monroe | HAMLIN CONSOLIDATED WATER DIST / HAMLIN (T) | Route 18., Extend Distribution System | 10,000 | $876,742 | 40 | $1,106,940,895 |
15623 | Monroe | HAMLIN CONSOLIDATED WATER DIST / HAMLIN (T) | Walker - Lake Ontario Road., Extend Distribution System | 10,000 | $378,657 | 40 | $1,107,319,552 |
16166 | Monroe | HAMLIN CONSOLIDATED WATER DIST / HAMLIN (T) | Benedict Beach water main., Extend Distribution System | 10,000 | $369,212 | 40 | $1,107,688,764 |
15659 | Monroe | MONROE CO. WATER AUTHORITY / WHEATLAND (T) | Wheatland Center Road water extension to Blue Pond and South Road., Extend Distribution System | 250 | $1,252,600 | 40 | $1,108,941,364 |
15148 | Monroe | OGDEN (T) / OGDEN (T) | Extend Distribution System | 171 | $429,330 | 40 | $1,109,370,694 |
15035 | Monroe | MCWA RIGA WD / MCWA/RIGA (T) | Route 36 - Sanford Road., Extend Distribution System | 25 | $221,610 | 40 | $1,109,592,304 |
15037 | Monroe | MCWA RIGA WD / MCWA/RIGA (T) | Betteridge-Griffin Roads., Extend Distribution System | 25 | $199,893 | 40 | $1,109,792,197 |
15759 | Monroe | MCWA MENDON WD / MCWA/ MENDON (T) | Semmel Road water main., Extend Distribution System | 25 | $267,615 | 40 | $1,110,059,812 |
16603 | Monroe | MCWA MENDON WD / MENDON (T) | Rte. 251-Rush/Mendon Road., Extend Distribution System | 25 | $159,650 | 40 | $1,110,219,462 |
16605 | Monroe | MCWA MENDON WD / MENDON (T) | Main Street Fishers and Mile Square Rd., Extend Distribution System | 25 | $148,686 | 40 | $1,110,368,148 |
16777 | Monroe | HENRIETTA WD #1 / HENRIETTA (T) | RIT Backflow Prevention Project., Upgrade Distribution System | 36,400 | $360,500 | 15 | $1,110,728,648 |
17216 | Monroe | FAIRPORT VILLAGE / FAIRPORT (V) | Replace distribution main on South Avenue., Upgrade Distribution System | 9,800 | $86,310 | 10 | $1,110,814,958 |
Montgomery | |||||||
16765 | Montgomery | PALATINE WATER DISTRICT / PALATINE (T) | Creation of a water quality treatment district and provision of filtration., New Water District | 108 | $167,000 | 130 | $1,110,981,958 |
15040 | Montgomery | PALATINE BRIDGE WATER WORKS / PALANTINE BRIDGE (V) | Upgrade Water Treatment Plant, Upgrade Ground Water Source, Upgrade Distribution System | 890 | $788,600 | 65 | $1,111,770,558 |
16272 | Montgomery | VILLAGE OF FORT JOHNSON / FORT JOHNSON (V) | Extend Distribution System | 671 | $2,905,751 | 55 | $1,114,676,309 |
17469 | Montgomery | FORT PLAIN VILLAGE WATER WORKS / FT. PLAIN (V) | 2,400 | $217,845 | 45 | $1,114,894,154 | |
15276 | Montgomery | GLEN (T) W.D.#1 / GLEN (T) | Extend Distribution System | 5,000 | $950,000 | 45 | $1,115,844,154 |
16919 | Montgomery | CANAJOHARIE VILLAGE WATER WORK / CANAJOHARIE (V) | Upgrade Distribution System | 2,300 | $453,948 | 35 | $1,116,298,102 |
15274 | Montgomery | GLEN (T) W.D.#2 / GLEN (T) | Upgrade Distribution System | 7,626 | $95,000 | 15 | $1,116,393,102 |
Nassau | |||||||
17405 | Nassau | PLAINVIEW WD / OYSTER BAY (T) | Airstripper and Ion Exchange at Plant 3, New Water Treatment Plant | 35,000 | $5,889,600 | 120 | $1,122,282,702 |
15048 | Nassau | MINEOLA (V) / MINEOLA (V) | New Water Treatment Plant | 20,600 | $1,855,238 | 120 | $1,124,137,940 |
16789 | Nassau | GLEN COVE CITY / GLEN COVE (C) | Seaman Road Well., New Water Treatment Plant, Upgrade Ground Water Source | 28,000 | $805,059 | 85 | $1,124,942,999 |
16791 | Nassau | GLEN COVE CITY / GLEN COVE (C) | GAC treatment for wells 30 and 31 Duck Pond Rd., New Water Treatment Plant, Upgrade Ground Water Source | 28,000 | $490,486 | 85 | $1,125,433,485 |
