Final Intended Use Plan for the New York State Drinking Water State Revolving Fund
II. Project Multi-Year List
II. A. Project Multi-Year List Additions
| Project | County | System Name/ Borrower |
Description | Project Cost |
Score | Comments |
|---|---|---|---|---|---|---|
| 17515 | Orange | NEWBURGH CITY / Newburgh (C) | Phase 2 of project 16754 Cost overrun, Upgrade Water Treatment Plant, Upgrade Transmission | $2,077,162 | 2,165 | New project with engineering report received after draft IUP printing. |
| 17518 | Westchester | BEDFORD CONSOLIDATED W.D. / Bedford (T) | New Water Treatment Plant, New Inter-Connection | $20,000,000 | 2,130 | Project 17463 divided into two phases (17463 & 17518) after Draft IUP printing. |
| 17520 | Westchester | PEEKSKILL CITY / Peekskill (C) | New Water Treatment to correct organic (DBP's) exceedances. Phase 2 of 17152., New Water Treatment Plant | $9,000,000 | 2,080 | New preapplication received after draft IUP printing. |
| 16010 | Oswego | RICHLAND (T) W.D. NO. 1 / Richland (T) | New (T) Richland Water District #1 and consolidation of Brennan Beach Campground, New Complete System (New System), Extend Distribution System | $0 | 1,215 | Project was anticipated to close during the previous funding cycle and was excluded from the draft IUP. Project did not close. |
| 15680 | Erie | COLDEN (T) WATER DISTRICT #1 / Colden (T) | Extend to serve private contaminated wells, consolidate public water supplies, eliminate public water supply with past coliform detections., Extend Distribution System | $1,000,000 | 1,120 | Project was anticipated to close during the previous funding cycle and was excluded from the draft IUP. Project did not close. |
| 17544 | Oneida | TOWN/VILLAGE WATER SYSTEM / Vernon (T)&(V) | New Surface Water Treatment Rule Compliance Facility, Upgrade Transmission, New Storage, Upgrade Pump Station, New Distribution System, New System Consolidation | $10,003,000 | 230 | New project with engineering report received after draft IUP printing. |
| 17550 | Tompkins | GROTON VILLAGE / Groton (V) | New Surface Water Treatment Rule Compliance Facility | $323,719 | 210 | New project with engineering report received after draft IUP printing. |
| 17538 | Oswego | WATER DISTRICT #2 / Richland (T) | New Surface Water Treatment Rule Compliance Facility, New Ground Water Source, New Transmission, New Storage, New Distribution System | $9,560,000 | 200 | New project with engineering report received after draft IUP printing. |
| 17552 | Herkimer | NEWPORT VILLAGE / Newport (V) | Install treatment system for GWUDI springs with wet well, booster pumps, new automated control system, new storage tank, replace two severely aged mains including asbestos main on street for new tank site., New Surface Water Treatment Rule Compliance Facility, Upgrade Transmission, New Storage, Upgrade Distribution System | $3,150,000 | 175 | New pre-application received after draft IUP printing. |
| 17522 | Ontario | NAPLES VILLAGE / Naples (V) | Address GWUDI spring sources., New Surface Water Treatment Rule Compliance Facility, Upgrade Ground Water Source, Upgrade Distribution System | $1,746,869 | 165 | New project with engineering report received after draft IUP printing. |
| 17537 | Delaware | DOWNSVILLE WATER DISTRICT / Colchester (T) | Package Filtration Plant for GWUDI Spring Source and Addition of Corrosion Control Treatment., New Surface Water Treatment Rule Compliance Facility, New Water Treatment Plant | $92,400 | 165 | New project with engineering report received after draft IUP printing. |
