Final Intended Use Plan for the New York State Drinking Water State Revolving Fund

II. Project Multi-Year List

II. A. Project Multi-Year List Additions

Project County System Name/
Borrower
Description Project
Cost
Score Comments
17515 Orange NEWBURGH CITY / Newburgh (C) Phase 2 of project 16754 Cost overrun, Upgrade Water Treatment Plant, Upgrade Transmission $2,077,162 2,165 New project with engineering report received after draft IUP printing.
17518 Westchester BEDFORD CONSOLIDATED W.D. / Bedford (T) New Water Treatment Plant, New Inter-Connection $20,000,000 2,130 Project 17463 divided into two phases (17463 & 17518) after Draft IUP printing.
17520 Westchester PEEKSKILL CITY / Peekskill (C) New Water Treatment to correct organic (DBP's) exceedances. Phase 2 of 17152., New Water Treatment Plant $9,000,000 2,080 New preapplication received after draft IUP printing.
16010 Oswego RICHLAND (T) W.D. NO. 1 / Richland (T) New (T) Richland Water District #1 and consolidation of Brennan Beach Campground, New Complete System (New System), Extend Distribution System $0 1,215 Project was anticipated to close during the previous funding cycle and was excluded from the draft IUP. Project did not close.
15680 Erie COLDEN (T) WATER DISTRICT #1 / Colden (T) Extend to serve private contaminated wells, consolidate public water supplies, eliminate public water supply with past coliform detections., Extend Distribution System $1,000,000 1,120 Project was anticipated to close during the previous funding cycle and was excluded from the draft IUP. Project did not close.
17544 Oneida TOWN/VILLAGE WATER SYSTEM / Vernon (T)&(V) New Surface Water Treatment Rule Compliance Facility, Upgrade Transmission, New Storage, Upgrade Pump Station, New Distribution System, New System Consolidation $10,003,000 230 New project with engineering report received after draft IUP printing.
17550 Tompkins GROTON VILLAGE / Groton (V) New Surface Water Treatment Rule Compliance Facility $323,719 210 New project with engineering report received after draft IUP printing.
17538 Oswego WATER DISTRICT #2 / Richland (T) New Surface Water Treatment Rule Compliance Facility, New Ground Water Source, New Transmission, New Storage, New Distribution System $9,560,000 200 New project with engineering report received after draft IUP printing.
17552 Herkimer NEWPORT VILLAGE / Newport (V) Install treatment system for GWUDI springs with wet well, booster pumps, new automated control system, new storage tank, replace two severely aged mains including asbestos main on street for new tank site., New Surface Water Treatment Rule Compliance Facility, Upgrade Transmission, New Storage, Upgrade Distribution System $3,150,000 175 New pre-application received after draft IUP printing.
17522 Ontario NAPLES VILLAGE / Naples (V) Address GWUDI spring sources., New Surface Water Treatment Rule Compliance Facility, Upgrade Ground Water Source, Upgrade Distribution System $1,746,869 165 New project with engineering report received after draft IUP printing.
17537 Delaware DOWNSVILLE WATER DISTRICT / Colchester (T) Package Filtration Plant for GWUDI Spring Source and Addition of Corrosion Control Treatment., New Surface Water Treatment Rule Compliance Facility, New Water Treatment Plant $92,400 165 New project with engineering report received after draft IUP printing.
17225 Oneida HAMLET OF VIENNA WD / Vienna (T) New Surface Water Treatment Rule Compliance Facility, New Water District $4,500,000 160 Project was anticipated to close during the previous funding cycle and was excluded from the draft IUP. Project did not close.
17181 Oswego ROUTE 11 NORTH/FULLER RD. WD / Hastings (T) Consolidate public water supplies with past coliform and pressure violations, New Storage, New Distribution System, New System Consolidation $9,403,900 155 Project was anticipated to close during the previous funding cycle and was excluded from the draft IUP. Project did not close.
17514 Cattaraugus DELEVAN VILLAGE / Delevan (V) New Surface Water Treatment Rule Compliance Facility, Upgrade Ground Water Source, Upgrade Storage, Upgrade Distribution System $1,608,425 145 New project with engineering report received after draft IUP printing.
17535 Saratoga SOUTH GLENS FALLS VILLAGE / South Glens Falls (V) Proposed Membrane Filtration Plant with SCADA to treat Village GWUDI spring sources., New Surface Water Treatment Rule Compliance Facility, New Surface Water Treatment Rule Compliance Facility $4,220,000 135 New preapplication received after draft IUP printing.
16496 Ulster NAPANOCH WATER DISTRICT / Wawarsing (T) New Ground Water Source, New Transmission $7,649,100 135 Project was anticipated to close during the previous funding cycle and was excluded from the draft IUP. Project did not close.
17516 St.Lawrence OSWEGATCHIE (T) / Oswegatchie (T) Joint water system improvement project between (T) Oswegatchie, (T) Lisbon and (V) Huevelton, Upgrade Ground Water Source, Upgrade Storage, Upgrade Distribution System, New Inter-Connection, New System Consolidation $10,973,000 120 New project with engineering report received after draft IUP printing.