17406 | Nassau | PLAINVIEW WD / OYSTER BAY (T) | Ion exchange treatment at Plant 4., Upgrade Water Treatment Plant | 35,000 | $3,667,600 | 80 | $1,129,101,085 |
15675 | Nassau | MANHASSET LAKEVILLE WD / NORTH HEMPSTEAD (T) | Campbell Station, New Water Treatment Plant | 43,000 | $5,974,000 | 70 | $1,135,075,085 |
15678 | Nassau | MANHASSET LAKEVILLE WD / NORTH HEMPSTEAD (T) | Install carbon absorption system at Eden Well, New Water Treatment Plant | 43,000 | $477,920 | 70 | $1,135,553,005 |
16423 | Nassau | MASSAPEQUA WD / OYSTER BAY (T) | Wells #1, 2R, 3, 8, New Water Treatment Plant | 43,000 | $2,895,330 | 70 | $1,138,448,335 |
17404 | Nassau | PLAINVIEW WD / OYSTER BAY (T) | New air stripper at Plant 7, New Water Treatment Plant | 35,000 | $1,287,500 | 70 | $1,139,735,835 |
17408 | Nassau | PLAINVIEW WD / OYSTER BAY (T) | Air stripper at Plant 1, New Water Treatment Plant | 35,000 | $6,759,000 | 70 | $1,146,494,835 |
16411 | Nassau | GLEN COVE CITY / GLEN COVE (C) | New Water Treatment Plant | 28,000 | $2,100,000 | 70 | $1,148,594,835 |
17271 | Nassau | ALBERTSON WD / NORTH HEMPSTEAD (T) | New treatment plant, rehab control building, chemical containment, instrumentation, transmission lines and booster pump, New Water Treatment Plant | 13,500 | $3,613,900 | 60 | $1,152,208,735 |
16267 | Nassau | HEMPSTEAD (V) / HEMPSTEAD (V) | Upgrade Storage | 56,000 | $5,483,200 | 60 | $1,157,691,935 |
15213 | Nassau | WESTBURY WD / WESTBURY W.D. | New Water Treatment Plant | 20,500 | $4,120,000 | 60 | $1,161,811,935 |
17037 | Nassau | EAST WILLISTON (V) / EAST WILLISTON (V) | Replacement of lead service lines to about 120 residences, New Other Expenses, New Other (OT) | 2,503 | $456,000 | 60 | $1,162,267,935 |
16456 | Nassau | EAST MEADOW WD / HEMPSTEAD (T) | New Ground Water Source, Upgrade Distribution System | 46,950 | $3,100,000 | 55 | $1,165,367,935 |
17410 | Nassau | PLAINVIEW WD / OYSTER BAY (T) | Upgrade booster pump at Plant 6 and new well at Plant 7, New Ground Water Source, Upgrade Pump Station | 35,000 | $2,206,200 | 50 | $1,167,574,135 |
16760 | Nassau | ROCKVILLE CENTRE (V) / ROCKVILLE (V) | Design & construction new iron filtration facility at wellfield # 1, southside high school, iron removing plant, New Water Treatment Plant | 24,700 | $3,012,750 | 50 | $1,170,586,885 |
15046 | Nassau | MINEOLA (V) / MINEOLA (V) | New Water Treatment Plant | 20,600 | $846,248 | 50 | $1,171,433,133 |
16627 | Nassau | CARLE PLACE WD / CARLE PLACE WD | Wells #3 & #4, Terrace Drive, Carle Place, NY, New Water Treatment Plant | 9,005 | $1,510,800 | 50 | $1,172,943,933 |
15335 | Nassau | SOUTH FARMINGDALE WD / SOUTH FARMINGDALE W.D. | Iron Removal at Plants 5 & 6, Upgrade Water Treatment Plant | 44,700 | $2,369,000 | 50 | $1,175,312,933 |
17318 | Nassau | AQUARION WATER COMPANY OF SEA CLIFF / SEA CLIFF WATER COMPANY | New Storage | 15,000 | $1,371,000 | 40 | $1,176,683,933 |
17409 | Nassau | PLAINVIEW WD / OYSTER BAY (T) | Air stripper at Plant 2, New Water Treatment Plant | 35,000 | $4,403,400 | 40 | $1,181,087,333 |
15369 | Nassau | WA OF GREAT NECK NORTH / WATER AUTH. OF GREAT NECK NO. | 2 new well sources, New Ground Water Source | 31,400 | $6,118,000 | 40 | $1,187,205,333 |
16429 | Nassau | MASSAPEQUA WD / OYSTER BAY (T) | Proposed New Well No 9, New Ground Water Source | 43,000 | $1,588,650 | 25 | $1,188,793,983 |
