NYS Drinking Water State Revolving Fund

Multi-Year List for October 1, 2005 to September 30, 2006

NY City - Rockland

Project County System Name/
Borrower
Description Pop. Project
Cost
Score Cumulative Total
NY City
17013 NY City NEW YORK CITY - CROTON SYSTEM / NYCMWFA Croton filtration plant(Phase 2 of 16479), New Water Treatment Plant 1,000,000 $51,110,648 2,115 $1,398,159,240
17476 NY City NEW YORK CITY - CROTON SYSTEM / NYCMWFA   1,000,000 $800,000,000 2,115 $2,198,159,240
16999 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA Phase3 (Phase1=16265, Phase 2=16463) Hillview Reservoir Chem Addl. Bldg, Equipment Storage Bldg(C529A CM, C529A, C545E), Upgrade Storage, New Storage 6,552,718 $5,000,000 2,105 $2,203,159,240
16660 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA Hillview Reservoir cover, phase 2 of DWSRF #16477 (C565, 566D) portion of phase 3 brought forward from m.y. list to R.List., Upgrade Storage 6,552,718 $10,000,000 2,105 $2,213,159,240
17266 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA Kensico flow control structure(566C, 566CM)(phase 5 of 16875), Upgrade Storage 6,552,718 $9,294,404 2,105 $2,222,453,644
17440 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA 3rd city tunnel, stage2 Bkln/Qns, shafts 20,21 and 22B(C545B) (Bkln), Shaft 23B (C545C)(Bkln), crit redund, dist. press(phase 5 of 16266), New Transmission 6,552,718 $13,392,390 2,060 $2,235,846,034
17441 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA 3rd city tunnel, stage2 Bkln/Qns, shaft19B(C545A)(Qns), crit redund, dist. press(phase 5 of16996), Instr. and Tele;Bkln,Qns, Manh (C545D), New Transmission 6,552,718 $8,262,398 2,060 $2,244,108,432
17172 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA Hillview Reservoir Chambers Reconstruction-Phase 2 (Phase 1-17171)-Chamber Roof Replacement, equipment upgrade, Interim chemical system improvement,Safety and Security Improvements (C519A,C519B,C519C,C519D), New Storage 6,552,718 $6,400,000 110 $2,250,508,432
17173 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA Hillview Reservoir Chambers Reconstruction-Phase 3 (Phases 1-17171, 2-17172), General Chamber Improvements, Flow Control & New Chemical Facilities, SCADA (C519A,C519B,C519C,C519D), Upgrade Surface Water Treatment Rule Compliance Facility 6,552,718 $24,573,633 110 $2,275,082,065
17174 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA Hillview Reservoir Chambers Reconstruction-Phase 4 (Phases 1-17171, 2-17172 & 3-17173), C519A,C519B,C519C,C519D, New Storage 6,552,718 $7,741,901 110 $2,282,823,966
17000 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA Phase4 (Phase1=16265, phase 2=16463, Phase 3=16999) Hillview Reservoir Chem Addl. Bldg(C529A CM, C529A), New Storage 6,552,718 $13,800,000 105 $2,296,623,966
17001 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA Phase5 ( Phase 3=16999, Phase 4=17000) Hillview Reservoir Chem Addl. Bldg(C529A CM, C529A), New Storage 6,552,718 $3,200,000 105 $2,299,823,966
17014 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA Hillview Reservoir cover, phase 3 (Phase 1=16477, Phase 2=16660 ) (C565,566D)), Upgrade Storage 6,552,718 $61,000,000 105 $2,360,823,966
17015 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA Hillview Reservoir cover, phase 4 ( Phase3=17014 ) (C565, 566D)), Upgrade Storage 6,552,718 $157,131,500 105 $2,517,955,466
16476 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA Transmission to Jamaica area Phase 1 (see project #16709 for Phase 2), dist press improv, Upgrade Transmission 6,552,718 $10,000,000 85 $2,527,955,466
16709 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA Transmission to Jamaica area Phase 2 (see project #16476 for Phase 1), dist press improv, Upgrade Transmission 6,552,718 $88,875,000 85 $2,616,830,466
16474 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA 3rd City Tunnel, mnhtn borings; Restore shaft 23(C604); Riser Valve Controls, Delaware system(C347), Upgrade Transmission 6,552,718 $4,833,250 60 $2,621,663,716
16478 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA 3rd City tunnel and shafts, crit redund, dist press,Field services(C538B CM), Upgrade Transmission 6,552,718 $69,000,000 60 $2,690,663,716
17002 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA (Phase 2 of 16474) 3rd City Tunnel, mnhtn borings; Restore shaft 23(C604); Riser Valve Controls, Delaware system(C347), Upgrade Transmission 6,552,718 $4,586,150 60 $2,695,249,866
17004 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA (Phase 3 of 16474, Phase 2=17002) 3rd City Tunnel, mnhtn borings; Restore shaft 23(C604); Riser Valve Controls, Delaware system(C347), Upgrade Transmission 6,552,718 $18,722,600 60 $2,713,972,466
17005 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA (Phase 4 of 16474, Phase3=17004) 3rd City Tunnel, mnhtn borings; Restore shaft 19B-23B (C572), Upgrade Transmission 6,552,718 $10,000,000 60 $2,723,972,466
17006 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA (Phase II of 16478)3rd City tunnel and shafts, crit redund, dist press,Field services(C538B CM),Excavation shafts 24B-29B, 33B(C538B), Upgrade Transmission 6,552,718 $52,500,000 60 $2,776,472,466
17007 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA (Phase III of 16478, Phase II=17006))Shafts 27B-32B(C538B CM, C538B, C538CM) , Upgrade Transmission 6,552,718 $13,200,000 60 $2,789,672,466
17008 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA Phase IV of 16478(Phase III =17007, Phase II=17006))Shafts 27B-32B, 32CM, 13B (C538B CM, C538B, C538CM) , Upgrade Transmission 6,552,718 $397,710,000 60 $3,187,382,466
17009 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA City Tunnel 3 stage 2 Mnhtn segment, shaft 18B completion(C541R), Upgrade Transmission 6,552,718 $7,200,000 60 $3,194,582,466
17010 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA City Tunnel 3 stage 2 Mnhtn segment, shaft 18B completion(C541R)(Phase II of 17009), Upgrade Transmission 6,552,718 $28,800,000 60 $3,223,382,466
17011 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA City tunnel 3 stage 2, shafts19B-22B (C544B, C, E, H, P), Upgrade Transmission 6,552,718 $3,350,000 60 $3,226,732,466
17012 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA City tunnel 3 stage 2, shafts19B-22B(C544B, C, E, H, P)(Phase of 17011), Upgrade Transmission 6,552,718 $32,860,000 60 $3,259,592,466
17167 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA City Tunnel 3, Stage 2, Shaft 15B East-Phase 1, Brooklyn-Queens (C545G), New Pump Station 6,552,718 $4,928,000 60 $3,264,520,466
17170 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA City Tunnel 3, Stage 2, Shaft 15B East- Phase 2 (Phase 1-17167)/Brooklyn-Queens (C545G), New Pump Station 6,552,718 $1,000,000 60 $3,265,520,466
17176 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA City Tunnel 3, Stage 2, Shaft 15B East- Phase3 (Phases: 1-17167 & 2-17170),Brooklyn-Queens (C545G), New Pump Station 6,552,718 $232,000 60 $3,265,752,466