| 17225 | Oneida | HAMLET OF VIENNA WD / Vienna (T) | New Surface Water Treatment Rule Compliance Facility, New Water District | $4,500,000 | 160 | Project was anticipated to close during the previous funding cycle and was excluded from the draft IUP. Project did not close. |
| 17181 | Oswego | ROUTE 11 NORTH/FULLER RD. WD / Hastings (T) | Consolidate public water supplies with past coliform and pressure violations, New Storage, New Distribution System, New System Consolidation | $9,403,900 | 155 | Project was anticipated to close during the previous funding cycle and was excluded from the draft IUP. Project did not close. |
| 17514 | Cattaraugus | DELEVAN VILLAGE / Delevan (V) | New Surface Water Treatment Rule Compliance Facility, Upgrade Ground Water Source, Upgrade Storage, Upgrade Distribution System | $1,608,425 | 145 | New project with engineering report received after draft IUP printing. |
| 17535 | Saratoga | SOUTH GLENS FALLS VILLAGE / South Glens Falls (V) | Proposed Membrane Filtration Plant with SCADA to treat Village GWUDI spring sources., New Surface Water Treatment Rule Compliance Facility, New Surface Water Treatment Rule Compliance Facility | $4,220,000 | 135 | New preapplication received after draft IUP printing. |
| 16496 | Ulster | NAPANOCH WATER DISTRICT / Wawarsing (T) | New Ground Water Source, New Transmission | $7,649,100 | 135 | Project was anticipated to close during the previous funding cycle and was excluded from the draft IUP. Project did not close. |
| 17516 | St.Lawrence | OSWEGATCHIE (T) / Oswegatchie (T) | Joint water system improvement project between (T) Oswegatchie, (T) Lisbon and (V) Huevelton, Upgrade Ground Water Source, Upgrade Storage, Upgrade Distribution System, New Inter-Connection, New System Consolidation | $10,973,000 | 120 | New project with engineering report received after draft IUP printing. |
| 17513 | Essex | WINEBROOK HILLS WD / Newcomb (T) | New Ground Water Source, Upgrade Distribution System | $1,412,130 | 105 | New pre-application received after draft IUP printing. |
| 17512 | St.Lawrence | NEWTON FALLS WATER DISTRICT / Clifton (T) | New Ground Water Source | $800,000 | 90 | New project with engineering report received after draft IUP printing. |
| 17523 | Orange | MONTGOMERY W.D. #1 / Town of Montgomery | Extend WD #1 to consolidate several water supplies, New System Consolidation | $269,730 | 90 | New project with engineering report received after draft IUP printing. |
| 17543 | Saratoga | MOREAU WD 7 / Moreau (T) | New Water District to connect about 135 homes with wells, loop several large areas, connect 2 small CWSs, and consolidate WD 1., Extend Distribution System, New Water District | $2,572,000 | 80 | New pre-application received after draft IUP printing. |
| 17510 | Oswego | NORTH AREA WD / Volney (T) | New Distribution System, New System Consolidation | $6,540,000 | 80 | New project with engineering report received after draft IUP printing. |
| 17533 | Clinton | CHAMPLAIN VILLAGE / Champlain (V) | Upgrade Water Treatment Plant, New Storage, Upgrade Distribution System | $1,883,226 | 75 | New project with engineering report received after draft IUP printing. |
| 17526 | Allegany | WELLSVILLE WATER DISTRICT / Wellsville (T) | Extend Distribution System, New Water District | $1,192,450 | 70 | New project with engineering report received after draft IUP printing. |
| 17530 | Hamilton | HAMLET OF INLET / Inlet (T) | $2,674,765 | 65 | New pre-application received after draft IUP printing. | |
| 17548 | Albany | MENANDS VILLAGE / Menands (V) | Upgrade Pump Station, Upgrade Distribution System | $5,655,000 | 60 | New project with engineering report received after draft IUP printing. |
| 17553 | Oneida | HAMLET OF VIENNA WD / Vienna (T) | Extend Distribution System | $4,935,050 | 60 | New pre-application received after draft IUP printing. |