16385 | Nassau | HEMPSTEAD (V) / HEMPSTEAD (V) | Upgrade Ground Water Source | 56,000 | $4,715,340 | 20 | $1,193,509,323 |
15668 | Nassau | MANHASSET LAKEVILLE WD / NORTH HEMPSTEAD (T) | Replace aged and/or undersized mains, Upgrade Distribution System | 43,000 | $716,880 | 20 | $1,194,226,203 |
15281 | Nassau | ALBERTSON WD / NORTH HEMPSTEAD (T) | Well #4 Replacement of Screen and Well Pump, Upgrade Ground Water Source | 13,500 | $188,044 | 20 | $1,194,414,247 |
16630 | Nassau | CARLE PLACE WD / CARLE PLACE WD | Old Country Road, Carle Place, NY, New Storage | 9,005 | $1,778,200 | 20 | $1,196,192,447 |
17343 | Nassau | WILLISTON PARK (V) / WILLISTON PARK (V) | Replace underground fuel tank, Emergency power Well#4, New Other Expenses, New Other (OT) | 7,516 | $415,605 | 20 | $1,196,608,052 |
16419 | Nassau | SANDS POINT (V) / SANDS POINT (V) | Upgrade Ground Water Source, New Ground Water Source | 2,800 | $1,500,000 | 15 | $1,198,108,052 |
15332 | Nassau | SOUTH FARMINGDALE WD / SOUTH FARMINGDALE W.D. | Elevated Tank Repairs & Repainting, Upgrade Storage | 44,700 | $616,000 | 15 | $1,198,724,052 |
15340 | Nassau | SOUTH FARMINGDALE WD / SOUTH FARMINGDALE W.D. | Well Rehabilitation & Well Pump/Motor Replacement-Various well sites, Upgrade Ground Water Source | 44,700 | $597,000 | 15 | $1,199,321,052 |
15341 | Nassau | SOUTH FARMINGDALE WD / SOUTH FARMINGDALE W.D. | Filter at Plant 2 Modernization, Upgrade Water Treatment Plant | 44,700 | $308,000 | 15 | $1,199,629,052 |
15597 | Nassau | MANHASSET LAKEVILLE WD / NORTH HEMPSTEAD (T) | Construct new ground level storage tank, New Storage | 43,000 | $955,840 | 15 | $1,200,584,892 |
15605 | Nassau | MANHASSET LAKEVILLE WD / NORTH HEMPSTEAD (T) | Construct a new booster pumping station, New Pump Station | 43,000 | $477,920 | 15 | $1,201,062,812 |
15628 | Nassau | MANHASSET LAKEVILLE WD / NORTH HEMPSTEAD (T) | Replace 4 inch mains, Upgrade Distribution System | 43,000 | $1,075,320 | 15 | $1,202,138,132 |
15672 | Nassau | MANHASSET LAKEVILLE WD / NORTH HEMPSTEAD (T) | Install new water mains to eliminate dead ends, Upgrade Distribution System | 43,000 | $1,075,320 | 15 | $1,203,213,452 |
15682 | Nassau | MANHASSET LAKEVILLE WD / NORTH HEMPSTEAD (T) | New transmission from wells to the Campbell treatment facility, New Transmission | 43,000 | $836,360 | 15 | $1,204,049,812 |
16417 | Nassau | MASSAPEQUA WD / OYSTER BAY (T) | Well No 1 Replacement of screen and well pump, Upgrade Ground Water Source | 43,000 | $290,769 | 15 | $1,204,340,581 |
16421 | Nassau | MASSAPEQUA WD / OYSTER BAY (T) | Well No 3 Replacement of Screen and Well Pump, Upgrade Ground Water Source | 43,000 | $237,278 | 15 | $1,204,577,859 |
16425 | Nassau | MASSAPEQUA WD / OYSTER BAY (T) | Well No 4 Replacement of screen and well pump, Upgrade Ground Water Source | 43,000 | $304,906 | 15 | $1,204,882,765 |
16426 | Nassau | MASSAPEQUA WD / OYSTER BAY (T) | Well No 6 Replacement of screen and well pump, Upgrade Ground Water Source | 43,000 | $319,588 | 15 | $1,205,202,353 |
16428 | Nassau | MASSAPEQUA WD / OYSTER BAY (T) | Well No 7 Replacement of screen and well pump, Upgrade Ground Water Source | 43,000 | $335,131 | 15 | $1,205,537,484 |
16433 | Nassau | MASSAPEQUA WD / OYSTER BAY (T) | Replacement of asbestos cement water mains, Upgrade Distribution System | 43,000 | $1,353,111 | 15 | $1,206,890,595 |