17203 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA City Tunnel 3, Stage 1, Shafts 8B and 15B, Phase 1 - Completion of Chlorination Booster Stations, Upgrade Distribution System 6,552,718 $1,000,000 60 $3,266,752,466
17204 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA   6,552,718 $1,000,000 60 $3,267,752,466
17437 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCWMFA Catskill & Delaware UV Disinfection, New Water Treatment Plant 6,552,718 $13,468,800 55 $3,281,221,266
17370 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA Reconstruction of Delaware Aqueduct, Shafts 9,10 & 17, Upgrade Transmission 6,552,718 $38,897,289 30 $3,320,118,555
17371 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA Inspection and Rehabilitation of New Croton Aqueduct, Upgrade Transmission 6,552,718 $16,111,111 30 $3,336,229,666
17198 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA Test Borings for City Tunnel 3 and Upstate Tunnel Sites, Phase 1 (C554), NYC & Westchester, Upgrade Transmission 6,552,718 $6,837,000 15 $3,343,066,666
17199 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA Test Borings for City Tunnel 3 and Upstate Tunnel Sites, Phase 2 (C554), NYC & Westchester, Upgrade Transmission 6,552,718 $1,710,000 15 $3,344,776,666
17200 NY City NEW YORK CITY-CATSKILL/DELAWARE SYSTEM / NYCMWFA Test Borings for City Tunnel 3 and Upstate Tunnel Sites, Phase3 (C554), NYC & Westchester, Upgrade Transmission 6,552,718 $3,418,378 15 $3,348,195,044
Oneida
16431 Oneida REMSEN VILLAGE / REMSEN (V) New Surface Water Treatment Rule Compliance Facility 650 $0 1,190 $3,348,195,044
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan
17088 Oneida HIGBY ROAD WATER DISTRICT / NEW HARTFORD (T) New Storage, New Pump Station, Extend Distribution System 700 $0 1,100 $3,348,195,044
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan
16889 Oneida KIRKLAND (T) ROUTE 5 WATER DISTRICT / KIRKLAND (T) New system to serve area with private contaminated wells, consolidate public water supply. , New Complete System (New System) 300 $0 1,090 $3,348,195,044
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan
17108 Oneida VILLAGE OF BRIDGEWATER / BRIDGEWATER (V) New system to serve area with private contaminated wells, consolidate public water supply. , New Complete System (New System), New System Consolidation 600 $3,303,000 240 $3,351,498,044
16486 Oneida WESTMORELAND WD NO 1 / WESTMORELAND (T) New treatment for GUDI wells, extend system to serve area with private contaminated wells, consolidate public water supply. , New Surface Water Treatment Rule Compliance Facility, Upgrade Distribution System 500 $1,525,000 215 $3,353,023,044
17225 Oneida HAMLET OF VIENNA WD / VIENNA (T) New Surface Water Treatment Rule Compliance Facility, New Water District 875 $4,500,000 160 $3,357,523,044
17486 Oneida HAMLET OF VIENNA WD 1 EXT NO. 1 / VIENNA (T)   735 $684,950 145 $3,358,207,994
17487 Oneida PARIS CONSOLIDATED WATER DIST. / PARIS (T) Inter-connection for GUDI source compliance., New Inter-Connection 2,639 $3,100,000 140 $3,361,307,994
17230 Oneida BENEFITED AREA E / FLOYD (T) New Distribution System, New System Consolidation 115 $665,000 115 $3,361,972,994
17462 Oneida CLINTON VILLAGE / CLINTON (V) New Surface Water Treatment Rule Compliance Facility 3,000 $2,720,000 110 $3,364,692,994
15560 Oneida VERNON VILLAGE / VERNON (V) New Transmission, New Storage, New Distribution System, New Inter-Connection 1,300 $9,991,000 110 $3,374,683,994
17438 Oneida ROME CITY / ROME (C) Filter and storage tank rehabilitation., Upgrade Water Treatment Plant, Upgrade Storage 37,000 $2,750,000 105 $3,377,433,994
17263 Oneida MOHAWK VALLEY WATER AUTHORITY / UPPER MOHAWK VALLEY REG. WB New System Consolidation 120,000 $7,210,000 100 $3,384,643,994
17277 Oneida CLAYVILLE VILLAGE / (V) CLAYVILLE New Inter-Connection 445 $220,000 80 $3,384,863,994
17145 Oneida TIBBITS/SNOWDEN HILL WD / NEW HARTFORD (T) New system to serve area with private contaminated wells. , New Complete System (New System) 450 $2,400,000 80 $3,387,263,994
16588 Oneida TOWN OF TRENTON / TRENTON (T) Extend Distribution System 150 $848,900 80 $3,388,112,894
15139 Oneida MOHAWK VALLEY WATER AUTHORITY / UPPER MOHAWK VALLEY REG. WB New 6 MG storage tank at Toby Road., Upgrade Storage 120,000 $3,100,000 75 $3,391,212,894
16806 Oneida MOHAWK VALLEY WATER AUTHORITY / UPPER MOHAWK VALLEY REG. WB Replace undersized and unlined mains in the North Utica and Cornhill area, Upgrade Transmission, Upgrade Transmission 120,000 $486,200 75 $3,391,699,094
16899 Oneida FLOYD BENEFIT (T) AREA "D" / FLOYD (T) New Complete System (New System) 900 $6,245,000 75 $3,397,944,094
15794 Oneida MOHAWK VALLEY WATER AUTHORITY / UPPER MOHAWK VALLEY REG. WB Shacksbury Storage Tak and Mains, Replacement. , Upgrade Storage 120,000 $400,000 70 $3,398,344,094
16800 Oneida MOHAWK VALLEY WATER AUTHORITY / UPPER MOHAWK VALLEY REG. WB Wilcox tank renovation and expansion, Upgrade Storage 120,000 $982,800 70 $3,399,326,894
15205 Oneida BOONVILLE VILLAGE / BOONVILLE (V) New Transmission, New Storage, Upgrade Distribution System 3,000 $801,144 70 $3,400,128,038
16435 Oneida DEERFIELD (T), SMITH HILL EXT. / DEERFIELD (T) Extend system to serve area with private contaminated wells, consolidate public water supply. , Extend Distribution System 200 $638,000 70 $3,400,766,038
15786 Oneida MOHAWK VALLEY WATER AUTHORITY / UPPER MOHAWK VALLEY REG. WB Gilbert Road Storage Tank., Upgrade Storage 120,000 $150,000 55 $3,400,916,038
15865 Oneida MOHAWK VALLEY WATER AUTHORITY / UPPER MOHAWK VALLEY REG. WB Pleasant Street., Upgrade Distribution System 120,000 $400,000 55 $3,401,316,038
15869 Oneida MOHAWK VALLEY WATER AUTHORITY / UPPER MOHAWK VALLEY REG. WB Burrstone Road and Dewey Row, (T) of Whitestone., Upgrade Distribution System 120,000 $756,000 55 $3,402,072,038
17027 Oneida MOHAWK VALLEY WATER AUTHORITY / WHITESTOWN (T) The UMVRWB will extend the 12 inch line along Sutliff Road and NYS route 233 and connect to Village of Camelot., Extend System Consolidation 120,000 $629,000 55 $3,402,701,038
15878 Oneida MOHAWK VALLEY WATER AUTHORITY / UPPER MOHAWK VALLEY REG. WB Southern Pump and Chemical Treatment Station, Upgrade Pump and Chemical Station., Upgrade Pump Station 120,000 $420,000 50 $3,403,121,038
16805 Oneida MOHAWK VALLEY WATER AUTHORITY / UPPER MOHAWK VALLEY REG. WB High Service Zone Interconnecting Mains, Oxford Road, Upgrade Transmission 120,000 $1,159,000 50 $3,404,280,038
17307 Oneida NEW LONDON WATER SYSTEM / VERONA (T) New Storage, New Distribution System 500 $6,150,000 50 $3,410,430,038
16726 Oneida VERONA WATER DISTRICT / VERONA (T) New Storage 1,001 $927,000 45 $3,411,357,038
15748 Oneida MOHAWK VALLEY WATER AUTHORITY / UPPER MOHAWK VALLEY REG. WATER Upgrade Pump Station 120,000 $120,000 45 $3,411,477,038
16774 Oneida TOWN OF NEW HARTFORD / NEW HARTFORD (T) New Complete System (New System) 450 $1,483,200 45 $3,412,960,238