| 17547 | Broome | WHITNEY POINT VILLAGE / Whitney Point (V) | New Wells, Main Street Wellfield/Pumphouse Improvements., Upgrade Ground Water Source, New Ground Water Source | $470,000 | 55 | New project with engineering report received after draft IUP printing. |
| 17529 | Jefferson | TIBBETS POINT WATER DISTRICT / Cape Vincent (T) | New Water District | $1,962,000 | 55 | New pre-application received after draft IUP printing. |
| 17536 | Washington | FORT EDWARD VILLAGE / Fort Edward (V) | Replacement of water main beneath Hudson River to Rogers Island., Upgrade Transmission | $160,200 | 50 | New pre-application received after draft IUP printing. |
| 17545 | Fulton | JOCKEYVILLE ESTATES II / Saratoga LLC | Install transmission main of 2000 feet length to connect existing MHP with municipal PWS., Extend Transmission | $92,000 | 50 | New pre-application received after Draft IUP printing. |
| 17546 | Fulton | SANDYLAND MHP / Sandyland MHP | Transmission Main of 1200 feet to connect existing MHP to municipal PWS extension., Extend Transmission | $60,000 | 50 | New pre-application received after Draft IUP printing. |
| 17521 | Ontario | RUSHVILLE VILLAGE / Rushville (V) | New Pump Station | $473,800 | 45 | New pre-application received after draft IUP printing. |
| 17507 | Ontario | SENECA WD NO.1 / Seneca (T) | New Complete System (New System), New Pump Station, New Distribution System | $1,529,500 | 45 | New preapplication received prior to draft IUP printing. Was omitted from draft IUP due to data input error. |
| 17511 | Ontario | CANANDAIGUA CITY / Canandaigua (C) | Upgrade Storage, New Storage | $4,893,145 | 30 | New preapplication received after draft IUP printing. |
| 17517 | Niagara | LOCKPORT CITY WTP / Lockport (C) | Replace waterline on Market St. between Union and Spring , Upgrade Distribution System | $640,000 | 30 | New project with engineering report received after draft IUP printing. |
| 17524 | Westchester | NORTH CASTLE WD #2 / Town of New Castle | New well and storage, New Ground Water Source, New Storage | $1,458,695 | 25 | New project with engineering report received after draft IUP printing. |
| 17540 | Genesee | OAKFIELD VILLAGE / Oakfield (V) | Upgrade Transmission, Upgrade Storage, Upgrade Distribution System | $1,147,575 | 25 | New Project with engineering report received after draft IUP printing. |
| 17542 | Monroe | WEBSTER VILLAGE / Webster (V) | Upgrade Storage | $400,826 | 25 | New pre-application received after draft IUP printing. |
| 17551 | Orange | ARLUCK WATER DISTRICT / Wawayanda (T) | Replacement of existing hydropneumatic system for the Arluck WD, Upgrade Pump Station | $85,000 | 20 | New preapplication received after draft IUP printing. |
| 17525 | Westchester | NORTH CASTLE WD #1 / Town of North Castle | Rehabilitation of water storage tanks, Upgrade Storage | $813,500 | 15 | New project with engineering report received after draft IUP printing. |
| 17527 | Genesee | OAKFIELD VILLAGE / Oakfield (V) | Upgrade Transmission, Upgrade Distribution System | $1,147,575 | 15 | New project with engineering report received after draft IUP printing. |
| 17539 | Rensselaer | CASTLETON VILLAGE PWS / Castleton-on-Hudson (V) | Replacement in-kind of aged water mains., Upgrade Distribution System | $1,661,400 | 10 | New project with engineering report received after draft IUP printing. |
| 17532 | Erie | EXTENSION OF WD#2 / Boston (T) | Extend Water District | $2,324,177 | 5 | New preapplication received after draft IUP printing. |
| 17531 | Erie | BOSTON WD #2 / Boston (T) | $2,499,100 | 5 | New preapplication received after draft IUP printing. |