16458 | Nassau | LEVITTOWN WD / HEMPSTEAD (T) | New Ground Water Source, New Transmission | 41,800 | $4,025,000 | 15 | $1,210,915,595 |
15257 | Nassau | PLAINVIEW WD / OYSTER BAY (T) | Repair 2.0 mg ground storage tank at Plant 5, Upgrade Storage | 35,000 | $309,834 | 15 | $1,211,225,429 |
15261 | Nassau | PLAINVIEW WD / OYSTER BAY (T) | Upgrade Water Treatment Plant | 35,000 | $2,465,614 | 15 | $1,213,691,043 |
15262 | Nassau | PLAINVIEW WD / OYSTER BAY (T) | Repair 1.5 MG ground storage tank at Plant 4, Upgrade Storage | 35,000 | $258,694 | 15 | $1,213,949,737 |
17407 | Nassau | PLAINVIEW WD / OYSTER BAY (T) | Rehabilitation of Plant 5, Upgrade Water Treatment Plant | 35,000 | $5,584,500 | 15 | $1,219,534,237 |
15452 | Nassau | PORT WASHINGTON WD / NORTH HEMPSTEAD (T) | Upgrade Storage | 34,000 | $412,000 | 15 | $1,219,946,237 |
15460 | Nassau | PORT WASHINGTON WD / NORTH HEMPSTEAD (T) | Construct New Well #4, Upgrade Ground Water Source | 34,000 | $1,428,000 | 15 | $1,221,374,237 |
15461 | Nassau | PORT WASHINGTON WD / NORTH HEMPSTEAD (T) | New Transmission | 34,000 | $476,000 | 15 | $1,221,850,237 |
15371 | Nassau | WA OF GREAT NECK NORTH / WATER AUTH. OF GREAT NECK NO. | Construction of a replacement well for well no. 10, Upgrade Ground Water Source | 31,400 | $301,200 | 15 | $1,222,151,437 |
15373 | Nassau | WA OF GREAT NECK NORTH / WATER AUTH. OF GREAT NECK NO. | Construction of a replacement well for well no. 2, Upgrade Ground Water Source | 31,400 | $292,600 | 15 | $1,222,444,037 |
15375 | Nassau | WA OF GREAT NECK NORTH / WATER AUTH. OF GREAT NECK NO. | Transmission from Weybridge Rd. tank to King Point Rd. and Red Brook Rd., New Transmission | 31,400 | $1,934,000 | 15 | $1,224,378,037 |
15377 | Nassau | WA OF GREAT NECK NORTH / WATER AUTH. OF GREAT NECK NO. | Water Mill Lane, New Storage, New Pump Station | 31,400 | $2,567,000 | 15 | $1,226,945,037 |
15381 | Nassau | WA OF GREAT NECK NORTH / WATER AUTH. OF GREAT NECK NO. | Transmission main from the Weybridge Road tank to Oxford Boulevard, New Transmission | 31,400 | $431,000 | 15 | $1,227,376,037 |
15383 | Nassau | WA OF GREAT NECK NORTH / WATER AUTH. OF GREAT NECK NO. | 0.5 MG storage tank, New Storage | 31,400 | $1,566,500 | 15 | $1,228,942,537 |
15313 | Nassau | ROCKVILLE CENTRE (V) / ROCKVILLE CENTRE (V) | Tank #4 rehabilitation, Upgrade Storage | 24,700 | $2,940,052 | 15 | $1,231,882,589 |
15351 | Nassau | ROCKVILLE CENTRE (V) / ROCKVILLE CENTRE (V) | Rehab Wells 4a & 4b, Upgrade Ground Water Source | 24,700 | $254,874 | 15 | $1,232,137,463 |
15356 | Nassau | ROCKVILLE CENTRE (V) / ROCKVILLE CENTRE (V) | Rehab tank #2, Upgrade Storage | 24,700 | $614,185 | 15 | $1,232,751,648 |
15359 | Nassau | ROCKVILLE CENTRE (V) / ROCKVILLE CENTRE (V) | Rehab. wells 1a & 1b, Upgrade Ground Water Source | 24,700 | $153,017 | 15 | $1,232,904,665 |
15363 | Nassau | ROCKVILLE CENTRE (V) / ROCKVILLE CENTRE (V) | Rehab. Tank #1, Upgrade Storage | 24,700 | $999,100 | 15 | $1,233,903,765 |
15364 | Nassau | ROCKVILLE CENTRE (V) / ROCKVILLE CENTRE (V) | Rehab. well 4a, Upgrade Ground Water Source | 24,700 | $337,325 | 15 | $1,234,241,090 |
15366 | Nassau | ROCKVILLE CENTRE (V) / ROCKVILLE CENTRE (V) | Replace treatment pump, Upgrade Water Treatment Plant | 24,700 | $45,320 | 15 | $1,234,286,410 |
15370 | Nassau | ROCKVILLE CENTRE (V) / ROCKVILLE CENTRE (V) | Rehab well 2b, Upgrade Ground Water Source | 24,700 | $161,916 | 15 | $1,234,448,326 |