15077 Oneida MILLER/WALKER RD. W.D. - (T)DEERFIELD / DEERFIELD (T) New Complete System (New System), Extend Distribution System 200 $306,400 45 $3,413,266,638
15062 Oneida TAURUSEL, INC (POND HILL) / TAURUSEL, INC. Upgrade Ground Water Source, Upgrade Distribution System, System Consolidation 54 $114,000 35 $3,413,380,638
17472 Oneida MOHAWK VALLEY WATER AUTHORITY / UPPER MOHAWK VALLEY REG. WB New Storage 120,000 $4,271,400 35 $3,417,652,038
15700 Oneida ROME CITY / ROME (C) Replace two 30" diameter main water transmission lines., Upgrade Transmission 37,000 $5,000,000 30 $3,422,652,038
15703 Oneida ROME CITY / ROME (C) Transmission main for western portion of city., New Transmission 37,000 $7,000,000 30 $3,429,652,038
15731 Oneida ROME CITY / ROME (C) New Storage 37,000 $1,000,000 30 $3,430,652,038
16250 Oneida JAMES E. BARRETT WATER SYSTEM / PROSPECT (V) Upgrade Ground Water Source, New Storage, Upgrade Distribution System 305 $326,000 25 $3,430,978,038
15711 Oneida ROME CITY / ROME (C) Hydrant replacement., Upgrade Distribution System 37,000 $750,000 25 $3,431,728,038
15721 Oneida ROME CITY / ROME (C) Upgrade Transmission 37,000 $600,000 25 $3,432,328,038
15726 Oneida ROME CITY / ROME (C) Upgrade Distribution System 37,000 $2,200,000 25 $3,434,528,038
15737 Oneida ROME CITY / ROME (C) Water meters., Upgrade Distribution System 37,000 $1,000,000 25 $3,435,528,038
15045 Oneida CLINTON VILLAGE / CLINTON (V) Upgrade Distribution System 3,000 $822,000 20 $3,436,350,038
16693 Oneida CLINTON VILLAGE / CLINTON (V) New Storage 3,000 $521,180 20 $3,436,871,218
17224 Oneida DEANSBORO WD / MARSHALL (T) New Ground Water Source, Upgrade Distribution System 450 $400,000 20 $3,437,271,218
17485 Oneida BARNEVELD VILLAGE / BARNEVELD (V)   391 $219,000 15 $3,437,490,218
Onondaga
17254 Onondaga SOUTHERN ONONDAGA CO. WATER SYSTEM / SPAFFORD (T) Extend to serve private contaminated wells, consolidate public water supply, eliminate public water supply that has been determined to be GWUDI., Extend Distribution System, System Consolidation 1,800 $8,095,000 180 $3,445,585,218
16882 Onondaga LIMELEDGE WATER DISTRICT / MARCELLUS (T) & (V) New Water District to serve area with insufficient private wells. Interconnection with GWUDI system., New Surface Water Treatment Rule Compliance Facility, Extend Distribution System 700 $6,235,000 160 $3,451,820,218
17385 Onondaga EAST SYRACUSE VILLAGE / EAST SYRACUSE (V) Inter-connection to eliminate GWUDI source., New Transmission, New Inter-Connection 3,650 $535,600 145 $3,452,355,818
17480 Onondaga SMOKEY HOLLOW WD / LAFAYETTE (T) Connection with OCWA for GUDI source compliance., Upgrade Distribution System, New Inter-Connection 400 $1,441,900 110 $3,453,797,718
16564 Onondaga EAST SYRACUSE VILLAGE / EAST SYRACUSE (V) New well to replace shallow wells and a lead and copper corrosion control system., New Ground Water Source 3,650 $227,040 75 $3,454,024,758
17025 Onondaga EAST SYRACUSE VILLAGE / EAST SYRACUSE (V) Contruct a building around Gifford finished water reservoir. , Upgrade Storage 3,650 $1,990,503 65 $3,456,015,261
17389 Onondaga EAST SYRACUSE VILLAGE / EAST SYRACUSE (V) Replace lead service lines from the watermain to the property line to correct lead & copper exceedances., Upgrade Distribution System 3,650 $444,445 65 $3,456,459,706
15811 Onondaga SKANEATELES VILLAGE / SKANEATELES (V) Improve disinfection contact time., Upgrade Transmission 2,800 $1,600,000 55 $3,458,059,706
15115 Onondaga ROUTE 5 EAST W.D. - (T) ELBRIDGE / ELBRIDGE (T) Route 5 East WD., New Complete System (New System), New Transmission, New Storage, New Distribution System 6,192 $2,008,500 50 $3,460,068,206
15116 Onondaga ROUTE 5 WEST W.D. - (T) ELBRIDGE / ELBRIDGE (T) Route 5 West WD., New Complete System (New System), New Distribution System 6,192 $306,966 50 $3,460,375,172
17327 Onondaga CROSS LAKE/N. ELBRIDGE AREA WD / ELBRIDGE (T) New Storage, New Pump Station, Extend Distribution System 534 $2,590,450 50 $3,462,965,622
17328 Onondaga HALFWAY ROAD WATER DISTRICT / ELBRIDGE (T) New Storage, Extend Distribution System 120 $906,400 50 $3,463,872,022
17326 Onondaga LAIRD ROAD WATER DISTRICT / ELBRIDGE (T) Extend Distribution System 29 $278,100 50 $3,464,150,122
15061 Onondaga TULLY VILLAGE / TULLY (V) New Ground Water Source, Upgrade Distribution System 930 $226,600 45 $3,464,376,722
16177 Onondaga EAST SYRACUSE VILLAGE / EAST SYRACUSE (V) New Pump Station 3,650 $105,869 45 $3,464,482,591
16565 Onondaga EAST SYRACUSE VILLAGE / ONONDAGA COUNTY PARKS Jamesville Beach Water Supply Upgrade., New Storage, New Distribution System 3,650 $102,000 45 $3,464,584,591
16644 Onondaga CICERO WDS / CICERO (T) Extend Distribution System 14,108 $49,500 45 $3,464,634,091
16313 Onondaga TOWN OF LYSANDER W.D. / LYSANDER (T) New Distribution System, New Inter-Connection 500 $1,425,000 45 $3,466,059,091
16669 Onondaga SOUTH ONONDAGA WATER DISTRICT / ONONDAGA (T) Extend Distribution System 400 $1,589,000 45 $3,467,648,091
16308 Onondaga COYE ROAD W. D. / LAFAYETTE (T) New Complete System (New System) 320 $804,000 45 $3,468,452,091
16306 Onondaga TOWN OF LAFAYETTE / LAFAYETTE (T) New Complete System (New System) 250 $2,000,000 45 $3,470,452,091
17458 Onondaga METROPOLITAN WATER BOARD / METROPOLITAN WATER BOARD Western Reservoir storage, Upgrade Storage 144,000 $10,800,000 40 $3,481,252,091
17459 Onondaga METROPOLITAN WATER BOARD / METROPOLITAN WATER BOARD Eastern Reservoir storage, Upgrade Storage 144,000 $14,300,000 40 $3,495,552,091
17460 Onondaga METROPOLITAN WATER BOARD / METROPOLITAN WATER BOARD Installing cover for Terminal Reservoir, Upgrade Storage 144,000 $16,050,000 40 $3,511,602,091
17024 Onondaga EAST SYRACUSE VILLAGE / EAST SYRACUSE (V) Cleaning and dredging of Gifford Finished WaterReservoir., Upgrade Storage 3,650 $158,862 40 $3,511,760,953
16552 Onondaga CAMILLUS CONSOLIDATED WD / CAMILLUS (T) Bitters Road, Extend Distribution System 24,000 $79,588 40 $3,511,840,541
15224 Onondaga OCWA / ONONDAGA CO. WATER AUTHORITY New Storage 185,000 $2,210,120 35 $3,514,050,661
16432 Onondaga JORDAN VILLAGE / JORDAN (V) Upgrade Pump Station 1,700 $63,000 30 $3,514,113,661
15144 Onondaga BALDWINSVILLE VILLAGE / BALDWINSVILLE (V) Upgrade Ground Water Source, Upgrade Distribution System 8,000 $3,887,530 25 $3,518,001,191
16120 Onondaga DEWITT WDS - SOUTH / DEWITT (T) New Storage, Upgrade Pump Station, Upgrade Distribution System 15,705 $1,750,000 20 $3,519,751,191
15155 Onondaga VAN BUREN WDS / VAN BUREN (T) Upgrade Distribution System 10,000 $858,000 20 $3,520,609,191
15145 Onondaga BALDWINSVILLE VILLAGE / BALDWINSVILLE (V) New Water Treatment Plant, New Ground Water Source, New Transmission 8,000 $425,390 20 $3,521,034,581
17325 Onondaga MINOA VILLAGE / MINOA (V) Upgrade Distribution System 3,348 $307,336 20 $3,521,341,917
17334 Onondaga CAMILLUS CONSOLIDATED WD / CAMILLUS (T) Upgrade Distribution System 24,000 $2,178,450 15 $3,523,520,367