17513 Essex WINEBROOK HILLS WD / Newcomb (T) New Ground Water Source, Upgrade Distribution System $1,412,130 105 New pre-application received after draft IUP printing.
17512 St.Lawrence NEWTON FALLS WATER DISTRICT / Clifton (T) New Ground Water Source $800,000 90 New project with engineering report received after draft IUP printing.
17523 Orange MONTGOMERY W.D. #1 / Town of Montgomery Extend WD #1 to consolidate several water supplies, New System Consolidation $269,730 90 New project with engineering report received after draft IUP printing.
17543 Saratoga MOREAU WD 7 / Moreau (T) New Water District to connect about 135 homes with wells, loop several large areas, connect 2 small CWSs, and consolidate WD 1., Extend Distribution System, New Water District $2,572,000 80 New pre-application received after draft IUP printing.
17510 Oswego NORTH AREA WD / Volney (T) New Distribution System, New System Consolidation $6,540,000 80 New project with engineering report received after draft IUP printing.
17533 Clinton CHAMPLAIN VILLAGE / Champlain (V) Upgrade Water Treatment Plant, New Storage, Upgrade Distribution System $1,883,226 75 New project with engineering report received after draft IUP printing.
17526 Allegany WELLSVILLE WATER DISTRICT / Wellsville (T) Extend Distribution System, New Water District $1,192,450 70 New project with engineering report received after draft IUP printing.
17530 Hamilton HAMLET OF INLET / Inlet (T)   $2,674,765 65 New pre-application received after draft IUP printing.
17548 Albany MENANDS VILLAGE / Menands (V) Upgrade Pump Station, Upgrade Distribution System $5,655,000 60 New project with engineering report received after draft IUP printing.
17553 Oneida HAMLET OF VIENNA WD / Vienna (T) Extend Distribution System $4,935,050 60 New pre-application received after draft IUP printing.
17547 Broome WHITNEY POINT VILLAGE / Whitney Point (V) New Wells, Main Street Wellfield/Pumphouse Improvements., Upgrade Ground Water Source, New Ground Water Source $470,000 55 New project with engineering report received after draft IUP printing.
17529 Jefferson TIBBETS POINT WATER DISTRICT / Cape Vincent (T) New Water District $1,962,000 55 New pre-application received after draft IUP printing.
17536 Washington FORT EDWARD VILLAGE / Fort Edward (V) Replacement of water main beneath Hudson River to Rogers Island., Upgrade Transmission $160,200 50 New pre-application received after draft IUP printing.
17545 Fulton JOCKEYVILLE ESTATES II / Saratoga LLC Install transmission main of 2000 feet length to connect existing MHP with municipal PWS., Extend Transmission $92,000 50 New pre-application received after Draft IUP printing.
17546 Fulton SANDYLAND MHP / Sandyland MHP Transmission Main of 1200 feet to connect existing MHP to municipal PWS extension., Extend Transmission $60,000 50 New pre-application received after Draft IUP printing.
17521 Ontario RUSHVILLE VILLAGE / Rushville (V) New Pump Station $473,800 45 New pre-application received after draft IUP printing.
17507 Ontario SENECA WD NO.1 / Seneca (T) New Complete System (New System), New Pump Station, New Distribution System $1,529,500 45 New preapplication received prior to draft IUP printing. Was omitted from draft IUP due to data input error.
17511 Ontario CANANDAIGUA CITY / Canandaigua (C) Upgrade Storage, New Storage $4,893,145 30 New preapplication received after draft IUP printing.
17517 Niagara LOCKPORT CITY WTP / Lockport (C) Replace waterline on Market St. between Union and Spring , Upgrade Distribution System $640,000 30 New project with engineering report received after draft IUP printing.
17524 Westchester NORTH CASTLE WD #2 / Town of New Castle New well and storage, New Ground Water Source, New Storage $1,458,695 25 New project with engineering report received after draft IUP printing.
17540 Genesee OAKFIELD VILLAGE / Oakfield (V) Upgrade Transmission, Upgrade Storage, Upgrade Distribution System $1,147,575 25 New Project with engineering report received after draft IUP printing.
17542 Monroe WEBSTER VILLAGE / Webster (V) Upgrade Storage $400,826 25 New pre-application received after draft IUP printing.
17551 Orange ARLUCK WATER DISTRICT / Wawayanda (T) Replacement of existing hydropneumatic system for the Arluck WD, Upgrade Pump Station $85,000 20 New preapplication received after draft IUP printing.
17525 Westchester NORTH CASTLE WD #1 / Town of North Castle Rehabilitation of water storage tanks, Upgrade Storage $813,500 15 New project with engineering report received after draft IUP printing.
17527 Genesee OAKFIELD VILLAGE / Oakfield (V) Upgrade Transmission, Upgrade Distribution System $1,147,575 15 New project with engineering report received after draft IUP printing.
17539 Rensselaer CASTLETON VILLAGE PWS / Castleton-on-Hudson (V) Replacement in-kind of aged water mains., Upgrade Distribution System $1,661,400 10 New project with engineering report received after draft IUP printing.
17532 Erie EXTENSION OF WD#2 / Boston (T) Extend Water District $2,324,177 5 New preapplication received after draft IUP printing.
17531 Erie BOSTON WD #2 / Boston (T)   $2,499,100 5 New preapplication received after draft IUP printing.