15374 | Nassau | ROCKVILLE CENTRE (V) / ROCKVILLE CENTRE (V) | Rehab well 3a, Upgrade Ground Water Source | 24,700 | $290,975 | 15 | $1,234,739,301 |
15378 | Nassau | ROCKVILLE CENTRE (V) / ROCKVILLE CENTRE (V) | Rehab well 2c, Upgrade Ground Water Source | 24,700 | $257,500 | 15 | $1,234,996,801 |
15380 | Nassau | ROCKVILLE CENTRE (V) / ROCKVILLE CENTRE (V) | Rehab well 4c, Upgrade Ground Water Source | 24,700 | $257,500 | 15 | $1,235,254,301 |
15384 | Nassau | ROCKVILLE CENTRE (V) / ROCKVILLE CENTRE (V) | Rehab tank #3, Upgrade Storage | 24,700 | $911,550 | 15 | $1,236,165,851 |
16453 | Nassau | GARDEN CITY (V) / GARDEN CITY (V) | New Water Treatment Plant | 21,686 | $1,601,702 | 15 | $1,237,767,553 |
15041 | Nassau | MINEOLA (V) / MINEOLA (V) | Upgrade Water Treatment Plant | 20,600 | $278,409 | 15 | $1,238,045,962 |
15663 | Nassau | ROSLYN WD / NORTH HEMPSTEAD (T) | Convert Well #3 DWTP to water lubrication, Upgrade Ground Water Source | 17,000 | $79,725 | 15 | $1,238,125,687 |
15671 | Nassau | ROSLYN WD / NORTH HEMPSTEAD (T) | Upgrade Ground Water Source | 17,000 | $83,224 | 15 | $1,238,208,911 |
15673 | Nassau | ROSLYN WD / NORTH HEMPSTEAD (T) | Upgrade Water Treatment Plant | 17,000 | $234,068 | 15 | $1,238,442,979 |
15676 | Nassau | ROSLYN WD / NORTH HEMPSTEAD (T) | Roslyn Estate Pressure Zone, New Pump Station | 17,000 | $852,135 | 15 | $1,239,295,114 |
15285 | Nassau | ALBERTSON WD / NORTH HEMPSTEAD (T) | Wells no. 2 & 3 Replacement of screen and well pump, Upgrade Ground Water Source | 13,500 | $386,686 | 15 | $1,239,681,800 |
15939 | Nassau | FARMINGDALE (V) / FARMINGDALE (V) | Upgrade Water Treatment Plant | 8,000 | $75,000 | 15 | $1,239,756,800 |
17344 | Nassau | WILLISTON PARK (V) / WILLISTON PARK (V) | Secondary Containment for Caustic Soda, Upgrade Other Expenses, Upgrade Other (OT) | 7,516 | $161,350 | 15 | $1,239,918,150 |
15328 | Nassau | SOUTH FARMINGDALE WD / SOUTH FARMINGDALE W.D. | Caustic Soda Conversion at Plants 1, 5 & 6, Upgrade Water Treatment Plant | 44,700 | $638,000 | 10 | $1,240,556,150 |
16290 | Nassau | BETHPAGE WD / BETHPAGE W.D. | Upgrade Water Treatment Plant | 33,000 | $200,850 | 10 | $1,240,757,000 |
15642 | Nassau | WILLISTON PARK (V) / WILLISTON PARK (V) | Upgrade Ground Water Source | 7,516 | $800,000 | 10 | $1,241,557,000 |
16457 | Nassau | LIDO-POINT LOOKOUT WD / HEMPSTEAD (T) | Upgrade Distribution System | 6,000 | $8,876,000 | 10 | $1,250,433,000 |
15338 | Nassau | SOUTH FARMINGDALE WD / SOUTH FARMINGDALE W.D. | Natural Gas Services/Engine-Generator for Plants 2, 3 & 5, Upgrade Water Treatment Plant | 44,700 | $603,000 | 10 | $1,251,036,000 |
15609 | Nassau | MANHASSET LAKEVILLE WD / NORTH HEMPSTEAD (T) | Install computerized remote and local data transmission system, Upgrade Water Treatment Plant | 43,000 | $238,960 | 10 | $1,251,274,960 |
15612 | Nassau | MANHASSET LAKEVILLE WD / NORTH HEMPSTEAD (T) | Replace existing asbestos cement pipe, Upgrade Distribution System | 43,000 | $1,433,760 | 10 | $1,252,708,720 |
15264 | Nassau | PLAINVIEW WD / OYSTER BAY (T) | New Pump Station | 35,000 | $4,663,248 | 10 | $1,257,371,968 |
15456 | Nassau | PORT WASHINGTON WD / NORTH HEMPSTEAD (T) | Replace approx. 4000 lf of 4" mains #2, Upgrade Distribution System | 34,000 | $714,000 | 10 | $1,258,085,968 |
15459 | Nassau | PORT WASHINGTON WD / NORTH HEMPSTEAD (T) | Install new mains to eliminate dead head mains #3, New Distribution System | 34,000 | $714,000 | 10 | $1,258,799,968 |