16155 Onondaga CAMILLUS CONSOLIDATED WD / CAMILLUS (T) Upgrade Distribution System 24,000 $1,613,997 10 $3,525,134,364
16119 Onondaga DEWITT WDS - SOUTH / DEWITT (T) Inter-Connection 15,705 $1,432,000 10 $3,526,566,364
16616 Onondaga SKANEATELES VILLAGE / SKANEATELES (V) Upgrade Distribution System 2,800 $574,000 10 $3,527,140,364
15058 Onondaga ELBRIDGE VILLAGE / ELBRIDGE (V) Upgrade Transmission 1,519 $769,681 10 $3,527,910,045
Ontario
15727 Ontario HONEOYE CONSOLIDATED WD / RICHMOND (T) Extend system to serve area with private contaminated wells. , Extend Distribution System, Inter-Connection 2,000 $1,270,274 1,115 $3,529,180,319
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan
15734 Ontario MANCHESTER CENTRAL WATER DISTRICT / MANCHESTER (T) New Storage, Extend Distribution System, System Consolidation 581 $2,664,600 85 $3,531,844,919
17082 Ontario CLIFTON SPRINGS VILLAGE / CLIFTON SPRINGS (V) New Storage, Upgrade Distribution System 2,190 $618,000 70 $3,532,462,919
15159 Ontario NAPLES VILLAGE / NAPLES (V) Upgrade Transmission, New Storage, Upgrade Distribution System 1,500 $1,465,000 65 $3,533,927,919
16814 Ontario WEST BLOOMFIELD WD / WEST BLOOMFIELD (T) Extend system to serve area with private contaminated wells. , Extend Distribution System 1,550 $231,750 60 $3,534,159,669
16886 Ontario WEST BLOOMFIELD WD / WEST BLOOMFIELD (T) County Road 35 and Dugway Road. , Extend Distribution System 1,550 $195,513 60 $3,534,355,182
15545 Ontario OAKMOUNT ROAD WATER SYSTEM / EAST BLOOMFIELD (T) New Storage, Extend Distribution System 150 $2,224,000 55 $3,536,579,182
17378 Ontario GORHAM TOWN WD / GORHAM (T) Extension No. 9., Extend Distribution System 4,200 $732,000 50 $3,537,311,182
16040 Ontario GORHAM TOWN WD / GORHAM (T) New Pump Station, Extend Distribution System 4,200 $489,370 45 $3,537,800,552
16612 Ontario NORTH FARMINGTON WD / FARMINGTON (T) Fox Road & County Road 28., Extend Distribution System 1,900 $254,410 45 $3,538,054,962
16698 Ontario TOWN OF GENEVA / GENEVA (T) New Storage, New Distribution System 1,500 $2,541,000 45 $3,540,595,962
16792 Ontario PHELPS (T) WATER DISTRICT NO. 3 / PHELPS (T) Extend Distribution System 310 $1,295,000 45 $3,541,890,962
16793 Ontario PHELPS (T) WATER DISTRICT NO. 4 / PHELPS (T) Extend Distribution System 230 $710,000 45 $3,542,600,962
15210 Ontario PHELPS VILLAGE / PHELPS (V) New Transmission 2,118 $862,000 40 $3,543,462,962
15541 Ontario CANANDAIGUA TOWN CONS. WD / CANANDAIGUA (T) Extend Distribution System 4,350 $1,120,537 40 $3,544,583,499
15549 Ontario CANANDAIGUA TOWN CONS. WD / CANANDAIGUA (T) Extend Distribution System 4,350 $207,300 40 $3,544,790,799
16151 Ontario NORTH FARMINGTON WD / FARMINGTON (T) Extend Distribution System 1,900 $159,990 40 $3,544,950,789
15209 Ontario PHELPS (T) - ROUTE 96 WEST WD / PHELPS (T) Extend Distribution System 300 $1,132,000 40 $3,546,082,789
15208 Ontario PHELPS (T) - ROUTE 14 WD / PHELPS (T) Extend Distribution System 200 $1,125,000 40 $3,547,207,789
15554 Ontario WEST LAKE RD BENEFIT BASIS DIS / CANANDAIGUA (T) Canandaigua. (T), Extend Distribution System 195 $1,243,100 40 $3,548,450,889
15530 Ontario MAXWELL ROAD WATER DISTRICT / FARMINGTON (T) Rausler rd. and County Rd. 28., Extend Distribution System 75 $117,420 40 $3,548,568,309
15516 Ontario MAXWELL WATER DISTRICT EXT. 1 / FARMINGTON (T) County Road 28 from Maxwell Rd. to Fox Rd., Extend Distribution System 40 $90,813 40 $3,548,659,122
15526 Ontario MAXWELL ROAD WATER DISTRICT / FARMINGTON (T) Extend Distribution System 40 $138,999 40 $3,548,798,121
15542 Ontario COUNTY ROAD 30 - EAST BLOOMFIELD / EAST BLOOMFIELD (T) System Consolidation 60 $86,000 35 $3,548,884,121
16072 Ontario GENEVA CITY / GENEVA (C) Upgrade Distribution System 14,130 $1,223,640 30 $3,550,107,761
15520 Ontario VICTOR VILLAGE / VICTOR (V) Upgrade Transmission, Upgrade Distribution System 2,600 $170,000 25 $3,550,277,761
16357 Ontario CANANDAIGUA CITY / CANANDAIGUA (C) New Storage 11,264 $1,375,000 25 $3,551,652,761
15548 Ontario NYS RT. 5 EXTENSION - EAST BLOOMFIELD / EAST BLOOMFIELD (T) Inter-Connection 120 $199,563 25 $3,551,852,324
15217 Ontario BLOOMFIELD (V) - OAKMOUNT AVE / BLOOMFIELD (V) New Ground Water Source, New Storage 959 $978,500 20 $3,552,830,824
16041 Ontario GORHAM TOWN WD / GORHAM (T) New Pump Station, Upgrade Distribution System 4,200 $141,280 20 $3,552,972,104
16353 Ontario CANANDAIGUA CITY / CANANDAIGUA (C) Upgrade Transmission 11,264 $445,000 20 $3,553,417,104
16356 Ontario CANANDAIGUA CITY / CANANDAIGUA (C) Painting of storage tanks., Upgrade Storage 11,264 $450,000 20 $3,553,867,104
16358 Ontario CANANDAIGUA CITY / CANANDAIGUA (C) Replacement of water reservoir cover., Upgrade Storage 11,264 $375,000 20 $3,554,242,104
16885 Ontario WEST BLOOMFIELD WD / WEST BLOOMFIELD (T) Cathodic protection system., Upgrade Storage 1,550 $13,390 20 $3,554,255,494
15528 Ontario VICTOR VILLAGE / VICTOR (V) School Street Water Main., Upgrade Distribution System 2,600 $111,800 20 $3,554,367,294
16037 Ontario GORHAM TOWN WD / GORHAM (T) Upgrade Water Treatment Plant 4,200 $108,500 15 $3,554,475,794
16038 Ontario GORHAM TOWN WD / GORHAM (T) Upgrade Storage 4,200 $77,500 15 $3,554,553,294
16039 Ontario GORHAM TOWN WD / GORHAM (T) New Storage 4,200 $1,150,000 15 $3,555,703,294
15521 Ontario VICTOR VILLAGE / VICTOR (V) Upgrade Distribution System 2,600 $107,200 15 $3,555,810,494
15559 Ontario HOPEWELL WD #2 / HOPEWELL (T) New Pump Station 1,142 $435,600 15 $3,556,246,094
16352 Ontario CANANDAIGUA CITY / CANANDAIGUA (C) West Gibson Street water main., Upgrade Distribution System 11,264 $200,000 15 $3,556,446,094
16354 Ontario CANANDAIGUA CITY / CANANDAIGUA (C) North Street water main replacement., Upgrade Distribution System 11,264 $294,000 15 $3,556,740,094
16355 Ontario CANANDAIGUA CITY / CANANDAIGUA (C) Muar Lakes Water Main Replacement., Upgrade Distribution System 11,264 $110,000 15 $3,556,850,094
15226 Ontario CLIFTON SPRINGS THRUWAY SERVICE AREA / NYS THRUWAY AUTHORITY New Storage 1,643 $208,000 10 $3,557,058,094
15518 Ontario VICTOR VILLAGE / VICTOR (V) East Parkway, Covil Street., Upgrade Distribution System 2,600 $49,650 10 $3,557,107,744
16757 Ontario SHORTSVILLE VILLAGE / SHORTSVILLE (V) Upgrade Distribution System 1,320 $134,000 10 $3,557,241,744
Orange
17449 Orange HIGHLANDS (T) WD #2 / TOWN OF HIGHLANDS Phase 2 of DWSRF 16454, Upgrade Water Treatment Plant, New Storage 1,379 $4,748,700 2,095 $3,561,990,444
16750 Orange KIRYAS JOEL VILLAGE / KIRYAS JOEL (V) Phase 2 of project 16752., New Water Treatment Plant 16,442 $1,972,314 2,090 $3,563,962,758
17461 Orange PHEASANT HILL / PHEASANT HILL WATER CORP Rehabilitation of water system to address coliform contamination, Upgrade Water Treatment Plant, New Ground Water Source, New Storage 154 $2,938,700 165 $3,566,901,458
16751 Orange KIRYAS JOEL VILLAGE / KIRYAS JOEL (V) Expansion of service area to El Roi Estates, Monroe (T), Extend Distribution System 16,442 $2,245,040 145 $3,569,146,498
15450 Orange MIDDLETOWN CITY / MIDDLETOWN (C) Replacement of the Monhagen system water filtration plant, New Water Treatment Plant 26,000 $18,000,000 130 $3,587,146,498
16673 Orange MIDDLETOWN CITY / MIDDLETOWN (C) New Transmission, New Storage, New Distribution System 26,000 $8,000,000 130 $3,595,146,498
15227 Orange MAYBROOK VILLAGE / MAYBROOK (V) New Water Treatment Plant, New Ground Water Source 3,093 $238,000 110 $3,595,384,498
16075 Orange CHESTER VILLAGE / CHESTER (V) Upgrade Water Treatment Plant, New Ground Water Source, Upgrade Storage, New Storage, New Distribution System 3,448 $2,097,850 110 $3,597,482,348
15669 Orange MONROE WD #12 (MONROE HILLS ESTATES) / MONROE (T) Upgrade Ground Water Source, Upgrade Pump Station, Upgrade Distribution System 120 $497,087 110 $3,597,979,435
15722 Orange MONROE WD #8 (SKYVIEW HILLS) / MONROE (T) Extend system to serve area with private contaminated wells. , Upgrade Distribution System 544 $1,714,508 110 $3,599,693,943
15819 Orange KIRYAS JOEL VILLAGE / KIRYAS JOEL (V) Upgrade Water Treatment Plant 16,442 $734,500 105 $3,600,428,443
17294 Orange MONROE WATER DISTRICT / MONROE (T) Upgrade Ground Water Source, New Transmission, Upgrade Distribution System 15,000 $6,344,800 90 $3,606,773,243
16591 Orange GREENVILLE (T) MUNICIPAL WATER SYSTEM 'A' / GREENVILLE (T) Complete System (New System) 400 $2,319,060 90 $3,609,092,303
16906 Orange KIRYAS JOEL VILLAGE / KIRYAS JOEL (V) Pump Station and transmission main from NYC Aqueduct to (V) K.J., New Transmission, New Pump Station 16,442 $12,013,600 85 $3,621,105,903
17413 Orange WALLKILL CONSOLIDATED WD / WALLKILL (T) Rykoski Lane Water Treatment Plant, Upgrade Water Treatment Plant, New Pump Station, New Pump Station 13,700 $5,500,000 75 $3,626,605,903
15718 Orange MONROE WD #10 - PINE TREE ROAD / MONROE (T) New system to serve area with private contaminated wells. , New Transmission 50 $215,000 75 $3,626,820,903
17368 Orange GOSHEN VILLAGE / GOSHEN (V) New Water Treatment Plant, New Ground Water Source, New Transmission 5,676 $5,311,500 70 $3,632,132,403
17042 Orange MONROE VILLAGE / MONROE (V) Upgrade Distribution System 8,500 $986,000 70 $3,633,118,403
16027 Orange BLOOMING GROVE WD #1-WORLEY HE / BLOOMING GROVE (T) New Ground Water Source, Upgrade Storage 1,500 $392,000 65 $3,633,510,403
16144 Orange GOSHEN W.D. #1 (HAMBLETONIAN PARK) / GOSHEN (T) New Ground Water Source, New Storage, Upgrade Distribution System 509 $2,605,900 65 $3,636,116,303
17412 Orange MONROE WD #12 (MONROE HILLS ESTATES) / MONROE (T) Upgrade Water Treatment Plant, New Surface Water Source, Upgrade Storage 120 $1,370,930 65 $3,637,487,233
15072 Orange BEAVER DAM LAKE WATER CORP. / BEAVER DAM LAKE CORP. New Storage, Upgrade Distribution System 487 $766,700 60 $3,638,253,933
15816 Orange KIRYAS JOEL VILLAGE / KIRYAS JOEL (V) New Storage 16,442 $1,000,000 60 $3,639,253,933
16749 Orange KIRYAS JOEL VILLAGE / KIRYAS JOEL (V) Upgrade Pump Station 16,442 $872,247 45 $3,640,126,180
16150 Orange WARWICK (T) / WARWICK (T) New Storage, Upgrade Pump Station, Upgrade Distribution System, System Consolidation 300 $312,500 45 $3,640,438,680
17260 Orange HARRIMAN VILLAGE / HARRIMAN (V) Storage and Distribution System Extension, New Storage, Extend Distribution System 4,000 $3,104,000 45 $3,643,542,680
15078 Orange HOLIDAY MOBILE PARK INC. / MID-HUDSON PARK MANAGEMENT Upgrade Distribution System, System Consolidation 312 $412,000 45 $3,643,954,680
17450 Orange HIGHLANDS (T) WD #3 / TOWN OF HIGHLANDS New Water District 1,548 $8,105,700 45 $3,652,060,380
17293 Orange WAYAWANDA WD #1 / WAWAYANDA (T) Extend Distribution System 50 $208,941 45 $3,652,269,321
16036 Orange BLOOMING GROVE WD #3-TOMAHAWK / BLOOMING GROVE (T) New Ground Water Source 208 $306,000 40 $3,652,575,321
17348 Orange BELLVALE PARK W.D. / WARWICK (T) Replace wells, upgrade pump house and storage, New Ground Water Source, Upgrade Pump Station 100 $453,200 40 $3,653,028,521
15229 Orange SLEEPY HOLLOW MOBILE PARK / SLEEPY HOLLOW MHP, LLC Upgrade Transmission, Upgrade Distribution System 450 $386,250 40 $3,653,414,771
16321 Orange NEWBURGH CITY / NEWBURGH (C) Grand Street waterline replacement and lead service removal, Upgrade Distribution System 28,000 $4,635,000 40 $3,658,049,771
15182 Orange WOODBURY CONS. W.D. / WOODBURY (T) New Storage, New Pump Station, Upgrade Distribution System 9,075 $1,564,500 35 $3,659,614,271
15440 Orange NEW WINDSOR CONSOLIDATED WD / WINDSOR (T) New Storage 18,400 $154,500 35 $3,659,768,771
16312 Orange NEWBURGH CITY / NEWBURGH (C) Upgrade Distribution System 28,000 $1,545,000 35 $3,661,313,771
16147 Orange WESTSIDE GREENWOOD LAKE W.D. / WARWICK (T) Upgrade Distribution System 1,500 $100,000 35 $3,661,413,771
15666 Orange ORCHARD HILL ESTATES / ORCHARD HILL WATER CO. INC. Upgrade Ground Water Source, New Storage, Upgrade Distribution System 196 $1,123,730 30 $3,662,537,501
15635 Orange WASHINGTONVILLE VILLAGE / WASHINGTONVILLE (V) Upgrade Ground Water Source, Upgrade Distribution System 7,000 $435,000 30 $3,662,972,501
15966 Orange CORNWALL-ON-HUDSON / CORNWALL-ON-HUDSON (V) Upgrade Water Treatment Plant 8,500 $2,935,257 25 $3,665,907,758
16389 Orange NEWBURGH CONSOLIDATED WD / NEWBURGH (T) Upgrade Pump Station 17,000 $120,000 25 $3,666,027,758
16621 Orange HARRIMAN VILLAGE / HARRIMAN (V) River Road Pump Station, New Ground Water Source, New Pump Station 4,000 $128,750 25 $3,666,156,508
17159 Orange KNOLLS WATER CO., INC. / KNOLLS WATER COMPANY New Ground Water Source, Upgrade Storage, New Pump Station 230 $250,000 25 $3,666,406,508
15674 Orange SCOTT ACRES / SCOTT ACRES WATER CO. New Water Treatment Plant, New Ground Water Source, Upgrade Distribution System 117 $168,920 25 $3,666,575,428
15228 Orange PINE GROVE MOBILE HOME PARK / PINE GROVE MHP, LLC New Water Treatment Plant, Upgrade Transmission, New Storage, Upgrade Distribution System 516 $484,100 25 $3,667,059,528
15465 Orange NEW WINDSOR CONSOLIDATED WD / WINDSOR (T) Water filter plant expansion 3 mgd to 6 mgd, Upgrade Water Treatment Plant 18,400 $15,450,000 25 $3,682,509,528
15471 Orange NEW WINDSOR CONSOLIDATED WD / WINDSOR (T) New Pump Station 18,400 $515,000 25 $3,683,024,528
16424 Orange WARWICK VILLAGE / WARWICK (V) Taste & odor control, Upgrade Water Treatment Plant 6,083 $100,000 20 $3,683,124,528
15951 Orange O.C. RESIDENTIAL HEALTHCARE SE / ORANGE COUNTY New Water Treatment Plant, New Ground Water Source, New Storage, Upgrade Distribution System 1,245 $572,474 20 $3,683,697,002
15175 Orange WOODBURY CONS. W.D. / WOODBURY (T) New Ground Water Source, New Pump Station 9,075 $291,500 20 $3,683,988,502
15178 Orange WOODBURY CONS. W.D. / WOODBURY (T) New Water Treatment Plant, New Ground Water Source 9,075 $2,127,000 20 $3,686,115,502
17400 Orange HIGHLAND FALLS VILLAGE / HIGHLAND FALLS (V) Water Treatment Plant Filter Upgrades, Upgrade Water Treatment Plant 4,400 $329,672 20 $3,686,445,174
17291 Orange PINE BUSH WATER DISTRICT / CRAWFORD (T) New Ground Water Source 2,000 $165,000 20 $3,686,610,174