15467 | Nassau | PORT WASHINGTON WD / NORTH HEMPSTEAD (T) | Construct new pressure regulating valve vault in West Shore Road (#6), Upgrade Distribution System | 34,000 | $119,000 | 10 | $1,258,918,968 |
15470 | Nassau | PORT WASHINGTON WD / NORTH HEMPSTEAD (T) | Construct new back pressure regulating valve vault on Radcliffe Avenue (#7), Upgrade Distribution System | 34,000 | $82,600 | 10 | $1,259,001,568 |
15476 | Nassau | PORT WASHINGTON WD / NORTH HEMPSTEAD (T) | Transfer Services (#8), Upgrade Distribution System | 34,000 | $89,250 | 10 | $1,259,090,818 |
15385 | Nassau | WA OF GREAT NECK NORTH / WATER AUTH. OF GREAT NECK NO. | Construction of automatic blow off valves for well nos. 2,5,6,7,8,9 & 10, Upgrade Ground Water Source | 31,400 | $355,000 | 10 | $1,259,445,818 |
15357 | Nassau | ROCKVILLE CENTRE (V) / ROCKVILLE CENTRE (V) | SCADA - Phase I, Upgrade Water Treatment Plant | 24,700 | $210,120 | 10 | $1,259,655,938 |
15367 | Nassau | ROCKVILLE CENTRE (V) / ROCKVILLE CENTRE (V) | SCADA - Phase 2, Upgrade Water Treatment Plant | 24,700 | $430,540 | 10 | $1,260,086,478 |
15368 | Nassau | ROCKVILLE CENTRE (V) / ROCKVILLE CENTRE (V) | Pipeline replacement, Upgrade Distribution System | 24,700 | $402,832 | 10 | $1,260,489,310 |
15372 | Nassau | ROCKVILLE CENTRE (V) / ROCKVILLE CENTRE (V) | Upgrade Distribution System | 24,700 | $755,307 | 10 | $1,261,244,617 |
15376 | Nassau | ROCKVILLE CENTRE (V) / ROCKVILLE CENTRE (V) | Pipeline replacement, Upgrade Distribution System | 24,700 | $792,588 | 10 | $1,262,037,205 |
15379 | Nassau | ROCKVILLE CENTRE (V) / ROCKVILLE CENTRE (V) | Pipeline replacement, Upgrade Distribution System | 24,700 | $561,549 | 10 | $1,262,598,754 |
15382 | Nassau | ROCKVILLE CENTRE (V) / ROCKVILLE CENTRE (V) | Upgrade Distribution System | 24,700 | $727,600 | 10 | $1,263,326,354 |
15670 | Nassau | ROSLYN WD / NORTH HEMPSTEAD (T) | Upgrade Ground Water Source | 17,000 | $104,650 | 10 | $1,263,431,004 |
16263 | Nassau | FARMINGDALE (V) / FARMINGDALE (V) | Upgrade Distribution System | 8,000 | $400,000 | 10 | $1,263,831,004 |
15326 | Nassau | WATER AUTH. OF WEST. NASSAU COUNTY / WATER AUTH. OF WEST. NASSAU CO | Upgrade Distribution System | 85,000 | $8,259,240 | 5 | $1,272,090,244 |
16452 | Nassau | GARDEN CITY (V) / GARDEN CITY (V) | Upgrade Distribution System | 21,686 | $253,287 | 5 | $1,272,343,531 |
Niagara | |||||||
15990 | Niagara | NIAGARA FALLS WATER BOARD / NIAGARA FALLS (C) | Ontario Avenue., Upgrade Distribution System | 55,593 | $281,200 | 55 | $1,272,624,731 |
16009 | Niagara | NIAGARA FALLS WATER BOARD / NIAGARA FALLS (C) | D Street to Falls Street., New Distribution System | 55,593 | $77,000 | 55 | $1,272,701,731 |
16420 | Niagara | LOCKPORT CITY WTP / LOCKPORT (C) | Extend Distribution System | 22,279 | $400,000 | 55 | $1,273,101,731 |
16211 | Niagara | NIAGARA COUNTY WATER DISTRICT / NIAGARA COUNTY | Contract 15G, E., Upgrade Water Treatment Plant, Upgrade Transmission | 109,000 | $6,526,857 | 50 | $1,279,628,588 |
15986 | Niagara | NIAGARA FALLS WATER BOARD / NIAGARA FALLS (C) | Upgrade Distribution System | 55,593 | $390,000 | 45 | $1,280,018,588 |
15988 | Niagara | NIAGARA FALLS WATER BOARD / NIAGARA FALLS (C) | McKoon Ave., West Rivershore Dr., Upgrade Distribution System | 55,593 | $466,920 | 45 | $1,280,485,508 |
15009 | Niagara | ROYALTON TOWNWIDE WATER DIST. / ROYALTON (T) | Wholly Part-Town Water Improvement. Phases 3,4,and 5, Extend Distribution System | 7,710 | $2,610,000 | 45 | $1,283,095,508 |