16529 Orange WHITLOCK FARMS / WHITLOCK FARMS WATER CORP. New Water Treatment Plant, Upgrade Distribution System 100 $83,740 20 $3,686,693,914
17346 Orange WOODBURY CONS. W.D. / WOODBURY (T) Repaint Overlook Storage Tank, Upgrade Storage 9,075 $218,360 20 $3,686,912,274
17038 Orange WARWICK VILLAGE / WARWICK (V) Upgrade Storage 6,083 $263,433 20 $3,687,175,707
16422 Orange WARWICK VILLAGE / WARWICK (V) Additional filtration unit at WTP, Upgrade Water Treatment Plant 6,083 $1,000,000 15 $3,688,175,707
16594 Orange CAMPBELL WATER SUPPLY SOUTH / CAMPBELLS WATER SUPPLY Upgrade Pump Station 4 $115,000 15 $3,688,290,707
15396 Orange NEW WINDSOR CONSOLIDATED WD / NEW WINDSOR (T) Water treatment plant modification raw water treatment, Upgrade Water Treatment Plant 18,400 $8,050,000 15 $3,696,340,707
16391 Orange NEWBURGH CONSOLIDATED WD / NEWBURGH (T) Upgrade Storage 17,000 $45,000 15 $3,696,385,707
17290 Orange WOODBURY CONS. W.D. / WOODBURY (T) Upgrade Storage 9,075 $218,360 15 $3,696,604,067
15398 Orange WASHINGTONVILLE VILLAGE / WASHINGTONVILLE (V) New Ground Water Source 7,000 $300,000 15 $3,696,904,067
15404 Orange WASHINGTONVILLE VILLAGE / WASHINGTONVILLE (V) New Storage 7,000 $665,000 15 $3,697,569,067
15405 Orange WASHINGTONVILLE VILLAGE / WASHINGTONVILLE (V) Upgrade Water Treatment Plant 7,000 $50,000 15 $3,697,619,067
16548 Orange WALDEN VILLAGE / WALDEN (V) New Storage 6,164 $716,500 15 $3,698,335,567
15458 Orange FLORIDA VILLAGE / FLORIDA (V) New Storage 2,591 $515,000 15 $3,698,850,567
17131 Orange TUXEDO PARK VILLAGE / TUXEDO PARK (V) Upgrade Distribution System 1,100 $263,000 15 $3,699,113,567
17316 Orange HIGHLAND FALLS VILLAGE / HIGHLAND FALLS (V) Upgrade Water Treatment Plant 4,400 $464,500 15 $3,699,578,067
17109 Orange MONROE DAY SCHOOL EXCEL / MONROE DAY SCHOOL Upgrade Water Treatment Plant 30 $141,000 15 $3,699,719,067
16451 Orange NEW WINDSOR CONSOLIDATED WD / NEW WINDSOR (T) Upgrade Distribution System 18,400 $618,500 10 $3,700,337,567
16153 Orange MONROE VILLAGE / MONROE (V) 500,000 gallon water storage tank, New Storage 8,500 $457,552 10 $3,700,795,119
16179 Orange MONROE VILLAGE / MONROE (V) Repainting of two water storage tanks, Upgrade Storage 8,500 $134,415 10 $3,700,929,534
16546 Orange WALDEN VILLAGE / WALDEN (V) New Ground Water Source 6,164 $865,000 10 $3,701,794,534
16076 Orange CHESTER VILLAGE / CHESTER (V) New Storage 3,448 $566,500 10 $3,702,361,034
16392 Orange NEWBURGH CONSOLIDATED WD / NEWBURGH (T) New water quality monitoring equipment, Other Expenses, Other (OT) 17,000 $20,000 10 $3,702,381,034
15180 Orange WOODBURY CONS. W.D. / WOODBURY (T) Upgrade Distribution System 9,075 $528,000 10 $3,702,909,034
16141 Orange MONROE VILLAGE / MONROE (V) Water meter replacement, Other Expenses, Other (OT) 8,500 $679,800 10 $3,703,588,834
15400 Orange WASHINGTONVILLE VILLAGE / WASHINGTONVILLE (V) Upgrade Distribution System 7,000 $1,500,000 10 $3,705,088,834
16545 Orange WALDEN VILLAGE / WALDEN (V) Upgrade Distribution System 6,164 $1,545,000 10 $3,706,633,834
16547 Orange WALDEN VILLAGE / WALDEN (V) Replacement of all water meters., Upgrade Other Expenses, Upgrade Other (OT) 6,164 $536,500 10 $3,707,170,334
16031 Orange BLOOMING GROVE WD #4-TAPPAN HO / BLOOMING GROVE (T) New Ground Water Source 500 $97,000 10 $3,707,267,334
16369 Orange BRAESIDE AQUA CORPORATION / BRAESIDE AQUA CORP. Upgrade Distribution System 326 $500,000 10 $3,707,767,334
16034 Orange BLOOMING GROVE WD #3-TOMAHAWK / BLOOMING GROVE (T) New Ground Water Source 208 $99,000 10 $3,707,866,334
16035 Orange BLOOMING GROVE WD #3-TOMAHAWK / BLOOMING GROVE (T) New Ground Water Source 208 $99,000 10 $3,707,965,334
16388 Orange NEWBURGH CONSOLIDATED WD / NEWBURGH (T) Upgrade Distribution System 17,000 $80,000 5 $3,708,045,334
15937 Orange MONROE VILLAGE / MONROE (V) New Ground Water Source 8,500 $379,555 5 $3,708,424,889
15963 Orange CORNWALL-ON-HUDSON / CORNWALL-ON-HUDSON (V) Upgrade Distribution System 8,500 $520,000 5 $3,708,944,889
16143 Orange MONROE VILLAGE / MONROE (V) Barnett Rd, East & West, Upgrade Distribution System 8,500 $2,626,696 5 $3,711,571,585
16148 Orange MONROE VILLAGE / MONROE (V) Round Lake Park, Upgrade Distribution System 8,500 $854,902 5 $3,712,426,487
15234 Orange GOSHEN VILLAGE / GOSHEN (V) Upgrade Water Treatment Plant 5,676 $417,850 5 $3,712,844,337
16484 Orange HIGHLAND FALLS VILLAGE / HIGHLAND FALLS (V) Upgrade Distribution System 4,400 $233,100 5 $3,713,077,437
15347 Orange PINE BUSH WATER DISTRICT / CRAWFORD (T) New Ground Water Source 2,000 $124,500 5 $3,713,201,937
Orleans
16032 Orleans HOLLEY VILLAGE / HOLLEY (V) New Ground Water Source, New Pump Station, Upgrade Distribution System 2,150 $456,000 130 $3,713,657,937
16381 Orleans LYNDONVILLE VILLAGE / LYNDONVILLE (V) Upgrade Transmission, Upgrade Distribution System 1,418 $1,612,864 75 $3,715,270,801
15183 Orleans TOWN OF SHELBY / SHELBY (T) Extend system to serve area with private contaminated wells. Water Improvement No. 4 - Phase I., Extend Distribution System 240 $249,700 65 $3,715,520,501
15185 Orleans TOWN OF SHELBY / SHELBY (T) Water Improvement No. 4 - Phase II., Extend Distribution System 240 $166,500 65 $3,715,687,001
16887 Orleans LYNDONVILLE VILLAGE / LYNDONVILLE (V) Upgrade Water Treatment Plant, New Storage 1,418 $2,251,000 60 $3,717,938,001
17097 Orleans MEDINA VILLAGE / MEDINA (V) Upgrade Distribution System 6,500 $4,088,085 60 $3,722,026,086
15166 Orleans GAINES W.D. #1 / GAINES (T) Extend Distribution System 1,152 $531,885 60 $3,722,557,971
15168 Orleans MURRAY W.D. #1 / MURRAY (T) Extend Distribution System 225 $154,677 60 $3,722,712,648
15167 Orleans KENDALL W.D. #1 / KENDALL (T) Extend Distribution System 1,418 $581,950 50 $3,723,294,598
15165 Orleans CLARENDON W.D. #1 / CLARENDON (T) Extension to Water District No. 3., Extend Distribution System 600 $1,008,000 50 $3,724,302,598
15360 Orleans CLARENDON W.D. #1 / CLARENDON (T) Extension to Water District #2., Extend Distribution System 600 $613,500 50 $3,724,916,098
15164 Orleans BARRE W.D. #1 / BARRE (T) Extend Distribution System 375 $473,800 50 $3,725,389,898
17262 Orleans HOLLEY VILLAGE / HOLLEY (V) NYS Route 31., Upgrade Distribution System 2,150 $210,243 35 $3,725,600,141
15741 Orleans CARLTON WATER DISTRICT / CARLTON (T) Upgrade Transmission 2,800 $250,000 15 $3,725,850,141
Oswego
16010 Oswego RICHLAND (T) W.D. NO. 1 / RICHLAND (T) New (T) Richland Water District #1 and consolidation of Brennan Beach Campground, New Complete System (New System), Extend Distribution System 250 $0 1,215 $3,725,850,141
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan
15394 Oswego SCRIBA WD (OSWEGO) / SCRIBA (T) New Storage, Upgrade Pump Station, New Pump Station, Extend Distribution System, Upgrade Distribution System 3,700 $4,533,334 1,135 $3,730,383,475
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan
16530 Oswego PULASKI VILLAGE / PULASKI (V) New Storage, New Pump Station 2,398 $0 1,120 $3,730,383,475
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan
17099 Oswego VOLNEY AIRPORT WATER SYSTEM / VOLNEY (T) New system to serve area with private contaminated wells, consolidate public water supply. , New Complete System (New System) 921 $0 1,105 $3,730,383,475
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan
17050 Oswego SANDY CREEK/LACONA JOINT WATERWORKS / SANDY CREEK/LACONA (V) Address inadequate source capacity & system pressure, E-Coli violation., Upgrade Ground Water Source, Upgrade Distribution System 1,435 $4,775,000 225 $3,735,158,475
17273 Oswego TOWN OF MEXICO AREA #1 / MEXICO (T) New Ground Water Source, New Storage, New Distribution System 1,400 $8,480,000 190 $3,743,638,475
17373 Oswego (T) GRANBY WD#3 / GRANBY (T) New Storage, New Pump Station, New Distribution System 1,500 $9,965,000 180 $3,753,603,475
17181 Oswego ROUTE 11 NORTH/FULLER RD. WD / HASTINGS (T) Consolidate public water supplies with past coliform and pressure violations, New Storage, New Distribution System, New System Consolidation 3,000 $9,403,900 155 $3,763,007,375
17374 Oswego (T) NEWHAVEN WD#3 / NEW HAVEN (T) New Pump Station, New Distribution System 1,600 $9,965,000 135 $3,772,972,375
17372 Oswego (T) MEXICO WD#2 / MEXICO (T) New Ground Water Source, New Storage, New Distribution System 1,400 $9,675,000 135 $3,782,647,375
15204 Oswego TOWN OF HANNIBAL / HANNIBAL (T) Extend system to serve area with private contaminated wells, consolidate public water supply. , New Complete System (New System), Extend Distribution System, System Consolidation 1,200 $2,400,000 90 $3,785,047,375
16314 Oswego MINETTO TOWN WATER DISTRICT / MINETTO (T) Extend Distribution System 1,589 $412,000 70 $3,785,459,375
17285 Oswego HANNIBAL TOWN WATER DISTRICT #2 / HANNIBAL (T) Extend Distribution System 2,000 $1,715,000 60 $3,787,174,375
16903 Oswego PARISH (V) / PARISH (V) New Complete System (New System) 600 $2,980,000 60 $3,790,154,375
16261 Oswego TOWN OF CONSTANTIA / CONSTANTIA (T) New Complete System (New System), New Pump Station, Extend Distribution System 1,500 $4,924,000 55 $3,795,078,375
16091 Oswego CAUGHDENOY/CR 37 WATER DISTRICT / HASTINGS (T) New Complete System (New System), Extend Distribution System, System Consolidation 711 $1,445,000 55 $3,796,523,375
16978 Oswego OSWEGO CITY / OSWEGO (C) Upgrade Water Treatment Plant 29,400 $4,532,000 50 $3,801,055,375
16173 Oswego PONDEROSA TRAILER PARK, INC. / PONDEROSA TRAILER PARK INC. Upgrade Water Treatment Plant 60 $17,400 50 $3,801,072,775
15833 Oswego TOWN OF WEST MONROE / WEST MONROE (T) New Complete System (New System), Extend Distribution System 500 $979,000 50 $3,802,051,775
16205 Oswego SENECA HILLS HEALTH CAMPUS / VOLNEY (T) Upgrade Distribution System 450 $1,903,000 50 $3,803,954,775
15677 Oswego FULTON CITY / FULTON (C) Upgrade Storage 14,000 $412,000 40 $3,804,366,775
17187 Oswego OSWEGO CITY / OSWEGO (C) Upgrade Distribution System 29,400 $734,367 35 $3,805,101,142
15681 Oswego FULTON CITY / FULTON (C) Upgrade Pump Station 14,000 $82,700 35 $3,805,183,842
15690 Oswego FULTON CITY / FULTON (C) Upgrade Distribution System 14,000 $720,000 35 $3,805,903,842
16138 Oswego PHOENIX VILLAGE / PHOENIX (V) State Street water main replacement., Upgrade Distribution System 2,800 $90,125 35 $3,805,993,967
17302 Oswego PULASKI VILLAGE / PULASKI (V) New Transmission, Upgrade Distribution System 2,398 $762,200 35 $3,806,756,167
16600 Oswego MEXICO VILLAGE / MEXICO (V) New Storage 1,600 $1,000,000 30 $3,807,756,167
15683 Oswego FULTON CITY / FULTON (C) Upgrade Ground Water Source 14,000 $2,300,000 30 $3,810,056,167
15686 Oswego FULTON CITY / FULTON (C) New Storage 14,000 $1,000,000 30 $3,811,056,167
15784 Oswego GRANBY (T) -HANNIBAL STREET / GRANBY (T) New Complete System (New System), Upgrade Distribution System 50 $195,000 20 $3,811,251,167
Otsego
16146 Otsego MILFORD VILLAGE / MILFORD (V) New Ground Water Source, Upgrade Distribution System 510 $0 1,130 $3,811,251,167
NOTE: Short - Term Loan Closed, Project Cost Shown is Remaining Balance Not Funded With Short Term Loan
15254 Otsego EDMESTON WATER DISTRICT / EDMESTON (T) Upgrade Ground Water Source, Upgrade Transmission, Upgrade Distribution System 490 $2,065,150 165 $3,813,316,317
17292 Otsego TOWN OF ONEONTA WATER DISTRICT NO. 3 / ONEONTA (T) Extend system to serve area with private contaminated wells, consolidate public water supply, eliminate public water supply with past total coliform detection., New Storage, Extend Distribution System 50 $1,021,250 145 $3,814,337,567
17093 Otsego HARTWICK WATER DISTRICT / HARTWICK (T) WD New Ground Water Source, New Storage, Upgrade Distribution System 415 $1,745,850 95 $3,816,083,417
15343 Otsego UNADILLA VILLAGE / UNADILLA (V) New Ground Water Source, Upgrade Storage, Upgrade Distribution System 1,265 $2,254,000 70 $3,818,337,417
17092 Otsego LAURENS VILLAGE / LAURENS (V) New Storage, Upgrade Distribution System 382 $1,236,000 60 $3,819,573,417
16255 Otsego GILBERTSVILLE VILLAGE / GILBERTSVILLE (V) Upgrade Water Treatment Plant, Upgrade Distribution System 475 $206,200 40 $3,819,779,617
16335 Otsego MORRIS VILLAGE / MORRIS (V) New Water Treatment Plant, New Ground Water Source, New Storage 642 $268,500 40 $3,820,048,117
15079 Otsego RIVERSIDE VILLAGE MHP / RIVERSIDE VILLAGE MHP Upgrade Distribution System 150 $20,600 25 $3,820,068,717
Putnam
16598 Putnam BREWSTER HEIGHTS / SOUTHEAST (T) Remaining portion of 15857 which was funded 3/26/98., New Water Treatment Plant 698 $689,650 155 $3,820,758,367
16675 Putnam CARMEL (T) WD #13 / CARMEL (T) New system to serve area with private contaminated wells, consolidate public water supply. Hamlet of Mahopac/Rolling Greens., Complete System (New System) 300 $975,000 85 $3,821,733,367
17298 Putnam BREWSTER VILLAGE / BREWSTER (V) New Ground Water Source, New Pump Station 2,000 $1,610,920 80 $3,823,344,287
16634 Putnam KENT (T) WD #3 / KENT (T) New Water Treatment Plant, New Ground Water Source, New Storage, New Pump Station, New Distribution System 8,000 $15,235,451 75 $3,838,579,738
16579 Putnam WILLIAMSBURG RIDGE CONDO W.S. / WILLIAMSBURG RIDGE HOA, INC. Wiiliamsburg Ridge Condominiums, Mahopac, NY, New Ground Water Source 230 $40,000 60 $3,838,619,738
16083 Putnam MILL POND WATER SUPPLY / MILL PONDS WATER CO. New Ground Water Source 70 $100,000 60 $3,838,719,738
15181 Putnam VISTA ON THE LAKE COND / VISTA ON THE LAKE CONDO New Water Treatment Plant 425 $37,853 55 $3,838,757,591
15430 Putnam BREWSTER VILLAGE / BREWSTER (V) New Storage 2,000 $1,628,000 50 $3,840,385,591
17319 Putnam MOUNTAIN BROOK HOMES / SOUTHEAST (T) New Water Treatment Plant, New Ground Water Source 176 $427,000 50 $3,840,812,591
17297 Putnam BREWSTER VILLAGE / BREWSTER (V) Upgrade Distribution System 2,000 $8,102,487 45 $3,848,915,078
15862 Putnam SPRINGHOUSE ESTATES W.W. CORP. / SPRINGHOUSE ESTATES WW CORP New Ground Water Source 212 $67,600 25 $3,848,982,678
16632 Putnam KENT WD 1 / KENT (T) Upgrade Water Treatment Plant, Upgrade Storage, Upgrade Pump Station, Upgrade Distribution System 360 $1,152,261 20 $3,850,134,939