15269 | Niagara | ROYALTON TOWNWIDE WATER DIST. / ROYALTON (T) | Town Water Improvements Phase VI., Extend Distribution System | 7,710 | $963,560 | 45 | $1,284,059,068 |
15664 | Niagara | HARTLAND WD / HARTLAND (T) | Extend Distribution System | 4,165 | $726,500 | 45 | $1,284,785,568 |
15995 | Niagara | NIAGARA FALLS WATER BOARD / NIAGARA FALLS (C) | valve replacement., Upgrade Distribution System | 55,593 | $575,800 | 40 | $1,285,361,368 |
15989 | Niagara | NIAGARA FALLS WATER BOARD / NIAGARA FALLS (C) | Hydraulic distribution system model., Upgrade Distribution System | 55,593 | $206,000 | 40 | $1,285,567,368 |
17166 | Niagara | NEWFANE WD NO1,2,3 CONSOL / NEWFANE (T) | Upgrade Distribution System | 3,485 | $2,489,200 | 35 | $1,288,056,568 |
16209 | Niagara | NIAGARA COUNTY WATER DISTRICT / NIAGARA COUNTY | Contract 14A, E, G & H., Upgrade Water Treatment Plant | 109,000 | $2,859,246 | 35 | $1,290,915,814 |
16586 | Niagara | NIAGARA WATER IMPROVEMENT AREA / NIAGARA (T) | New Transmission | 8,978 | $400,000 | 35 | $1,291,315,814 |
17064 | Niagara | MIDDLEPORT VILLAGE / MIDDLEPORT (V) | New Storage | 1,917 | $927,000 | 35 | $1,292,242,814 |
15991 | Niagara | NIAGARA FALLS WATER BOARD / NIAGARA FALLS (C) | Hennepin Avenue., Upgrade Distribution System | 55,593 | $294,270 | 35 | $1,292,537,084 |
15992 | Niagara | NIAGARA FALLS WATER BOARD / NIAGARA FALLS (C) | Hydrant repalcement project., Upgrade Distribution System | 55,593 | $542,300 | 35 | $1,293,079,384 |
15994 | Niagara | NIAGARA FALLS WATER BOARD / NIAGARA FALLS (C) | Mckoon Avenue., Upgrade Distribution System | 55,593 | $593,500 | 35 | $1,293,672,884 |
15997 | Niagara | NIAGARA FALLS WATER BOARD / NIAGARA FALLS (C) | Pierce Avenue., Upgrade Distribution System | 55,593 | $508,150 | 35 | $1,294,181,034 |
15998 | Niagara | NIAGARA FALLS WATER BOARD / NIAGARA FALLS (C) | Laughlin Drive., Upgrade Distribution System | 55,593 | $277,200 | 35 | $1,294,458,234 |
16001 | Niagara | NIAGARA FALLS WATER BOARD / NIAGARA FALLS (C) | Hennepin Avenue., Upgrade Distribution System | 55,593 | $123,200 | 35 | $1,294,581,434 |
16002 | Niagara | NIAGARA FALLS WATER BOARD / NIAGARA FALLS (C) | Niagara Falls Blvd., Upgrade Distribution System | 55,593 | $650,000 | 35 | $1,295,231,434 |
16004 | Niagara | NIAGARA FALLS WATER BOARD / NIAGARA FALLS (C) | Rivershore Drive., Upgrade Distribution System | 55,593 | $277,200 | 35 | $1,295,508,634 |
16006 | Niagara | NIAGARA FALLS WATER BOARD / NIAGARA FALLS (C) | Buffalo Avenue Water Main Replacements., Upgrade Distribution System | 55,593 | $5,460,000 | 35 | $1,300,968,634 |
16011 | Niagara | NIAGARA FALLS WATER BOARD / NIAGARA FALLS (C) | Niagara Avenue to Parkview., New Distribution System | 55,593 | $308,000 | 35 | $1,301,276,634 |
15999 | Niagara | NIAGARA FALLS WATER BOARD / NIAGARA FALLS (C) | lead service line replacement., Upgrade Distribution System | 55,593 | $1,005,000 | 30 | $1,302,281,634 |
16062 | Niagara | BARKER VILLAGE / BARKER (V) | Upgrade Distribution System | 577 | $598,288 | 25 | $1,302,879,922 |
16214 | Niagara | NIAGARA COUNTY WATER DISTRICT / NIAGARA COUNTY | Shawnee-Robinson Transmission main., Upgrade Transmission | 109,000 | $6,200,000 | 25 | $1,309,079,922 |
16216 | Niagara | NIAGARA COUNTY WATER DISTRICT / NIAGARA COUNTY | New Pump Station | 109,000 | $200,000 | 25 | $1,309,279,922 |