16633 Putnam KENT WD 2 / KENT (T) Upgrade Water Treatment Plant, Upgrade Storage, Upgrade Pump Station, Upgrade Distribution System 276 $927,000 20 $3,851,061,939
15792 Putnam CONTINENTAL VILLAGE WD / PHILIPSTOWN (T) Upgrade Distribution System 1,509 $1,350,000 15 $3,852,411,939
17411 Putnam SUNRISE RIDGE / SUNRISE RIDGE WATER COMPANY Replace pumps and storage, Upgrade Storage, Upgrade Pump Station 178 $250,000 15 $3,852,661,939
16506 Putnam GLENMAR GARDENS IMPROVMT DIST / PUTNAM VALLEY (T) Upgrade Distribution System 130 $25,500 15 $3,852,687,439
Rensselaer
17331 Rensselaer TOWN OF POESTENKILL WD #1 / POESTENKILL (T) New Complete System (New System), New System Consolidation 2,300 $9,029,151 175 $3,861,716,590
16736 Rensselaer HIGHWAY GARAGE WD / SCHODACK (T) Extend to consolidate PWS with e-coli contamination, and to serve private contaminated wells, New Ground Water Source, New Distribution System 12,000 $3,295,022 160 $3,865,011,612
17357 Rensselaer SCHODACK WATER DISTRICT #5/PONDVIEW / SCHODACK (T) Eliminate PWS with past coliform detection. Interconnectionn of Town WD 5, WD 2A Inglewood, WD 4 Golfview Estates, and Byers Estates, New Water District 8, New Storage, Extend Distribution System, New System Consolidation 215 $2,231,410 150 $3,867,243,022
15080 Rensselaer HOOSICK FALLS (V) PWS / HOOSICK FALLS (V) Upgrade Water Treatment Plant, New Ground Water Source, Upgrade Distribution System 4,000 $2,530,000 120 $3,869,773,022
17358 Rensselaer SCHODACK WATER DISTRICT #3/MAPLE CREST / SCHODACK (T) Connect WD #3 (Maple Crest) to WD #1 (Clearview), Extend Distribution System, New System Consolidation 140 $1,100,000 105 $3,870,873,022
15754 Rensselaer RENSSELAER CITY PWS / RENSSELAER(C), E. GREENBUSH(T) Upgrade Pump Station 7,500 $983,100 95 $3,871,856,122
15758 Rensselaer RENSSELAER CITY PWS / RENSSELAER(C), E. GREENBUSH(T) Installation of new 4million gal. tank & improvements to existing 4million tank., Upgrade Storage 7,500 $2,825,000 90 $3,874,681,122
17445 Rensselaer NORTH GREENBUSH (T) WATER DISTRICT NO. 18 / NORTH GREENBUSH (T) Purchase existing Private Water System, Connect to Municipal Water System , New System Consolidation, New Water District 212 $437,750 85 $3,875,118,872
15580 Rensselaer CASTLETON VILLAGE PWS / CASTLETON-ON-HUDSON (V) Upgrade Ground Water Source, Upgrade Transmission, Upgrade Pump Station, Upgrade Distribution System 2,013 $2,000,000 80 $3,877,118,872
17068 Rensselaer SCHAGHTICOKE (V) PWS / SCHAGHTICOKE (V)   675 $2,753,200 80 $3,879,872,072
17077 Rensselaer NORTH GREENBUSH WD #13 / NORTH GREENBUSH (T) New system to serve area with private contaminated wells (Snyder's Lake Area). , New System Consolidation, New Water District 1,050 $4,635,000 80 $3,884,507,072
17139 Rensselaer EAST GREENBUSH GENERAL W.D. / EAST GREENBUSH (T) Upgrade Storage, New Storage 10,200 $1,949,275 75 $3,886,456,347
17229 Rensselaer NORTH GREENBUSH WD #14 / NORTH GREENBUSH (T) New system to serve inadequate private wells in Northeast corner of Town , New Inter-Connection, New System Consolidation, New Water District 3,000 $7,313,000 75 $3,893,769,347
15907 Rensselaer TOWN OF SAND LAKE / SAND LAKE (T) New Complete System (New System) 5,100 $4,738,000 70 $3,898,507,347
15688 Rensselaer TOWN OF HOOSICK WD / HOOSICK (T) Extend Distribution System 400 $1,544,000 70 $3,900,051,347
15709 Rensselaer TROY CITY PWS / TROY (C) New Transmission, Upgrade Distribution System, System Consolidation 54,269 $387,500 60 $3,900,438,847
17149 Rensselaer PETERSBURGH WATER DISTRICT / PETERSBURGH (T) Upgrade Water Treatment Plant, New Ground Water Source, Upgrade Distribution System 240 $842,025 45 $3,901,280,872
16302 Rensselaer GRAFTON WATER SYSTEM / GRAFTON (T) New Complete System (New System) 1,700 $1,905,000 45 $3,903,185,872
15749 Rensselaer RENSSELAER CITY PWS / RENSSELAER (C) New Distribution System 7,500 $2,714,000 40 $3,905,899,872
17387 Rensselaer TROY CITY PWS / TROY (C) Upgrade Distribution System 54,269 $736,000 40 $3,906,635,872
15216 Rensselaer VALLEY FALLS WATER SYSTEM / VALLEY FALLS (V) New Ground Water Source, New Storage, Upgrade Distribution System 538 $2,277,000 40 $3,908,912,872
15286 Rensselaer SCHAGHTICOKE WATER DISTRICT #1 / SCHAGHTICOKE (T) Extend Distribution System 154 $215,644 40 $3,909,128,516
16073 Rensselaer PETERSBURGH WATER DISTRICT / PETERSBURG (T) Upgrade Ground Water Source 240 $109,154 35 $3,909,237,670
16303 Rensselaer TROY CITY PWS / TROY (C) Upgrade Distribution System 54,269 $2,100,000 35 $3,911,337,670
15752 Rensselaer EAST GREENBUSH GENERAL W.D. / EAST GREENBUSH (T) Distribution improvements installing four (4) pressure regulators, Upgrade Distribution System 10,200 $146,200 30 $3,911,483,870
15766 Rensselaer EAST GREENBUSH GENERAL W.D. / EAST GREENBUSH (T) Hampton Manor upper service area, Upgrade Distribution System 10,200 $187,500 25 $3,911,671,370
15744 Rensselaer RENSSELAER CITY PWS / RENSSELAER (C) Upgrade Distribution System 7,500 $435,700 25 $3,912,107,070
15746 Rensselaer RENSSELAER CITY PWS / RENSSELAER (C) Storage improvements-rehabilitation of interior and exterior near Jorden Lane., Upgrade Storage 7,500 $217,500 25 $3,912,324,570
16292 Rensselaer BRUNSWICK WATER SYSTEM / BRUNSWICK (T) New Water Treatment Plant, Upgrade Distribution System 10,000 $2,896,500 20 $3,915,221,070
15771 Rensselaer EAST GREENBUSH GENERAL W.D. / EAST GREENBUSH (T) Distribution improvements to the Hampton Manor lower service area, Upgrade Distribution System 10,200 $139,000 20 $3,915,360,070
15687 Rensselaer EAST GREENBUSH GENERAL W.D. / EAST GREENBUSH (T) New Storage 10,200 $757,000 20 $3,916,117,070
15410 Rensselaer BERLIN WATER DISTRICT # 2 / BERLIN (T) Upgrade Distribution System 700 $1,232,004 20 $3,917,349,074
16149 Rensselaer SCHAGHTICOKE (V) PWS / SCHAGHTICOKE (V) Upgrade Storage, Upgrade Pump Station 675 $581,198 20 $3,917,930,272
16334 Rensselaer HOOSICK FALLS (V) PWS / HOOSICK FALLS (V) Upgrade Distribution System 4,000 $569,000 20 $3,918,499,272
15717 Rensselaer EAST GREENBUSH GENERAL W.D. / EAST GREENBUSH (T) Distribution extension, loop water main on Gilligan Road to Hays Road, Upgrade Distribution System 10,200 $409,000 15 $3,918,908,272
15679 Rensselaer EAST GREENBUSH GENERAL W.D. / EAST GREENBUSH (T) Distribution extension loop on Red Mill Road and loop through OC Zoning District, Extend Distribution System 10,200 $2,791,000 10 $3,921,699,272
15564 Rensselaer NASSAU (V) PWS / NASSAU (V) Upgrade Distribution System 1,250 $258,600 10 $3,921,957,872
Rockland
16298 Rockland NYACK VILLAGE WATER SUPPLY / NYACK (V) Relocation of intake to correct turbidity violations., New Transmission 14,700 $1,340,000 110 $3,923,297,872
17313 Rockland LAKE WELCH BEACH W.S. / PALISADES INTERSTATE PARK COMM New Water Treatment Plant, New Transmission 15,000 $20,000,000 100 $3,943,297,872
16018 Rockland SUFFERN VILLAGE / SUFFERN (V) Upgrade Distribution System 12,000 $603,600 5 $3,943,901,472