16217 | Niagara | NIAGARA COUNTY WATER DISTRICT / NIAGARA COUNTY | Upgrade Surface Water Source | 109,000 | $40,000 | 25 | $1,309,319,922 |
16218 | Niagara | NIAGARA COUNTY WATER DISTRICT / NIAGARA COUNTY | Ward-Shawnee Transmission Main., New Transmission | 109,000 | $2,400,000 | 25 | $1,311,719,922 |
16220 | Niagara | NIAGARA COUNTY WATER DISTRICT / NIAGARA COUNTY | Coagulation Basin Refurbishment., Upgrade Water Treatment Plant | 109,000 | $450,000 | 25 | $1,312,169,922 |
16222 | Niagara | NIAGARA COUNTY WATER DISTRICT / NIAGARA COUNTY | Filter and valve rehabilitation., Upgrade Water Treatment Plant | 109,000 | $240,000 | 25 | $1,312,409,922 |
16224 | Niagara | NIAGARA COUNTY WATER DISTRICT / NIAGARA COUNTY | carbon feed system., Upgrade Water Treatment Plant | 109,000 | $100,000 | 25 | $1,312,509,922 |
16248 | Niagara | NIAGARA COUNTY WATER DISTRICT / NIAGARA COUNTY | sludge lagoon modifications., Upgrade Water Treatment Plant | 109,000 | $220,000 | 25 | $1,312,729,922 |
15063 | Niagara | NORTH TONAWANDA CITY / NORTH TONAWANDA (C) | Clean coagulation basin piping and water intake conduit., Upgrade Water Treatment Plant | 33,262 | $236,950 | 25 | $1,312,966,872 |
15064 | Niagara | NORTH TONAWANDA CITY / NORTH TONAWANDA (C) | Filter improvments., Upgrade Water Treatment Plant | 33,262 | $369,675 | 25 | $1,313,336,547 |
15071 | Niagara | NORTH TONAWANDA CITY / NORTH TONAWANDA (C) | Upgrade Surface Water Source | 33,262 | $61,875 | 25 | $1,313,398,422 |
15473 | Niagara | LEWISTON WATER IMPROVEMENTAREA / LEWISTON (T) | Upgrade Transmission, Upgrade Distribution System | 16,257 | $4,842,107 | 20 | $1,318,240,529 |
17264 | Niagara | LEWISTON WATER IMPROVEMENTAREA / LEWISTON (T) | Upgrade Transmission, Upgrade Distribution System | 16,257 | $5,000,000 | 20 | $1,323,240,529 |
16053 | Niagara | CAMBRIA WATER DISTRICT / CAMBRIA (T) | New Storage, New Pump Station, Upgrade Distribution System | 5,393 | $1,000,000 | 20 | $1,324,240,529 |
16223 | Niagara | NIAGARA COUNTY WATER DISTRICT / NIAGARA COUNTY | New lab., Upgrade Water Treatment Plant | 109,000 | $100,000 | 20 | $1,324,340,529 |
15060 | Niagara | NORTH TONAWANDA CITY / NORTH TONAWANDA (C) | Distribution system improvements, various locations throughout city., Upgrade Distribution System | 33,262 | $16,050,000 | 20 | $1,340,390,529 |
15065 | Niagara | NORTH TONAWANDA CITY / NORTH TONAWANDA (C) | Dead-end main elimination., New Distribution System | 33,262 | $600,250 | 20 | $1,340,990,779 |
15069 | Niagara | NORTH TONAWANDA CITY / NORTH TONAWANDA (C) | Abandon/replace 2" mains., Upgrade Distribution System | 33,262 | $130,800 | 20 | $1,341,121,579 |
16599 | Niagara | WILSON TOWN WATER DISTRICT / WILSON (T) | Sunset Island water main project., Upgrade Distribution System | 5,840 | $882,400 | 15 | $1,342,003,979 |
17381 | Niagara | YOUNGSTOWN (V) / YOUNGSTOWN (V) | Upgrade Transmission | 2,021 | $544,613 | 15 | $1,342,548,592 |
16398 | Niagara | LOCKPORT WD#3 / LOCKPORT (T) | Sunset Drive., Upgrade Distribution System | 19,653 | $1,080,000 | 10 | $1,343,628,592 |
16393 | Niagara | LOCKPORT WD#3 / LOCKPORT (T) | Stone Road., Upgrade Distribution System | 19,653 | $1,305,000 | 5 | $1,344,933,592 |
16397 | Niagara | LOCKPORT WD#3 / LOCKPORT (T) | Transit Road., Upgrade Distribution System | 19,653 | $1,350,000 | 5 | $1,346,283,592 |
16399 | Niagara | LOCKPORT WD#3 / LOCKPORT (T) | Lincoln Avenue., Upgrade Distribution System | 19,653 | $765,000 | 5 | $1,347,048,592 |